Laserfiche WebLink
1 2 3 4 I 5 I 6 I 7 8 9 I 10 <br />D <br />C <br />G G <br />— fo f <br />— P7 <br />— P6 <br />—rD <br />w <br />NSTALL EXISTING <br />PRIMARY CONDUCTOR <br />STORM DRAIN <br />WATER <br />TELEPHONE <br />SEWER LINE <br />GAS <br />FIBER OPTICS <br />PROPERTY LINE <br />INSTALL NEW OH 3-715A —12 KV <br />INSTALL NEW UG 3-1 100A — 12 KV IN NEW 6" <br />INSTALL NEW UG 3-1100A — 1 2KV IN EXISTING 6" <br />INSTALL 1-6" C❑NDUIT <br />VACANT C❑NDUIT (SECONDARY), 1-3" <br />VACANT C❑NDUIT (SERVICE), 1-3" <br />DESCRIPTION <br />0 SOLELY AWNED PALE <br />-----_- SOLELY OWNED ANCHOR <br />JOINTLY OWNED POLE <br />T <br />• <br />X <br />D <br />T <br />JOINTLY OWNED ANCHOR <br />OVERHEAD SWITCH <br />RISER <br />CUTOUT — FUSED AS SHOWN <br />1 PHASE <br />CAPACIT❑R <br />❑H TRANSFORMER <br />THREE—WAY THREE—WAY SWITCH <br />TRENCH BACKFILL <br />BACKFILL MATERIAL <br />AS REQUIRED <br />BY CITY <br />COVER C❑NDUITS <br />WITH SAND <br />2" SAND BEDDING <br />Underground Service Alert <br />Call: TOLL FREE <br />81 1 <br />TWO WORKING DAYS BEFORE YOU DIG <br />NO APPARENT PG&E GAS CONFLICTS FOR THIS PROJECT <br />GAS PLATS: Map# <br />�� v <br />�` SI AFETY <br />SAFM PLEDGE <br />ALWAYS PUT SAFETY FIRST. <br />LOOK FOR AND ACT TO <br />RESOLVE UNSAFE SITUATIONS. <br />HELP AND ENCOURAGE <br />OTHERS TO ACT SAFELY. <br />P J.E <br />REQUIRED PERMITS <br />M COUNTY El CITY <br />M TRAFFIC CONTROL <br />STANDARDS <br />DETA I L <br />DEPTHS PER <br />STANDARDS <br />C❑NDUIT C❑NFIGURATI❑NS <br />AS REQUIRED <br />NOTES: 06-30-21 <br />REFER TO ELECTRIC & GAS SERVICE REQUIREMENTS (GREEN BOOK) OR SEPARATE PG&E STANDARD <br />DRAWINGS. CONTACT YOUR PG&E REPRESENTATIVE FOR COPIES, OR ACCESS www.pge.com/greenbook <br />�,ONDUIT RENCHING, AND BACKFIL <br />1) ALL DIMENSIONS AND LOCATIONS ARE ESTIMATED, APPROXIMATE <br />2) MAINTAIN MAXIMUM PRACTICABLE HORIZONTAL CLEARANCE BETWEEN PG&E FACILITIES AND "WET" UTILITIES (WATER, <br />SEWER, STORM DRAIN, ETC.). THE MIN. ALLOWABLE SEPARATION BETWEEN PG&E FACILITIES AND ANY PARALLEL "WET" <br />UTILITY IS 3/FT. WITH A PRESENCE OF 1 /FT. OF UNDISTURBED EARTH OR THE INSTALLATION OF A SUITABLE BARRIER. <br />THIS MEASUREMENT IS BETWEEN THE OUTER EDGE OF THE PG&E FACILITY AND THE OUTER EDGE OF THE PARALLEL <br />"WET" FACILITY. IF 3/FT. CANNOT BE MAINTAINED, A FORMAL VARIANCE MUST BE OBTAINED FROM PG&E WORK WITH <br />THE PG&E INSPECTOR (REFERENCE PG&E UO STANDARD S5453). <br />3) BOX, PAD, AND CONDUIT SIZES AND LOCATIONS SHALL CONFORM TO THE PG&E ELECTRIC CONSTRUCTION DRAWING. <br />4) PROVIDE LONG CONDUIT SWEEPS WHERE INDICATED. <br />5) DO NOT EXCEED 300 DEGREES OF BENDS IN ANY CONDUIT RUN (INCLUDING FEED LOCATION). NOTE: SECONDARY <br />AND SERVICE RUNS OF 200 FEET OR LESS MAY HAVE UP TO 315 DEGREES OF BENDS (REFERENCE PG&E <br />DOCUMENT 038193). <br />6) MANUFACTURED BENDS