Laserfiche WebLink
BUILD <br />·Bore Footage(s): <br />·Trench Footage(s): <br />·Rock Saw Footage(s): <br />·Emt Footage(s): <br />·Bore Pit(s): <br />·Dig Pit(s): <br />·Potholes (2X2): <br />·New Catv Vault(s): <br />·Existing Catv Vault(s): <br />·Existing Pole(s): <br />·New Pole(s): <br />·Riser Footage: <br />·Existing Pedestal(s): <br />·Overpull Existing Conduit: 430 <br />·(N)Overlash Footage: <br />·Concrete R&R(Sq. FT.) <br />·Asphalt R&R(Sq. FT.) <br />·Total Footage: 430 <br />VICINITY MAP <br />LEGEND <br />·Sheet 1: Cover-Title <br />·Sheet 2: Legends <br />·Sheet 3: Scope of Work <br />·Sheet 4: TCP General Notes and Tables <br />·Sheet 5-6: Traffic Control Plan <br />Scope of work: <br />JOB NO# JB892632 <br />WORK LOCATION:24511 N 99 Frontage, Acampo CA 95220 <br />Work Duration: 3 Days <br />Tie in to existing pole. Overlash 250' North and then proceed with <br />overlash 80' East. Place Drop from new tap and overlash 100' to target <br />building.COMCAST <br />PROPOSED DIRECTIONAL DRILL