My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2013_PS-1301001 thru PS-1301500_ - PS-1301336 (2)
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2013
>
PS-1301001 thru PS-1301500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2013_PS-1301001 thru PS-1301500_ - PS-1301336 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:16:52 PM
Creation date
12/30/2015 5:43:41 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1301336 (2)
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2013\PS-1301001 thru PS-1301500
Year2
2013
Supplemental fields
Applicant
PRESTON PIPELINE, INC.
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
N/S OF DODDS RD. 0.5 MILE W/O ESCALON BELLOTA RD.
Primary Parcel
Type (2)
PS-1301336
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Special Conditions for -3- <br /> ENCROACHMENT PERMIT <br /> 25. In addition to standard dust control measures, streets shall be maintained in a clean condition, <br /> free of dirt, mud and debris during construction activities. The contractor shall provide daily, or as <br /> needed, street sweeping using a modern mechanical or vacuum-assisted street sweeper. <br /> 26. The contractor shall not conduct construction operations in rain or heavy fog conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.