My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2022_PS-2203001 thru PS-2203500_ - PS-2203085
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2022
>
PS-2203001 thru PS-2203500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2022_PS-2203001 thru PS-2203500_ - PS-2203085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2022 4:15:17 PM
Creation date
11/14/2022 4:12:26 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2203085
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2022
Notes2
Country Club Blvd. W/O Pershing Ave. (Stockton City Limit Line)
Address
4719 Quail Lakes Drive, Ste. G PMB 337
Application
Wong Engineers, Inc.
Type
Traffic Control Devices
Supplemental fields
Cross Ref
PWP7110005
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PS-2203085 October 3, 2022 <br /> <br />SPECIAL CONDITIONS FOR <br />WONG ENGINEERS, INC. – COUNTRY CLUB BLVD. <br />ENCROACHMENT PERMIT <br /> <br />1. Maintain traffic controls for all roads. Traffic control delays shall not exceed 10 minutes. <br />Two-way traffic shall be maintained during non-working hours with excavated areas backfilled or <br />plated. During working hours, two-way traffic control shall be maintained with one lane open and <br />appropriate flaggers. <br /> <br />2. Access to all properties shall be maintained at all times except when work is occurring at the <br />access point. Minimal delays will be allowed to provide access within the work zone area. <br /> <br />3. Residents and businesses shall be notified in writing, as approved by the County, 48 hours in <br />advance of any impacts to their access. <br /> <br />4. Any areas where parking is to be restricted shall have signs noting the restrictions in place at <br />least 48 hours in advance. <br /> <br />5. School Buses shall be passed through the work zone with minimal delays. <br /> <br />6. County roads shall be kept clean from mud and debris at all times along the access points and <br />work zone areas during entire project. All standard roadway striping and signage shall be clearly <br />visible, maintained and restored throughout the construction zone during and after the project. <br /> <br />7. The contractor shall not conduct construction operations in rain or heavy fog conditions.
The URL can be used to link to this page
Your browser does not support the video tag.