Laserfiche WebLink
050100150SIGN PANEL SIZELEGENDCONTRACTOR NOTES:1. ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE LATEST EDITION OF CALIFORNIA MANUAL OF UNIFORM TRAFFICCONTROL DEVICES (MUTCD) AND CALTRANS STANDARD PLANS AND SPECIFICATIONS.2. THE LOCAL FIRE DEPARTMENT, SHERIFF/POLICE DEPARTMENT, CALIFORNIA HIGHWAY PATROL, LOCAL SCHOOL DISTRICT,TRANSIT SERVICE PROVIDERS AND UNITED STATES POSTAL SERVICE SHALL BE NOTIFIED 72 HOURS IN ADVANCE OFCONSTRUCTION WORK.3. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE REPAIR OF ANY DAMAGE TO EXISTING IMPROVEMENTS RESULTING FROMTHE CONTRACTOR'S OPERATION. THIS REPAIR SHALL INCLUDE ALL CONSTRUCTION AND MATERIALS TO RESTORE THE SITE TOEXISTING CONDITIONS.4. EACH ADVANCED WARNING SIGN ON EACH SIDE OF THE ROADWAY SHALL BE EQUIPPED WITH AT LEAST TWO FLAGS. FLASHINGBEACONS SHALL BE PLACED AT THE LOCATION INDICATED FOR LANE CLOSURE DURING HOURS OF DARKNESS.5. ALL WORKERS SHALL BE EQUIPPED WITH A REFLECTIVE VEST AND HARD HAT. ALL FLAGGERS SHALL ALSO BE EQUIPPED WITH AC28 "STOP/SLOW" PADDLE AND SHALL BE TRAINED IN THE PROPER FUNDAMENTALS OF FLAGGING TRAFFIC.6. NO PARKING SIGNS SHALL BE PLACED 72 HOURS PRIOR TO SET UP. SIGNS SHALL BE POSTED EVERY 20 LINEAR FEET OFOCCUPIED SPACE WITH AT LEAST ONE SIGN AT EACH END OF OCCUPIED SPACE.7. ANY CONFLICTING SIGNS WILL BE COVERED FOR THE LENGTH OF THE JOB.8. CONTRACTOR SHALL MAINTAIN EMERGENCY VEHICLE AND DRIVEWAY ACCESS AT ALL TIMES.9. Y&C TRANSPORTATION CONSULTANTS, INC. ASSUMES NO LIABILITY WHEN CONTRACTOR DOES OWN SET UP OR MAKES CHANGESTO THE ORIGINAL TRAFFIC CONTROL PLAN.10. CITY/COUNTY ENGINEER OR HIS REPRESENTATIVE HAS THE AUTHORITY TO INITIATE FIELD CHANGES TO ASSURE PUBLIC SAFETY.11. CONTRACTOR SHALL PLATE EXCAVATED AREA DURING NON-WORKING HOURS.A= TEMPORARY SIGN POST= TRAFFIC FLOW DIRECTION48" X 48"= PORTABLE FLASHING BEACON48" X 24"DExp. 3/31/22No. 44611K. DANIEL YAUCIVIL250'500'500'500'500'500'100' TAPER280' TANGENT230' TANGENT100' TAPER500' BUFFER140'500'500'500'500'500'C45 (CA)AW3-4AC9A (CA)AW20-4AW20-1ARUMBLESTRIPS= RUMBLE STRIP (SEE SHEET T13 ON CALTRANS STD PLAN)W3-4AC9A (CA)AW20-4AC45 (CA)ARUMBLESTRIPSW20-1ADG20-2DG20-2= CHANNELIZER (SPACING PERTABLE 1 ON CALTRANS STD PLAN T9)BYRON RDVON SOSTEN RD19,250 SQ FTWORK AREARECTIFIERANODETRENCH4' X 4'EXCAVATION