My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits-2022_Driveway Permits_PS-2203001 thru PS-2203500_-PS-2203007
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2022
>
DRIVEWAY PERMITS
>
PS-2203001 thru PS-2203500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits-2022_Driveway Permits_PS-2203001 thru PS-2203500_-PS-2203007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2022 10:07:52 AM
Creation date
11/18/2022 10:06:10 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2203007
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2022
Notes2
22044 Henry Rd.
Address
22044 Henry Rd., Escalon,CA 95320-9635
Application
Hill, Brian S
Type
Driveway Encroachment
Supplemental fields
APN
24908006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />P.O. BOX 1810-1810 E. HAZELTON AVENUE Permit No: PS -2203007 <br />STOCKTON, CALIFORNIA 95201 Start Date: 09/28/2022 <br />(209) 468-3000 Exp. Date: 09/28/2023 <br />FAX 9 (209) 468-9324 <br />APN No: 24908006 <br />DRIVEWAY ENCROACHMENT PERMIT <br />To: HILL, BRIAN S <br />22044 HENRY RD <br />ESCALON CA 95320-9635 <br />Location: 22044 HENRY RD <br />in compliance with your request of 09/28/2022, and subject to all the terms, conditions and reshictions written below or printed as general or <br />special provisions on any part of this form. <br />Permission is hereby granted to construct One driveway w/o pipe shown on <br />Permit Application No. PS -2203007 Quad: SE <br />Jobsite shall be kept in a safe condition at al] times by removing daily any excess dirt or debris which might be a hazard to pedestrian and/or <br />vehicular traffic. Adequate lights, signs and barricades shall be placed and maintained by the Permittee for the protection of the public in <br />accordance with the current Caltrans Standard Specifications. <br />A(n) (SEE STAMP) SEE STAMP inside diameter per section 62 of the current Caltrans Standard Specifications, ALTERNATNE PIPE <br />AND PIPE ARCH CULVERTS, shall be installed in roadside drainage ditch for drainage flow maintenance and shall be of sufficient length to <br />clear toe of approach fill or headwalls. <br />The entire area of driveway approach(es), include flares for turning and /or paved frontage(s), from the edge of roadway pavement to <br />right -of --way (front property) l nes a e surfaced with a two nch (2') minimum of asphalt concrete over a (4 nch) Four inch minimum of <br />compacted layer of three-quarter inch (3/4") maximum size aggregate base material (road gravel) conforming to Class 2 Aggregate Base <br />specified in Section 26 of the current Caltrans Standard Specification, or with a four inch (4") minimum of Portland cement concrete. <br />If Portland cement concrete pavement is installed, expan <br />sion joints shall be provided at the edge of pavement and along property line. Surface <br />grades of approaches) and/or to open ends of pipe. No ponding or puddles on pavement surface shall be allowed. <br />Permittee shall call the Department of Public Works, Field Engineering Division (Permit Inspections) at (209) 953-7421 at least two <br />business days prior to beginning and completion of any work within the County right -of --way. After completion of the work <br />permitted herein, all debris, lumber, barricades or any excess material shall be removed and the jobsite left in a neat workmanlike <br />condition. <br />Driveways) shall be complete prior to occupancy of the residence, <br />but not to exceed expiration date. <br />Fritz Buchman, Director <br />Department of Public Works <br />No pipe is required under and ac:ass d: (.• <br />approach at this time. However, ii' in tic i etu <br />it is determined by the County that pipe n:!;:: By?I I <br />4 q All 'Pte ;,i:c. i- Permit section <br />FORMS: R-17, SS/WW need <br />County requirements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.