® <br />NEW COMCAST POWER SUPPLY <br />LINETYPES <br />NEW COMCAST LOW PROFILE <br />CE B <br />POWER SUPPLY W/ METER <br />GENERAL NOTES: <br />NEW COMCASTVAULT <br />CE <br />NEW COMCAST PEDESTAL <br />® <br />BORE PIT <br />PROPOSED BORE ROUTE <br />NEW RISERATTACHED TO POLE <br />EXISTING POLE <br />EXISTING COMCASTVAULT <br />® <br />EXISTING COMCAST PEDESTAL <br />NEW AERIAL STRAND <br />EXISTING IRRIGATION VAULT <br />® <br />EXISTING UTILITY VAULT/PEDESTAL <br />©® <br />GAS/WATERVALVE <br />TREE/BUSHES <br />PHHTTT <br />1, <br />ALL VAULTS/ HANDHOLES TO BE EQUIPPED WITH SECURITY LIDS WITH LOCKING BOLTS. <br />STREET SIGN <br />PROPOSED TRENCH/ VSW ROUTE <br />CAN <br />CM <br />NEWAERIAL ROUTE <br />2. <br />GROUND RESTORATION/RIGHT-OF-WAY SHALL BE RESTOREDTO ORIGINALOR BETTER CONDITION <br />... <br />CATV <br />EXISTING COMCAST ROUTE <br />3. <br />ALL DEGREE BENDS IN CONDUIT CONSTRUCTION WILL BEA MINIMUM OF 36" RADIUS UNLESS <br />T <br />T <br />EXISTING TELEPHONE SYSTEM <br />SPECIFIED OTHERWISE. <br />.® <br />g <br />® <br />EXISTING ELECTRICAL SYSTEM <br />EXISTING GAS SYSTEM <br />4. <br />BURIED FIBER OPTIC WARNING SIGNS SHALL BE PLACED AT EACH SIDE OF ALL ROAD CROSSINGS <br />AT CULVERTS, DITCHES AND IN A STRAIGHT LINE OF SIGHT SPACING OF APPROXIMATELY 500 FEET <br />CATV <br />CATV <br />EXISTING TV SYSTEM <br />offi <br />EXISTING IRRIGATION SYSTEM <br />5. <br />DEVIATIONS FROM THE ENGINEERED ROUTE REQUIRES A PROJECT MANAGER AND RIGHT-OF-WAY <br />OWNER OR CARETAKER APPROVAL PRIOR TO CONSTRUCTION. <br />rT <br />rT <br />rT <br />EXISTING JOINT TRENCH <br />SS <br />ss <br />ss <br />EXISTING SANITARY SEWER <br />6. <br />WHERE PERMITS FROM STATE, COUNTY, CITY, RAILROAD OR GOVERNMENT AGENCIES ARE <br />60 <br />60 <br />60 <br />EXISTING STORM DRAIN <br />REQUIRED, ALLWORK PERFORMED WILL COMPLY WITH THESE AGENCIES STANDARD <br />SPECIFICATIONS. <br />w <br />w <br />w <br />EXISTING WATER LINE <br />x <br />x <br />x <br />EXISTING FENCELINE <br />7. <br />THE PROJECT MANAGER WILL NOTIFY BUILDING MANAGEMENT WHEN WORK WILL BEGIN ON <br />C/c <br />C/c <br />ROADWAYCENTER LINE <br />BUILDING. CONTRACTOR TO COORDINATE ROOM ACCESSAND WORK STARTAND STOP TIMES <br />WITH BUILDING MANAGEMENT. <br />PROPERTY LINE <br />ROW LINE <br />B. <br />THE PROJECT MANAGER IS TO BE NOTIFIED BY THE CONTRACTOR 24 HOURS PRIOR TO <br />EASEMENT LINE <br />CONSTRUCTION. SEE COMPANY CONTACT LIST FOR CONTACT NAME(s) AND TELEPHONE <br />NUMBER(s). <br />EOP/FOC/S/W <br />ABBREVIATIONS <br />9. <br />THE PROJECT MANAGER WILL RESERVE THE RIGHT TO INSPECT AT ANY TIME THE WORK BEING <br />PERFORMED BY THE CONTRACTOR. IF PROJECT MANAGER DETERMINES THAT THE WORK IS NOT <br />COMCAST <br />COMCAST <br />PL <br />PROPERTY LINE <br />BEING PERFORMED TO M INIMUM QUALITY STANDARDS, THEN THE CONTRACTOR SHALL PROVIDE <br />CENTERLINE <br />PUT <br />PUBLIC UTILITY EASEMENT <br />REWORK AT HIS OWN COST. <br />(EXIST.) <br />EXISTING <br />ROW <br />RIGHT OFWAY <br />FOC <br />FACE CURB <br />SD <br />R EXISTING STORM DRAIN <br />MIN <br />MINIMUM <br />MINIMUM <br />SS <br />EXISTING SANITARY SEWER <br />10. <br />ANY CHANGE IN PROJECT SCOPE, INCLUDING BUT NOT LIMITED TO, CONDUIT LENGTH, CONDUIT <br />MAX <br />MAXIMUM <br />T <br />EXISTING TELEPHONE <br />PATH, AERIAL PATH ETC., MUST BE APPROVED BY THE PROJECT MANAGER. <br />CDT <br />CONDUIT <br />W <br />EXISTING WATER <br />BOW <br />BACK OF WALK <br />E <br />EXISTING ELECTRIC <br />11. <br />ALL CORI N G/CONSTRUCTION THAT WILL CAUSE NOISE AND/OR VIBRATION SHALL BE DONE WITHIN <br />DOW <br />FRONT OF WALK <br />IRR <br />EXISTING IRRIGATION <br />ALLOWED (9AM-3PM) BUSINESS HOURS. <br />EOP <br />EDGE OF PAVEMENT G <br />EXISTING GAS <br />12. <br />ANY AND ALL UNDERGROUND UTILITIES ENCOUNTERED ARE THE RESPONSIBILITY OF THE <br />SYMBOLS <br />CONTRACTOR TO LOCATE, PROTECT, AND REPAIR, IF DAMAGED. <br />® <br />NEW COMCAST POWER SUPPLY <br />SS <br />NEW COMCAST LOW PROFILE <br />CE B <br />POWER SUPPLY W/ METER <br />Is <br />NEW COMCASTVAULT <br />CE <br />NEW COMCAST PEDESTAL <br />® <br />BORE PIT <br />�® <br />NEW RISERATTACHED TO POLE <br />EXISTING POLE <br />EXISTING COMCASTVAULT <br />® <br />EXISTING COMCAST PEDESTAL <br />O <br />EXISTING IRRIGATION VAULT <br />® <br />EXISTING UTILITY VAULT/PEDESTAL <br />©® <br />GAS/WATERVALVE <br />TREE/BUSHES <br />PHHTTT <br />POTHOLE <br />h <br />STREET SIGN <br />Q TRANSFORMER <br />{ )—p STREET LIGHT <br />® CATCHBASIN <br />SD STORM DRAIN MANHOLE <br />®W <br />TRAFFIC SIGNAL COMBINATION <br />SS <br />FIRE HYDRANT <br />® <br />SEWERCLEAN OUT <br />14. ALL BURIED CONDUIT/CABLE WILL BE PLACED AT 36" MINIMUM COVER. SITE HAS POTENTIAL FOR <br />MONUMENT <br />® CATCHBASIN <br />SD STORM DRAIN MANHOLE <br />®W <br />WATER MANHOLE <br />SS <br />SANITARYSEWER MANHOLE <br />® <br />SEWERCLEAN OUT <br />14. ALL BURIED CONDUIT/CABLE WILL BE PLACED AT 36" MINIMUM COVER. SITE HAS POTENTIAL FOR <br />ELECTRIC MANHOLE <br />® <br />UNIDENTIFIED MANHOLE <br />Q <br />WATER METER <br />[] GAS METER <br />FIBER PLACEMENT NOTES <br />1. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES 46 HOURS <br />PRIOR TO CONSTRUCTION ACTIVITY SEE LOCAL DIRECTORY FOR CONTACT <br />TELEPHONE NUMBER OF LOCAL CALL BEFORE YOU DIG AGENCY. <br />2. CONTRACTOR SHALL RECORD SEQUENCE # OF FIBER CABLE AT EVERY <br />WORK POLE, MANHOLE, FIBRE STORAGE LOOP AND TAIL LOCATION. <br />CONTRACTOR TO PROVIDE PROJECT MANAGER WITH SEQUENCE <br />NUMBERS AT PROJECT COMPLETION. <br />3. SLACK LOOP AND SNOWSHOE STORAGE LOCATIONS SHALL BE <br />DETERMINED ON CONSTRUCTION DRAWINGS, HOWEVER, REEL LENGTHS <br />OF FIVE HUNDRED FEET (500') OR LESS ON LARGE COUNT FIBER OR THREE <br />HUNDRED (300') OR LESS ON SMALL COUNT FIBER ARE DIFFICULTTO USE <br />AND SHOULD BE PLACED AS FSL'S, NOT CUTAND RETURNED. <br />4. FIBER OPTIC IDENTIFICATION TAGS SHALL BE PLACED AT EVERY WORK <br />POLE, MANHOLE, FIBER, STORAGE LOOPS, SPLICE CASES AND WHERE <br />INDICATED BY PROJECT MANAGER. TAGS NEED TO BE PLACED SO AS TO BE <br />READ FROM THE GROUND. <br />5. CABLE LUBRICATION SHALL BE USED TO REDUCE PULLING TENSION. <br />LUBRICANTS MUST NOT CONTAIN ANY PETROLEUM PRODUCTS. <br />6. A 100 FOOT FIBER COIL MUST REMAIN IN ALL VAULTS UNLESS <br />OTHERWISE NOTED. <br />7. ALL BURIED INFRASTRUCTURE MUST BE ACCOMPANIED WITH <br />WARNING TAPE ANDA TRACER WIRE, AT RISER POLES THE LOCATE WIRE <br />SHALL BE ACCESSIBLE ATTHE BASE