My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2022_PS-2200001 thru PS-2200500_ - PS-2200483
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2022
>
PS-2200001 thru PS-2200500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2022_PS-2200001 thru PS-2200500_ - PS-2200483
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2022 8:47:18 AM
Creation date
10/12/2022 8:46:00 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2200483
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2022
Notes2
4124 West Ln.
Address
PO Box 930, Stockton,CA 95201
Application
Pacific Gas & Electric-Stockton
Type
Bell Hole
Supplemental fields
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
WEST LNENTERPRISE STwww.trafficmanagement.com800.763.3999California · Great Lakes · New YorkTraffic Control Services - Sales & RentalsPermits & Consulting - Engineering - TrainingRECOMMENDED ADVANCE WARNING SIGN SPACING TABLE(CA MUTCD 2014, REV 4 EDITION, TABLE 6C-1. SEE TABLE FOR ADDITIONAL DETAILS)ROAD TYPEDISTANCE BETWEEN SIGNS (FT)A BCURBAN - 25 MPH OR LESS 100 100 100URBAN - 30 MPH TO 40 MPH 250 250 250URBAN - 45 MPH AND ABOVE350 350 350RURAL 500 500 500EXPRESSWAY / FREEWAY 1000 15002640GENERAL NOTES1THIS PLAN CONFORMS TO THE CA MUTCD, LATEST EDITION.2THE LOCATION OF THE SIGNS SHOWN ON THE PLAN ARE GUIDELINES AND THE ACTUAL LOCATION WILL DEPEND UPON ALIGNMENT, GRADE, LOCATION OF THE STREETINTERSECTIONS, AND 85TH PERCENTILE SPEED.3NOTIFY LOCAL LAW ENFORCEMENT, FIRE, AND AMBULANCE COMPANIES WITHIN 72 HOURS BEFORE CONSTRUCTION BEGINS. KEEP OPEN ACCESS FOR EMERGENCYVEHICLES AT ALL TIMES.4CONTINUAL MONITORING AND MAINTENANCE OF THE TRAFFIC CONTROL ZONE WILL BE IMPLEMENTED FOR THE PURPOSE OF MAINTAINING EMERGENCY ACCESS, AND TOPROVIDE ACCOMMODATIONS FOR PEDESTRIANS, BICYCLE TRAFFIC AND THE DISABLED.5PROPERLY TRAINED TRAFFIC CONTROLLERS, PROPER DEVICES, & PROPER USE OF THE DEVICES ARE REQUIRED AT ALL TIMES.6ALL SIGNS IMPLEMENTED WILL ONLY BE VIEWABLE WHEN IN USE, OTHERWISE ALL WARNING DEVICES ARE TO BE TAKEN DOWN OR COVERED.7NOTHING WILL BE ALLOWED IN BUFFER/TRANSITION AREA(S) AT ANY TIME.8ALL CONFLICTING MARKINGS ARE TO BE REMOVED FOR PROJECTS THAT LAST THREE (3) CONTINUOUS DAYS OR LONGER.9 ALL SIGNAGE AND CHANNELIZING DEVICES MUST BE RETROREFLECTIVE OR ILLUMINATED DURING THE NIGHT. MINIMUM VISIBILITY SHALL BE 1000 FEET.10ONLY ONE SIDEWALK WILL BE CLOSED AT A TIME. PEDESTRIAN AND DISABLED ACCESS TO BE MAINTAINED PER CA MUTCD STANDARDS.11CONTACT UNDERGROUND SERVICE ALERT (USA) 48 HOURS PRIOR TO ANY EXCAVATION FOR POTENTIAL UTILITY CONFLICTS.PG&E
The URL can be used to link to this page
Your browser does not support the video tag.