Laserfiche WebLink
NOTE o EXHIBIT <br /> 1. If the distance between cross—cuts are less then 1508 the entire area <br /> between cross—cuts shall he planed and resurfaced with one (1) inch of <br /> Mphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard <br /> Drawing No.' R-290 <br /> 3. Resurfacing for Bell doles shall most these requirements. If excavation occurs <br /> within the shoulder or lanes only that area shall be resurfaced as shown. <br /> 4. If cross—cutting is performed on Local Rads at intervals less then 150" <br /> Seal Coat for that half of the roadway containing the trench can he used in <br /> lieu of resurfacing. Section 3910.3 (8-2). <br /> +, <br /> � Q <br /> B � <br /> L O O <br /> CO O <br /> CD a <br /> ca <br /> Paved Shoulder--- 'x Q <br /> CL) <br /> O O <br /> N L <br /> W C U <br /> T <br /> 4 <br /> O <br /> ' r <br /> i <br /> O <br /> f <br /> OI 1 I <br /> Q) 1 <br /> W <br /> l <br /> O � <br /> U <br /> V) <br /> E O <br /> L_ <br /> J U <br /> A <br /> Approved by: <br /> CRSS CUTTING OF <br /> COUNTY ROADWAYS <br /> m <br /> _ _ U_ <:•• _-• .,.� �:..rY�fi�l ifs <br /> CO UNTY OF SAN TOA Q UTV <br /> DEPARTI=OF PUBLIC WORKS <br /> . FIF <br /> - Orae by-. D:cby-. o 8/2_Z/j2 <br />