Laserfiche WebLink
PS-1302555 September 23. 2013 <br /> SPECIAL CONDITIONS FOR <br /> ATT— DELTA WATER PIPELINE PROJECT <br /> ENCROACHMENT PERMIT <br /> 1. Maintain traffic controls for all roads. Traffic control delays shall not exceed 15 minutes. <br /> Two-way traffic shall be maintained during non-working hours with excavated areas backfilled or <br /> plated. During working hours, two-way traffic control shall be maintained with one lane open and <br /> appropriate flaggers. <br /> 2. Access to all properties shall be maintained at all times except when work is occurring at the <br /> access point. Minimal delays will be allowed to provide access within the work zone area. <br /> Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br /> contractor shall be replaced with in-kind or better materials. <br /> 3. Residents and businesses shall be notified in writing, as approved by the County, 48-hours in <br /> advance of any impacts to their access. <br /> 4. Any areas where parking is to be restricted shall have signs noticing the time period placed at <br /> least 48 hours in advance of the work. <br /> 5. Existing fences shall not be removed without written consent signed by the property owner and <br /> submitted to the County prior to the removal. Fences removed shall be restored with in-kind or <br /> better materials at the edge of the right-of-way. <br /> 6. No trench cutting of County roads shall occur between November 1 and March 31. <br /> 7. Final paving for trench repair or road resurfacing shall be per Caltrans' specifications and shall <br /> not occur between November 1 and March 31. <br /> 8. All pavement markings destroyed or obliterated must be replaced in kind by the permittee. Typical <br /> pavement markings include, but not limited to, lane lines, centerlines, stop and stop ahead <br /> legends, limit lines, raised pavement markers and miscellaneous delineators. <br /> 9. The permittee is responsible for any Survey Monuments disturbed by this project and shall file a <br /> corner record to reestablish them using a Licensed Land Surveyor. <br /> 10. All pipe and pipeline related facilities including, but not limited to, valves, utility boxes and vaults, <br /> and frames and covers shall be maintained by AT&T. AT&T shall be responsible for any and all <br /> costs associated with the removal, relocation and/or adjustment of these facilities as determined <br /> by the County at AT&T's expense. (Streets and Highways Code 1463) <br /> 11. All future maintenance of the pipeline and related facilities within the County right-of-way will <br /> require a San Joaquin County Encroachment Permit. <br /> 12. Length of open, unbackfilled trench shall be limited to a total maximum length of 250 linear feet <br /> during working hours. <br /> 13. Trenches shall be maintained in a smooth and even condition to the satisfaction of the County <br /> throughout the project limits at all times. <br />