My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - Water Service Water Pipeline_ - Special Conditions
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
Water Service Water Pipeline
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - Water Service Water Pipeline_ - Special Conditions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 11:36:44 AM
Creation date
12/30/2015 5:32:50 AM
Metadata
Fields
Template:
Permits_Development
DocName
Special Conditions
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
Water Service Water Pipeline
Supplemental fields
Applicant
Contracts
CrossReference
Description
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
Primary Parcel
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Special Conditions for <br /> California Water Service Water Pipeline -2- <br /> ENCROACHMENT PERMIT <br /> 13. All trenches shall be completely backfilled or shored and plated at the end of each workday, and <br /> the roadway restored to two-way traffic. If plating is to be used, a trench shoring and plating plan <br /> suitable for traffic loadings shall be prepared by a registered civil engineer and submitted for prior <br /> approval by the County. <br /> 14. Bore pits shall be shored at all times with shoring and bridging designed to handle appropriate <br /> vehicle loading (stamped and signed by a registered civil engineer). <br /> 15. The contractor shall use San Joaquin County Standard R-29 when backfilling trenches within the <br /> County right-of-way. Where the existing road structural section is below standard, a minimum <br /> section of 3 inches of asphalt concrete over 8 inches of aggregate base shall be required. <br /> 16. Temporary pavement shall be provided for all trench areas within three days of pavement <br /> removal or by Friday of each week, whichever is more restrictive. <br /> 17. Final trench paving shall be placed when the length of temporarily surfaced trench exceeds 1,500 <br /> linear feet or by segment of road as determined by the County. Final trench paving will also be <br /> required to be placed when interruptions or delays of the work exceed two (2) weeks. <br /> 18. Roadway areas subject to pavement cuts shall receive a seal coat for the entire half of the <br /> roadway containing the trench (i.e. from centerline to edge of pavement or lip of gutter), per Sec. <br /> 3900 Miscellaneous, Sub-sec. 3910 Trench Cutting Policy, sec. 3910.3(b)(1). <br /> 19. Contractor shall establish existing roadway and drainage grades within the construction area. <br /> Any repair to roadways and adjacent areas shall match existing grades. Any proposed grade <br /> changes shall receive prior approval from County. <br /> 20. School buses shall be passed through the work zone with minimal delay. <br /> 21. Children walking to/from school shall be escorted through the work zone at all times. <br /> 22. Coordination with Franklin High School shall be required to provide for school buses and parents <br /> during drop-off/pick-up periods. Ensure all parents/faculty are aware of lane closures. <br /> 23. A report describing a public information campaign to inform affected residents, schools and <br /> businesses shall be submitted to the County for approval prior to beginning work. <br /> 24. Concrete pavement shall be removed to existing joints and shall be replaced in kind. Concrete <br /> pavement mix design shall be approved by County prior to placement. <br /> 25. Above ground ARV boxes and other similar facilities will be allowed within the right-of-way if <br /> located as far to the outside edge as possible and if the location either meets AASHTO Clear <br /> Zone guidelines or is protected by an existing obstruction such as a tree or utility pole. <br /> 26. The Contractor shall coordinate with Caltrans on the signal at Fremont Street and Oro Avenue <br /> since loops will be disabled. <br />
The URL can be used to link to this page
Your browser does not support the video tag.