Laserfiche WebLink
:-1 <br />California MU T CD 2014 Edition Page 1137 <br />(p'HWA's MUTCD 2000 Edition, including Revisions 1 & 2, as amended for use in California) <br />Tak 6tif4&Q. Tapes F -Milli Criteria forTempwxy Traffic Control Zares <br />(for 12 fed OffsetWkkh) i'• <br />Spit' <br />SSW" <br />() <br />ti�irpm Tape' Leia,�h" . <br />far Width of Flffset 12 feet (lvlj <br />S erg U3 <br />(feet (feet) <br />. Down <br />Stream <br />20 <br />80 <br />40 27 <br />50 <br />25 <br />125 <br />63 42 <br />50 <br />30 <br />180 <br />90 60 <br />5o <br />35 <br />245 <br />123 82 <br />50 <br />40 <br />320 <br />160 107 <br />50 <br />45 <br />540 <br />270 180 <br />50 <br />50 <br />600 <br />300 200 <br />50 <br />55 <br />660 <br />330 220 <br />50 <br />60 <br />720 <br />360 240 <br />50 <br />65 <br />780 <br />390 260 <br />50 <br />70 <br />840 _C; <br />420 28& <br />50 <br />75 <br />900 1 <br />450 300 <br />50 <br />-Posted speed Imit, off-peak 851 -percentile speed prior to work starting, or the anticipated operating <br />speed in mph. <br />" <br />-For other offsets use the following merging taper length formula for L• <br />For speeds of 40 mph or less, L=WSZl60 0 <br />For speeds of 45 mph or more, L=WS r <br />Where: L = taper length In feet <br />W = width of offset in feet <br />S = posted speed limit, off-peak 85'" -percentile speed prior to work <br />starting, or the anticipated operating speed In mph <br />*'* - Maximum downstream taper length Is 100 feet. See Section 6C.08. <br />Chapter 611 —Typical Applications <br />Part 6 —Temporary Traffic Control <br />i <br />November 7, 2014 i <br />C; <br />