FIBER PLACEMENT NOTES:GENERAL NOTES: <br /> DISCLAIMER: <br />1.IT IS THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR TO VERIFY ALL RIGHT OF WAY BEFORE CONSTRUCTION IS TO <br />BEGIN. NO UNDERGROUND INSTALLATION REPRESENTED WITHIN THESE PLAN SHEETS IS PROPOSED OUTSIDE OF THE RIGHT <br />OF WAY. <br />2.THE UNDERGROUND ROUTE DEPICTED IS PRELIMINARY AND WILL/MAY VARY ONCE UTILITIES HAVE <br />BEEN FIELD LOCATED. <br />3.ANCHORING FOR THE AERIAL CONSTRUCTION IS TYPICALLY DETERMINED DURING CONSTRUCTION <br />AND IS COLLECTED IN THE AS-BUILT PHASE. <br />1.CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES 48 HOURS PRIOR TO CONSTRUCTION ACTIVITY <br />SEE LOCAL DIRECTORY FOR CONTACT TELEPHONE NUMBER OF LOCAL CALL BEFORE YOU DIG AGENCY. <br />2.CONTRACTOR SHALL RECORD SEQUENCE # OF FIBER CABLE AT EVERY WORK POLE, MANHOLE, FIBER STORAGE LOOP <br />AND TAIL LOCATION. CONTRACTOR TO PROVIDE PROJECT MANAGER WITH SEQUENCE NUMBERS AT PROJECT <br />COMPLETION. <br />3.SLACK LOOP AND SNOWSHOE STORAGE LOCATIONS SHALL BE DETERMINED ON CONSTRUCTION DRAWINGS, HOWEVER, <br />REEL LENGTHS OF FIVE HUNDRED FEET (500') OR LESS ON LARGE COUNT FIBER OR THREE HUNDRED FEET (300') OR LESS <br />ON SMALL COUNT FIBER ARE DIFFICULT TO USE AND SHOULD BE PLACED AS FSL'S, NOT CUT AND RETURNED. <br />4.FIBER OPTIC IDENTIFICATION TAGS SHALL BE PLACED AT EVERY WORK POLE, MANHOLE, FIBER, STORAGE LOOPS, SPLICE <br />CASES AND WHERE INDICATED BY PROJECT MANAGER. TAGS NEED TO BE PLACED SO AS TO BE READ FROM THE GROUND. <br />5.CABLE LUBRICATION SHALL BE USED TO REDUCE PULLING TENSION. LUBRICANTS MUST NOT CONTAIN ANY PETROLEUM <br />PRODUCTS. <br />6.A 100 FOOT FIBER COIL MUST REMAIN IN ALL VAULTS UNLESS OTHERWISE NOTED. <br />7.ALL BURIED INFRASTRUCTURE MUST BE ACCOMPANIED WITH WARNING TAPE AND A TRACER WIRE, AT RISER POLES THE <br />LOCATE WIRE SHALL BE ACCESSIBLE AT THE BASE OF THE RISER. <br />8.ALL RISERS WILL BE CAPPED AT ALL TIMES. <br />9.ALL FIBER SHALL BE MARKED AS TO DIRECTION IN EACH VAULT. RED-NORTH, GREEN-SOUTH,YELLOW-EAST, AND <br />BLUE-WEST. DO NOT TAPE FIBER CABLES TOGETHER IN RISER. <br />1. ALL VAULTS / HANDHOLES TO BE EQUIPPED WITH SECURITY LIDS WITH LOCKING BOLTS. <br />2. GROUND RESTORATION/RIGHT-OF-WAY SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION. <br />3. ALL 90 DEGREE BENDS IN CONDUIT CONSTRUCTION WILL BE A MINIMUM OF 36" RADIUS UNLESS <br />SPECIFIED OTHERWISE. <br />4. BURIED FIBER OPTIC WARNING SIGNS SHALL BE PLACED AT EACH SIDE OF ALL ROAD CROSSINGS, <br />AT CULVERTS, DITCHES AND IN A STRAIGHT LINE OF SIGHT SPACING OF APPROXIMATELY 500 FEET. <br />5. DEVIATIONS FROM THE ENGINEERED ROUTE REQUIRES A PROJECT MANAGER AND RIGHT-OF-WAY <br />OWNER OR CARETAKER APPROVAL PRIOR TO CONSTRUCTION. <br />6. WHERE PERMITS FROM STATE, COUNTY, CITY, RAILROAD OR GOVERNMENT AGENCIES ARE <br />REQUIRED, ALL WORK PERFORMED WILL COMPLY WITH THESE AGENCIES STANDARD <br />SPECIFICATIONS. <br />7. THE PROJECT MANAGER WILL NOTIFY BUILDING MANAGEMENT WHEN WORK WILL BEGIN ON <br />BUILDING. CONTRACTOR TO COORDINATE ROOM ACCESS AND WORK START AND STOP TIMES <br />WITH BUILDING MANAGEMENT. <br />8. THE PROJECT MANAGER IS TO BE NOTIFIED BY THE CONTRACTOR 24 HOURS PRIOR TO <br />CONSTRUCTION. SEE COMPANY CONTACT LIST FOR CONTACT NAME(s) AND TELEPHONE NUMBER(s). <br />9. THE PROJECT MANAGER WILL RESERVE THE RIGHT TO INSPECT AT ANY TIME THE WORK BEING <br />PERFORMED BY THE CONTRACTOR. IF PROJECT MANAGER DETERMINES THAT THE WORK IS NOT <br />BEING PERFORMED TO MINIMUM QUALITY STANDARDS, THEN