My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - PROBLEM FILES 2008 EP'S_ - PS-0800710 (2)
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
PROBLEM FILES 2008 EP'S
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - PROBLEM FILES 2008 EP'S_ - PS-0800710 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:41:20 PM
Creation date
12/30/2015 8:31:57 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-0800710 (2)
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
PROBLEM FILES 2008 EP'S
Supplemental fields
Applicant
DAVID CASTRO
Contracts
CrossReference
Date Entered
3/4/2008
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
Primary Parcel
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
February 29, 2008 <br /> Scott Cooper <br /> County of San Joaquin, Public Works <br /> 1810 East Hazelton Ave., <br /> Stockton, CA. 95205 <br /> 209-468-3058 <br /> Dear Scott, <br /> I have included the San Joaquin County Public Works encroachment permit and a check <br /> for $1,115 dollars. <br /> Our subsurface investigation will be located at the following 3 locations; <br /> • Eight Mile Road/South Pacific Rail Road-Figure 2a and 2b <br /> -6 soil borings ranging in depths from 5ft to 70ft <br /> • Lower Sacramento Road/Pixley Slough-Figure 3 <br /> -2 soil borings ranging in depths from 50ft to 60ft <br /> • Lower Sacramento Road/Bear Creek-Figure 4 <br /> -2 soil borings ranging in depths from l Oft to 70ft <br /> See Figure 1 for the location of the 3 projects. Figures 2 through 4 show the actual <br /> locations of our borings. Soil borings will be drilled in the unpaved shoulder areas with <br /> traffic control shown in Figure 5. Our drilling is scheduled to begin on March 12" 2008. <br /> If you have any questions please do not hesitate to call me. Thanks for your help. <br /> Sincerely, <br /> BLACKBURN CONSULTING <br /> 1, <br /> David P. Castro <br /> Project Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.