Laserfiche WebLink
DEL MAR <br />AVE. <br />SIDEWAL <br />K <br />SHOULD <br />E <br />R <br />SIDEWAL <br />K <br />MS #2 <br />POLE #77 <br />FLAGGER <br />250'250'100' BUFFER 250' <br />FLAGGER <br />E.O.P. <br />E.O.P. <br />E.O.P.100'E.O.P.E.O.P.E.O.P.E.O.P.SHOULDER <br />SHOULDER <br />CONTACT PROPERTY OWNER(S) 72 <br />HOURS PRIOR TO START OF WORK. <br />FLAGGERS SHALL REMAIN IN <br />COMMUNICATION VIA RADIO AT <br />ALL TIMES. <br />SPEED <br />LIMIT <br />35 <br />E MAIN <br />ST. <br />SPEED <br />LIMIT <br />35 <br />E MAIN <br />ST. <br />SPEED <br />LIMIT <br />25 <br />PAINTED MEDIAN <br />E.O.P.100'S <br />S WAGNER <br />AVE.SIDEWALKE.O.P.E.O.P.250' <br />100' BUFFER <br />250' <br />250' <br />SHOULD <br />E <br />R <br />SIDEWAL <br />K <br />SIDEWAL <br />K <br />SIDEWAL <br />K <br />SHOULD <br />E <br />R <br />PVT. ROAD <br />(HENRY ELEMENTRY SCHOOL)SIDEWALK4833 E MAIN ST. <br />FOR TEMPORARY STOPPAGE <br />ESTIMATED TIME OF COMPLETION <br />IS 5-10 MINUTES. <br />CONTRACTOR TO COORDINATE <br />WORK HOURS WITH LOCAL <br />SCHOOL ADMINISTRATION <br />HENRY ELEMENTRY SCHOOL <br />FOGLINE <br />FOGLINE <br />T.A.N.S.A.T. <br />(ON BOTH SIDES) <br />LOCATION MAP <br />TC-11 1:50 <br />A028THS <br />= TRAFFIC CONE WITH CLIP ON SIGN <br />FOR DAY/NIGHT USE OR DELINEATORS IF DAY USE ONLY <br />= 28" (11cm) TRAFFIC CONES W/ 13" (5cm) REFLECTIVE SLEEVE <br />LEGEND <br />= FLAGGER <br />= EXISTING DRIVEWAY <br />= HIGH LEVEL WARNING DEVICE (FLAGTREE) <br />= FLASHING ARROWBOARD <br />= SIGNALIZED INTERSECTION <br />= TOW AWAY NO STOPPING ANY TIME <br />= TYPE III BARRICADE W/SIGN (5'H x 4'W) <br />= TYPE II BARRICADE W/SIGN (3'H x 2'W) <br />= TYPE I W/ SIGN <br />= DIRECTION OF TRAFFIC <br />= PORTABLE FLASHING BEACON (P.F.B.) <br />= WORK ZONE (ACTIVITY AREA) LIMITS <br />= EXISTING SIGN <br />4833 E MAIN ST. <br />E MAIN ST. & DEL MAR AVE. <br />-AERIAL CROSSING <br />WORK AREA 1 OF 2 <br />PHASE 8 OF 12 <br />N <br />TC-16 <br />MAINTAIN DRIVEWAY ACCESS <br />AT ALL TIMES <br />PAGE: OF <br />TYPE OF CONSTRUCTION: <br />JOB NUMBER: <br />SCALE: <br />01-07-22 <br />ISSUE DATE <br />1 <br />PHASE 8 OF 12 <br />AERIAL CROSSINGPHASE 8 OF 12