My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2022_PS-2200001 thru PS-2200500_ - PS-2200276
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2022
>
PS-2200001 thru PS-2200500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2022_PS-2200001 thru PS-2200500_ - PS-2200276
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2022 2:26:48 PM
Creation date
10/12/2022 2:25:01 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2200276
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2022
Notes2
E/S of Tully Rd. 2577' S/O Baker Rd.
Address
1445 Van Ness Ave., Fresno,CA 93721
Application
AT&T-Fresno (Valley Permit Desk)
Type
Trench;Aerial Work
Supplemental fields
Cross Ref
PWP730079
Type (2)
Encroachment Permit (EP)
Callout
ID:
1
Creator:
Created:
10/12/2022 2:25 PM
Modified:
10/12/2022 2:25 PM
Text:
No monuments found in construction zone.
Text box
ID:
1
Creator:
Created:
10/12/2022 2:25 PM
Modified:
10/12/2022 2:25 PM
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0+00CL0+00CL0+00 CL <br />0+10 EOP <br />P/L0+20 R/W <br />0+20 R/W <br />0+10 EOP <br />0+10 EOP <br />0+20 R/W <br />0+20 R/W <br />0+10 EOP <br />10' DIRT <br />10' DIRT <br />EXIST. POLE#115320 N TULLY RDAPN: 09110034P/L5445 N TULLY RDAPN: 09110020DRIVEWAYDRIVEWAYE BAKER RDN TULLY RD <br />10'2577'EXIST. CUSTOMER SB16'1N POLEFOCFACE OF CURBPROPOSED CONDUITR/WRIGHT OF WAYCLCENTERLINELEGENDBOSBACK OF SIDEWALKSSTOP SIGNCSWCONCRETE SIDEWALKCONSTRUCTION NOTESSAFETY NOTE WORK AREA WILL INCLUDE LANECLOSURE ON ROAD WITH VERY HIGHTRAFFIC VOLUME. PLEASE PROVIDECOMPLETE WORK AREA PROTECTION.GENERAL NOTES:1. CONTRACTOR SHALL REQUEST LOCATION OFUNDERGROUND FACILITIES BY USA2. CONTRACTOR WILL COMPLY WITH ALLSAN JOAQUIN COUNTY REGULATIONS FOR SPLICEPIT & SURFACE COMPACTION3. CONTRACTOR WILL RETURN WORK AREA BACKTO ORIGINAL OR BETTER CONDITION PRIOR TOSTART OF WORK4. MAINTAIN 48" MINIMUM COVEREXCAVATION DATAEOPEDGE OF PAVEMENT1FOLLOW PROCEDURES AS DETAILED INNORTHERN SECTOR PLAN FOR PROTECTIONOF UNDERGROUND AND BURIED CABLEM.O.P. DATEDM.O.P REQUIREDCATEGORY - 3Call USA @ 81148hrs prior to start of work1/2"0'1"FENCE CHC Consulting01/06/20210'20'10'VIA TRENCHPM 1 DU 10'PL. 10' 1-4'' DUCTPTS 77 OR EQUIV.NO SCALECement Slurry Backfill(AT&T)PROPOSED EXCAVATIONREPLACE BASE AND FINISHEDSURFACE EQUAL TO OR GREATERTHAN EXISTING AS PER AGENCYSTANDARDS AND APPROVAL OFCITY, COUNTY OR STATE INSPECTOR.36" Min. Cover12"Existing GradeBelow Existing GradeTYPICAL CONDUIT DEPTH DETAIL (DIRT)TYPICAL TRENCH DETAIL1-4'' DUCTFOR STANDARD TRENCH BACKFILL DETAIL SEE SHEET#2POLE #11TOP VIEWEOP EOPN TULLY RD <br />PL. 1-4'' DUCT3'' FIBER3'' EMPTY4'' POWER
The URL can be used to link to this page
Your browser does not support the video tag.