THE CONTRACTOR SHALL PROVIDE <br />REWORK AT HIS OWN COST. <br />10. ANY CHANGE IN PROJECT SCOPE, INCLUDING BUT NOT LIMITED TO, CONDUIT LENGTH, CONDUIT <br />PATH, AERIAL PATH ETC., MUST BE APPROVED BY THE PROJECT MANAGER. <br />11. ALL CORING/CONSTRUCTION THAT WILL CAUSE NOISE AND/OR VIBRATION SHALL BE DONE WITHIN <br />ALLOWED (9AM-3PM) BUSINESS HOURS. <br />12. ANY AND ALL UNDERGROUND UTILITIES ENCOUNTERED ARE THE RESPONSIBILITY OF THE <br />CONTRACTOR TO LOCATE, PROTECT, AND REPAIR, IF DAMAGED. <br />13. ALL FOOTAGES ARE BASED ON FIELD GATHERED MEASUREMENTS, AS SUCH SOME VARIANCE <br />SHOULD BE ANTICIPATED. ADJUST AS NEEDED. <br />14. ALL BURIED CONDUIT/CABLE WILL BE PLACED AT 36" MINIMUM COVER. SITE HAS POTENTIAL FOR <br />ROCK THAT WOULD PREVENT THE ABILITY TO PROVIDE THE MINIMUM COVER. IN CASES WHERE THE <br />MINIMUM COVER CAN NOT BE ACHIEVED, THE CONDUIT SHALL BE PLACED IN A SCH 40 EMT SLEEVE <br />OR APPROVED EQUIVALENT. <br />15. WATER, SEWER, STORM SEWER AND EASEMENT LOCATIONS ARE BASED OFF OF CITY MAPS, <br />NOT FIELD VERIFIED. <br />16. BORING OF AC PAVING IS REQUIRED AT ALL LOCATIONS AS INDICATED ON PLANS. <br />17. AT NO TIME SHALL CURBS, GUTTERS OR HANDICAP BE DISTURBED. <br />18.DOOR HANGERS ARE TO BE PLACED A MINIMUM OF 72 HOURS PRIOR TO START OF CONSTRUCTION. <br />19. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL PLACE MESSAGE BOARDS STATING LANE <br />CLOSURES, AND DELAYS A WEEK IN ADVANCE. LOCATION OF THE MASSAGE BOARD SHALL BE <br />COORDINATED WITH THE CITY INSPECTOR AT THE PRE-CONSTRUCTION MEETING. <br />20. LANE CLOSURES CANNOT EXCEED MORE THAN 300 FT. AT A TIME. FOR SAFETY PURPOSES THERE <br />SHALL BE ONLY ONE CLOSURE AT A TIME ALONG INTERNATIONAL BLVD. MORE FLAGGERS WILL BE <br />NECESSARY TO HELP VEHICLES AND PEDESTRIANS IN THE WORK ZONES DURING THE LANE <br />CLOSURES. <br />ROADWAY CENTER LINE <br />EXISTING COMCAST ROUTE <br />EXISTING FENCELINE <br />PROPOSED TRENCH/BORE ROUTE <br />EXISTING WATER LINE <br />EXISTING STORM DRAIN <br />EXISTING SANITARY SEWER <br />EXISTING JOINT TRENCH <br />EXISTING IRRIGATION SYSTEM <br />EXISTING TV SYSTEM <br />EXISTING GAS SYSTEM <br />EXISTING ELECTRICAL SYSTEM <br />EXISTING TELEPHONE SYSTEM <br />PROPERTY LINE <br />LINETYPES <br />BORE PIT 4' X 4' <br />WATER MANHOLE <br />UNIDENTIFIED MANHOLE <br />GAS METER <br />WATER METER <br />ELECTRIC MANHOLE <br />SEWER CLEAN OUT <br />SANITARY SEWER MANHOLE <br />STORM DRAIN MANHOLE <br />CATCH BASIN <br />GAS/WATER VALVE <br />TREE/BUSHES <br />EXISTING POLE <br />EXISTING COMCAST PEDESTAL <br />NEW RISER ATTACHED TO POLE <br />EXISTING IRRIGATION VAULT <br />EXISTING COMCAST VAULT <br />EXISTING UTILITY VAULT/PEDESTAL <br />MONUMENT <br />FIRE HYDRANT <br />TRAFFIC SIGNAL COMBINATION <br />STREET LIGHT <br />TRANSFORMERNEW COMCAST LOW PROFILE <br />NEW COMCAST PEDESTAL <br />NEW COMCAST VAULT <br />POWER SUPPLY W/ METER <br />NEW COMCAST POWER SUPPLY <br />SYMBOLS <br />EXISTING WATER <br />EXISTING TELEPHONE <br />CONDUIT <br />MAXIMUM <br />CDT <br />MAX <br />W <br />T <br />RIGHT OF WAY <br />EXISTING SANITARY SEWER <br />EXISTING STORM DRAIN <br />PUBLIC UTILITY EASEMENT <br />PROPERTY LINE <br />MINIMUM <br />FACE OF CURB <br />EXISTING <br />CENTER LINE <br />COMCAST <br />L <br />MIN <br />FOC <br />(E) <br />COMCAST <br />C <br />ABBREVIATIONS <br />PUE <br />R/W <br />SS <br />SD <br />PL <br />TRANSFORMER PAD <br />RIGHT OF WAY <br />NEW AERIAL ROUTE <br /> CITY OF MODESTO STANDARD NOTES: <br />POTHOLE 2' X 2' <br />FIBER ROLL