Laserfiche WebLink
PG&E CONSTRUCTION NOTESLOC 1:REMOVE 341' 2-4AR, D.G. AND ANCHOR.INSTALL D.E. INSULATOR, 341' 3-2AR, 2-7/32" D.G.'SAND 15M ANCHOR.LOC 2:REMOVE BRACKETS AND 315' 2-4AR.INSTALL 8' COMPOSITE CROSSARM, INSULATORS ND315' 3-2AR.LOC 3:TOP POLE. REMOVE BRACKETS AND 320' 2-4AR.INSTALL 50'- CL 2 POLE, 8' COMPOSITE CROSSARM,INSULATORS AND 320' 3-2AR.LOC 4:TOP POLE. REMOVE STEEL CROSSARM, INSULATORS,15KVA OH TX, 5/16" D.G. AND ANCHOR.INSTALL 50- CL 1 POLE, 8' COMPOSITE CROSSARM,INSULATORS, 15KVA 1Ø & 45KVA 3Ø OH TX'S, C/O'S, 70'1/0A QPX OH SVC WIRE, 2-3/8" D.G.'S AND 15MANCHOR.TRANSFER 1 OH SVC.APPLICANT NOTESLOC 4:INSTALL MINIMUM 30' CUSTOMER POLE, PER DWG025055.12357 BETHANY RD100A MAIN277/480V, 3Ø, 4WEST. LD: 50 KVAVD: 3.02VSCI: 14,000A