My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2022_PS-2203001 thru PS-2203500_ - PS-2203128
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2022
>
PS-2203001 thru PS-2203500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2022_PS-2203001 thru PS-2203500_ - PS-2203128
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2022 4:35:42 PM
Creation date
10/14/2022 4:33:02 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2203128
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2022
Notes2
NE Corner of Hammond St. & Cotton St.
Address
PO Box 930, Stockton,CA 95201
Application
Pacific Gas & Electric-Stockton
Type
Bell Hole
Supplemental fields
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Note 1 <br />Min 6" Pavement -0�i 6" fi" Min <br />TYp) (TYp) <br />\z See Note 2 Below ., \ <br />3 0" Compact in 12" max \ 3'-0" <br />\� layers to a min relative �\ <br />?compaction of 95% ? <br />\� under pavement and -------- Var <br />Var ? — ---_- y 90% outside pavement. y <br />*,\ - \ Compact in 24" max j p �i OD+12" <br />\� layers to a min relative \ O <br />OD/2 \ compaction of 85R. <br />\ tea\ a\tea\ aV Compact in 6" layers <br />to a min relative <br />compaction of 90%. <br />10" Min10" Min 10" Min 10" Min <br />+ 20" Min <br />NOTES: <br />1. New pavement shall be 1" thicker than existing pavement, minimum <br />of 0.25 Ft. New base shall be 1" thicker than existing base, min of 0.50 Ft. <br />2. Select native material or imported granular material as approved by the Director <br />of Public Works. Backfill with materials equal to or better than the existing <br />pavement and base in quality. <br />3. Relative compaction of materials shall be tested in accordance with <br />the State of California, Dept. of Transportation Testing Manuals, test <br />method No. California 216 or 231. <br />4. All existing pavement shall be neatly cut to line prior to trench excavation. <br />5. Jetting or ponding will be permitted within the street right-of-way with <br />a 3 year bond, when approved by the Director of Public Works. <br />6. When shown by soil composition and compactability, ninety percent (90%) <br />compaction may be used, when approved by the Director of Public Works. <br />7. Special bedding and backfill requirements may be shown on the plans or <br />specified in the special provisions. <br />^YYrv"w uy. <br />TYPICAL TRENCH BACKFILL r�a� <br />sen.un ]ixcHptkn 1 oer. <br />w COUNTY OF SAN 7OAQUlN <br />D�AR'IxIDMI OPPIIBIIC WOItK9 <br />Wotkiug FOI YOU Dote: DEC 201+ Std. Dwg. No. R-21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.