OF THE RISER. <br />S. ALL RISERS WILL BE CAPPED AT ALL TIMES. <br />9. ALL FIBER SHALL BE MARKED AS TO DIRECTION IN EACH VAULT. <br />RED -NORTH, GREEN -SOUTH, YELLOW -EAST, AND BLUE -WEST, DO NOT <br />TAPE FIBER CABLES TOGETHER IN RISER. <br />DISCLAIMER <br />13. ALL FOOTAGES ARE BASED ON FIELD GATHERED MEASUREMENTS, AS SUCH SOME VARIANCE <br />SHOULD BE ANTICIPATED. ADJUSTAS NEEDED. <br />1. IT IS THE RESPONSIBILITY OF THE CONSTRUCTION CONSTRUCTOR TO <br />THIS IS AN COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIAL <br />VERIFY ALL RIGHT OF WAY BEFORE CONSTRUCTION IS TO BEGIN. NO <br />14. ALL BURIED CONDUIT/CABLE WILL BE PLACED AT 36" MINIMUM COVER. SITE HAS POTENTIAL FOR <br />UNDERGROUND INSTALLATION REPRESENTED WITHIN THESE PLAN <br />ROCK THAT WOULD PREVENT THE ABILITY TO PROVIDE THE MINIMUM COVER. IN CASES WHERE <br />SHEETS IS PROPOSED OUTSIDE OF THE RIGHT OF WAY. <br />THE MINIMUM COVER CANNOT BE ACHIEVED, THE CONDUIT SHALL BE PLACED INA SCH 40 EMT SLEEVE <br />1945 W A 92BBB Ave., Suite 300, <br />oro qe, CA 92868 <br />(g4q) 250-0004 / FAX (949) 250-0006 <br />OR APPROVED EQUIVALENT. <br />2. THE UNDERGROUND ROUTE DEPICTED IS PRELIMINARY AND WILL/MAY <br />VARY ONCE UTILITIES HAVE BEEN FIELD LOCATED. <br />15. WATER,SEWER, STORM SEWER AND EASEMENT LOCATIONS ARE BASED OFF OF CITY MAPS, <br />NOT FIELD VERIFIED. <br />16. BORING OF AC PAVING IS REQUIRED ATALL LOCATIONS AS INDICATED ON PLANS. <br />17. AT NO TIME SHALL CURBS, GUTTERS OR HANDICAP BE DISTURBED. <br />16. D00R HANGERS ARE TO BE PLACED A MINIMUM OF 72 H0URS PRI0R TO START OF CONSTRUCTION <br />19. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL PLACE MESSAGE BOARDS STATING LANE <br />CLOSURES, AND DELAYS A WEEK IN ADVANCE. LOCATION OF THE MESSAGE BOARD SHALL BE <br />COORDINATED WITH THE CITY INSPECTOR ATTHE PRE -CONSTRUCTION MEETING. <br />20. LANE CLOSURES CANNOT EXCEED M0RE THAN 300 FT. ATA TIME. FOR SAFETY PURPOSES THERE <br />SHALL BE ONLY ONE CLOSURE ATA TIME ALONG INTERNATIONAL BLVD. MORE FLAGGERS WILL BE <br />NECESSARY TO HELP VEHICLES AND PEDESTRIANS IN THE WORK ZONES DURING THE LANE <br />CLOSURES. <br />1 �I <br />IMPORTANT NOTICE <br />Section 4218/4217 of the Government Code requires a <br />Dig Nero Identification Number to issued before o <br />PLANS PREPARED BY: <br />,,A!yp CHC Consulting <br />'� <br />p <br />THIS IS AN COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIAL <br />DESIGN: <br />DRAWN BY: <br />REV DESCRIPTION DATE <br />C O M C A S T <br />r <br />'Permit to Excawoe' will be valid For your Dig Alert I.D. <br />CALL TOLL FREE <br />46 HOURS BEFORE YOU DIC <br />UNDERGROUND SERMCE ALERT <br />1945 W A 92BBB Ave., Suite 300, <br />oro qe, CA 92868 <br />(g4q) 250-0004 / FAX (949) 250-0006 <br />APPROVED: <br />APPROVED: <br />1-600-227-2600 <br />APPROVED: <br />3. ANCHORING FOR THE AERIAL CONSTRUCTION IS TYPICALLY <br />DETERMINED DURING CONSTRUCTION AND IS COLLECTED IN THE <br />AS -BUILT PHASE. <br />1190101041016*1 <br />CONSTRUCTION TYPE: OVERLASH, RISER, TRENCH, PED ACCESS & BORE PL. <br />COUNTY: SAN JOAQUIN <br />DRAWN BY: RISHABH SHARMA <br />COMCAST CONTACT: MICHELE OKAMOTO TEL NO: (925) 768-8470 <br />DATE: 1/15/2022 SHEET: 2 OF 16 <br />