My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - PROBLEM FILES 2008 EP'S_ - PS-0801235
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
PROBLEM FILES 2008 EP'S
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - PROBLEM FILES 2008 EP'S_ - PS-0801235
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:41:26 PM
Creation date
12/30/2015 8:38:34 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-0801235
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
PROBLEM FILES 2008 EP'S
Supplemental fields
Applicant
DINO & SON DITCHING
Contracts
CrossReference
Date Entered
4/14/2008
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
ACROSS BACON ISLAND RD. 1 MILE W/O HWY 4
Primary Parcel
Type (2)
PS-0801235
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Invoice- <br /> Invoice Date April 10-2008 <br /> 2408 E 71fi street.Stockton,Ca 9S20S <br /> -3120 Wok' <br /> office;(209)463 e:(209)986-2771 <br /> 'FaT.-(209 <br /> )941-2812 Mone:(209)943-6070 <br /> I.R. "S0n"9Wo6ifk(209)471-6070 <br /> TO INSTALL A 24"X %, X 120' METAL PIPE ACROSS BACON ISLAND ROAD <br /> PROCESS; <br /> USA- site area <br /> Place men working sign, East and West side, 2 flagmen on road site <br /> Saw cut asphalt to 40"wide <br /> Remove, and cut trench on one half of paved road,4 feet deep and place 12" inch appx <br /> Basi rock and pipe, back fill and compact to keep traffic flowing. <br /> Remove South end of the road place base rock 12"appx set metal Pipe collar weld, <br /> Section and back fill and compact to road levee <br /> Time frame is approximately 6 hours. <br /> Friday.April 18,2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.