ARE NOT TO BE CUT, SHORTENED, OR ALTERED IN ANY WAY <br />7) ALL CONDUITS SHALL BE PROVEN AND A POLYESTER PULLING TAPE INSTALLED. <br />8) MANUFACTURED BENDS ARE NOT TO BE CUT, SHORTENED, OR ALTERED IN ANY WAY. <br />9) IDENTIFY ENDS OF BURIED CONDUIT WITH AN ELECTRONIC MARKER AND A VERTICAL CONDUIT SCRAP INSTALLED <br />FROM RIGID CAP TO GROUND LEVEL. <br />10) CONDUITS ENTERING PRIMARY BOXES SHALL BE AT A RIGHT ANGLE TO THE WINDOW OR WALL. <br />11) STUB CONDUITS AT RISER POLES IN QUADRANTS AS SHOWN. AT IDENTIFIED POLE LOCATIONS, THE TRENCHING <br />AGENT IS TO EXCAVATE TO TRENCH DEPTH AND INSTALL A 30" DIAMETER CARDBOARD TUBE. THE RISER CONDUIT <br />BEND IS TO BE PLACED OUTSIDE AND ADJACENT TO THE TUBE AT THE POLE QUADRANT INDICATED. BACKFILL <br />AROUND AND INSIDE TUBE WITH CLEAN NATIVE FILL. <br />LANin RIGHTS Alvin FAQWENIT(�- <br />12) PG&E LAND DEPARTMENT WILL OBTAIN ANY EASEMENTS NEEDED FOR PG&E FACILITIES. <br />SAFFN ANI) \AinQk/nAoN(�HIP- <br />13) CALL 811 (UNDERGROUND SERVICE ALERT) 48 HOURS PRIOR TO EXCAVATION FOR UNDERGROUND UTILITY <br />LOCATION MARKING. <br />14) MATERIALS AND WORKMANSHIP SHALL BE FIRST QUALITY IN EVERY RESPECT, PLUMB AND TRUE, AND ACCORDING <br />TO THE SPECIFIC REQUIREMENTS OF THE DRAWINGS AND THE ABOVE APPLICABLE NOTES AND SPECIFICATIONS. <br />I I I <br />0 0 4 <br />oLO <br />SD <br />SD <br />SD — <br />0 <br />00r-0 <br />W <br />U <br />O <br />W <br />W <br />T <br />w <br />T <br />T <br />z <br />SWR— <br />SWR <br />SWR <br />E <br />N <br />M <br />N <br />p <br />_ <br />W <br />D <br />C <br />G G <br />— fo f <br />— P7 <br />— P6 <br />—rD <br />w <br />NSTALL EXISTING <br />PRIMARY CONDUCTOR <br />STORM DRAIN <br />WATER <br />TELEPHONE <br />SEWER LINE <br />GAS <br />FIBER OPTICS <br />PROPERTY LINE <br />INSTALL NEW OH 3-715A —12 KV <br />INSTALL NEW UG 3-1 100A — 12 KV IN NEW 6" <br />INSTALL NEW UG 3-1100A — 1 2KV IN EXISTING 6" <br />INSTALL 1-6" C❑NDUIT <br />VACANT C❑NDUIT (SECONDARY), 1-3" <br />VACANT C❑NDUIT (SERVICE), 1-3" <br />DESCRIPTION <br />0 SOLELY AWNED PALE <br />-----_- SOLELY OWNED ANCHOR <br />JOINTLY OWNED POLE <br />T <br />• <br />X <br />D <br />T <br />JOINTLY OWNED ANCHOR <br />OVERHEAD SWITCH <br />RISER <br />CUTOUT — FUSED AS SHOWN <br />1 PHASE <br />CAPACIT❑R <br />❑H TRANSFORMER <br />THREE—WAY THREE—WAY SWITCH <br />TRENCH BACKFILL <br />BACKFILL MATERIAL <br />AS REQUIRED <br />BY CITY <br />COVER C❑NDUITS <br />WITH SAND <br />2" SAND BEDDING <br />Underground Service Alert <br />Call: TOLL FREE <br />81 1 <br />TWO WORKING DAYS BEFORE YOU DIG <br />NO APPARENT PG&E GAS CONFLICTS FOR THIS PROJECT <br />GAS PLATS: Map# <br />�� v <br />�` SI AFETY <br />SAFM PLEDGE <br />ALWAYS PUT SAFETY FIRST. <br />LOOK FOR AND ACT TO <br />RESOLVE UNSAFE SITUATIONS. <br />HELP AND ENCOURAGE <br />OTHERS TO ACT SAFELY. <br />P J.E <br />REQUIRED PERMITS <br />M COUNTY El CITY <br />M TRAFFIC CONTROL <br />STANDARDS <br />DETA I L <br />DEPTHS PER <br />STANDARDS <br />C❑NDUIT C❑NFIGURATI❑NS <br />AS REQUIRED <br />NOTES: 06-30-21 <br />REFER TO ELECTRIC & GAS SERVICE REQUIREMENTS (GREEN BOOK) OR SEPARATE PG&E STANDARD <br />DRAWINGS. CONTACT YOUR PG&E REPRESENTATIVE FOR COPIES, OR ACCESS www.pge.com/greenbook <br />�,ONDUIT RENCHING, AND BACKFIL <br />1) ALL DIMENSIONS AND LOCATIONS ARE ESTIMATED, APPROXIMATE <br />2) MAINTAIN MAXIMUM PRACTICABLE HORIZONTAL CLEARANCE BETWEEN PG&E FACILITIES AND "WET" UTILITIES (WATER, <br />SEWER, STORM DRAIN, ETC.). THE MIN. ALLOWABLE SEPARATION BETWEEN PG&E FACILITIES AND ANY PARALLEL "WET" <br />UTILITY IS 3/FT. WITH A PRESENCE OF 1 /FT. OF UNDISTURBED EARTH OR THE INSTALLATION OF A SUITABLE BARRIER. <br />THIS MEASUREMENT IS BETWEEN THE OUTER EDGE OF THE PG&E FACILITY AND THE OUTER EDGE OF THE PARALLEL <br />"WET" FACILITY. IF 3/FT. CANNOT BE MAINTAINED, A FORMAL VARIANCE MUST BE OBTAINED FROM PG&E WORK WITH <br />THE PG&E INSPECTOR (REFERENCE PG&E UO STANDARD S5453). <br />3) BOX, PAD, AND CONDUIT SIZES AND LOCATIONS SHALL CONFORM TO THE PG&E ELECTRIC CONSTRUCTION DRAWING. <br />4) PROVIDE LONG CONDUIT SWEEPS WHERE INDICATED. <br />5) DO NOT EXCEED 300 DEGREES OF BENDS IN ANY CONDUIT RUN (INCLUDING FEED LOCATION). NOTE: SECONDARY <br />AND SERVICE RUNS OF 200 FEET OR LESS MAY HAVE UP TO 315 DEGREES OF BENDS (REFERENCE PG&E <br />DOCUMENT 038193). <br />6) MANUFACTURED BENDS ARE NOT TO BE CUT, SHORTENED, OR ALTERED IN ANY WAY <br />7) ALL CONDUITS SHALL BE PROVEN AND A POLYESTER PULLING TAPE INSTALLED. <br />8) MANUFACTURED BENDS ARE NOT TO BE CUT, SHORTENED, OR ALTERED IN ANY WAY. <br />9) IDENTIFY ENDS OF BURIED CONDUIT WITH AN ELECTRONIC MARKER AND A VERTICAL CONDUIT SCRAP INSTALLED <br />FROM RIGID CAP TO GROUND LEVEL. <br />10) CONDUITS ENTERING PRIMARY BOXES SHALL BE AT A RIGHT ANGLE TO THE WINDOW OR WALL. <br />11) STUB CONDUITS AT RISER POLES IN QUADRANTS AS SHOWN. AT IDENTIFIED POLE LOCATIONS, THE TRENCHING <br />AGENT IS TO EXCAVATE TO TRENCH DEPTH AND INSTALL A 30" DIAMETER CARDBOARD TUBE. THE RISER CONDUIT <br />BEND IS TO BE PLACED OUTSIDE AND ADJACENT TO THE TUBE AT THE POLE QUADRANT INDICATED. BACKFILL <br />AROUND AND INSIDE TUBE WITH CLEAN NATIVE FILL. <br />LANin RIGHTS Alvin FAQWENIT(�- <br />12) PG&E LAND DEPARTMENT WILL OBTAIN ANY EASEMENTS NEEDED FOR PG&E FACILITIES. <br />SAFFN ANI) \AinQk/nAoN(�HIP- <br />13) CALL 811 (UNDERGROUND SERVICE ALERT) 48 HOURS PRIOR TO EXCAVATION FOR UNDERGROUND UTILITY <br />LOCATION MARKING. <br />14) MATERIALS AND WORKMANSHIP SHALL BE FIRST QUALITY IN EVERY RESPECT, PLUMB AND TRUE, AND ACCORDING <br />TO THE SPECIFIC REQUIREMENTS OF THE DRAWINGS AND THE ABOVE APPLICABLE NOTES AND SPECIFICATIONS. <br />I I I <br />0 0 4 <br />oLO <br />- <br />o <br />n <br />0 <br />00r-0 <br />Q <br />Cn <br />U <br />O <br />O <br />0 <br />w <br />w <br />z <br />N <br />N <br />00 <br />C0 <br />n <br />N <br />N <br />M <br />N <br />p <br />_ <br />W <br />IMO <br />CMO <br />Q <br />O <br />W <br />O <br />N <br />N <br />N <br />m <br />N <br />N <br />Z <br />� <br />Z <br />O <br />0 <br />W <br />0 <br />LL <br />Q <br />H <br />O <br />W <br />N <br />Quo <br />U <br />U <br />Ld <br />w <br />� <br />oV) <br />C <br />Q <br />LLI <br />�z <br />w <br />W <br />Y <br />Z>_ <br />I� <br />W <br />O p <br />N <br />O <br />CD <br />ofz <br />C) C) <br />`r <br />o <br />00 <br />000 <br />C <br />wo <br />0 <br />Z <br />Lo <br />t d <br />W <br />O <br />=ZQ <br />U <br />Of <br />O <br />a <br />L0 <br />m <br />p <br />O <br />W13- <br />O <br />U <br />W <br />Q <br />w= <br />EL Z <br />w <br />d <br />Z <br />0 0 <br />U <br />— N <br />>o <br />W <br />O_ <br />0 <br />J <br />W <br />Q <br />Cn <br />U <br />O <br />`Z W <br />0 <br />w <br />w <br />z <br />o <br />I- <br />ON <br />N <br />LLJJ <br />W <br />z <br />Q <br />O <br />W <br />Z <br />Q <br />Uo <br />m <br />N <br />Z <br />� <br />Z <br />U <br />0 <br />W <br />0 <br />LL <br />V <br />p <br />m <br />Quo <br />U <br />U <br />Ld <br />w <br />Z <br />oV) <br />C <br />Q <br />LLI <br />�z <br />— <br />-DZ <br />I� <br />C--� <br />O p <br />U <br />C) C) <br />::3 <br />w <br />C <br />wo <br />0 <br />Z <br />W <br />t d <br />U <br />CD <br />O <br />O <br />3 <br />a <br />wo <br />m <br />Z <br />CC <br />0 <br />C <br />J <br />Q <br />i <br />mN <br />Z <br />0 0 <br />U <br />— N <br />>o <br />W <br />O_ <br />0 <br />W <br />w <br />w <br />o <br />I- <br />LLJJ <br />W <br />z <br />L <br />_ <br />LiJ <br />Q <br />Uo <br />m <br />N <br />Z <br />M <br />w <br />LL <br />V <br />p <br />m <br />Q <br />U <br />U <br />Ld <br />w <br />Z <br />oV) <br />Q <br />LLI <br />O <br />— <br />w <br />N <br />O <br />V) <br />C) C) <br />Cl:f <br />Z <br />W <br />� <br />O <br />O <br />O <br />0000 <br />O <br />z <br />m <br />Z <br />0 <br />J <br />Q <br />mN <br />um <br />W <br />Z <br />N <br />W <br />O <br />W <br />0� <br />JLLJ <br />Q <br />Z <br />J <br />O <br />m <br />U <br />Z <br />a <br />z <br />V)U <br />C� <br />Q <br />0 <br />�LLI <br />U <br />Z <br />O <br />v <br />< <br />E <br />w -M <br />L¢ <br />W <br />N <br />m <br />N <br />0 <br />U <br />W <br />CL <br />_j <br />Z <br />0 0 <br />U <br />— N <br />>o <br />W <br />O_ <br />3 2 1 INCH 0 <br />0 <br />w <br />w <br />o <br />I- <br />LLJJ <br />W <br />z <br />L <br />_ <br />LiJ <br />3:: <br />Uo <br />CD <br />U <br />I <br />U <br />U <br />Ld <br />w <br />oV) <br />Q <br />C/) <br />— <br />w <br />LiJ <br />V) <br />C) C) <br />Cl:f <br />w� <br />z <br />0 <br />J <br />Q <br />3 2 1 INCH 0 <br />