Laserfiche WebLink
CONSTRUCTION NOTES <br />O PLACE NEW 10' GROUND BED <br />2O PLACE NEW 10' GROUND BED <br />O3 PLACE NEW 10' GROUND BED <br />NOTE:- SEE SHEET #13 FOR TYPICAL BACKFILL DETAIL <br />NOTE:- SEE SHEET #14 FOR GROUND BED DETAIL OX <br />O & <br />X <br />,PO _ <br />Ox <br />OX O,o <br />"DO <br />APN:019-060-25 <br />Site 21 <br />No monuments <br />found in work <br />zone. <br />(o <br />GAO <br />�O, \ Site 23 <br />so G No monuments <br />found in work <br />P \ <br />�o zone. <br />AP N-019-060-27 <br />7te72 <br />Found brass disc in <br />concrete hub. <br />Stamped "Corps of <br />Engineering U.S. Army <br />Survey Mark". <br />EX CA VA T/ O N DA TA <br />OWNER <br />ASPHALT <br />DIRT <br />CONCRETE <br />COUNTY <br />OF SAN JOAQUIN <br />(3) 10'X 1 '= 30 SQ. FT. <br />FAPN-019-060-25 <br />Call USA @ 811 <br />48hrs prior to start of work <br />SAFETY NOTE <br />WORK AREA WILL INCLUDE LANE <br />CLOSURE ON ROAD WITH VERY HIGH <br />TRAFFIC VOLUME. PLEASE PROVIDE <br />COMPLETE WORK AREA PROTECTION. <br />M.O.P REQUIRED <br />CATEGORY - 3 <br />FOLLOW PROCEDURES AS DETAILED IN <br />NORTHERN SECTOR PLAN FOR PROTECTION <br />OF UNDERGROUND AND BURIED CABLE <br />M.O.P. DATED <br />GENERAL NOTES: <br />1. CONTRACTOR SHALL REQUEST LOCATION OF <br />UNDERGROUND FACILITIES BY USA <br />2. CONTRACTOR WILL COMPLY WITH ALL <br />SAN JOAQUIN COUNTY REGULATIONS FOR SPLICE <br />PIT & SURFACE COMPACTION <br />3. CONTRACTOR WILL RETURN WORK AREA BACK <br />TO ORIGINAL OR BETTER CONDITION PRIOR TO <br />START OF WORK <br />4. MAINTAIN 48" MINIMUM COVER <br />0' 1/2" 1" <br />0' 10' 20' <br />