LINETYPES
<br />env
<br />T —
<br />e 9—
<br />CATV
<br />— CAN
<br />CATV
<br />G
<br />CATV
<br />gat
<br />COMCAST
<br />sat
<br />9Nt
<br />rT
<br />CENTER UNE
<br />rT
<br />rT
<br />SS
<br />EXISTING
<br />ss
<br />SE
<br />90
<br />FACE OFCURB
<br />90
<br />9[
<br />W
<br />MINIMUM
<br />w
<br />W—
<br />MAX
<br />MAXIMUM
<br />T
<br />EXISTING TELEPHONE
<br />x
<br />CONDUIT
<br />x
<br />x—
<br />BOW
<br />C/c
<br />E
<br />C/c
<br />ADDPPX/I DTNINIC
<br />COMCAST
<br />COMCAST
<br />PL
<br />PROPERTY LINE
<br />C/L
<br />CENTER UNE
<br />PUE
<br />PUBLIC UTILITY EASEMENT
<br />(EXIST.)
<br />EXISTING
<br />ROW
<br />RIGHT OFWAY
<br />FOC
<br />FACE OFCURB
<br />SD
<br />EXISTING STORM DRAIN
<br />MIN
<br />MINIMUM
<br />SS
<br />EXISTING SANITARY SEWER
<br />MAX
<br />MAXIMUM
<br />T
<br />EXISTING TELEPHONE
<br />CDT
<br />CONDUIT
<br />W
<br />EXISTING WATER
<br />BOW
<br />BACK OF WALK
<br />E
<br />EXISTING ELECTRIC
<br />DOW
<br />FRONT OF WALK
<br />IRR
<br />EXISTING IRRIGATION
<br />EOP
<br />EDGE OF PAVEMENT
<br />G
<br />EXISTING GAS
<br />FIBER PLACEMENT NOTES
<br />1. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES 46 HOURS
<br />PRIOR TO CONSTRUCTION ACTIVITY SEE LOCAL DIRECTORY FOR CONTACT
<br />TELEPHONE NUMBER OF LOCAL CALL BEFORE YOU DIG AGENCY.
<br />2. CONTRACTOR SHALL RECORD SEQUENCE # OF FIBER CABLE AT EVERY
<br />WORK POLE, MANHOLE, FIBRE STORAGE LOOP AND TAIL LOCATION.
<br />CONTRACTOR TO PROVIDE PROJECT MANAGER WITH SEQUENCE
<br />NUMBERS AT PROJECT COMPLETION.
<br />3. SLACK LOOP AND SNOWSHOE STORAGE LOCATIONS SHALL BE
<br />DETERMINED ON CONSTRUCTION DRAWINGS, HOWEVER, REEL LENGTHS
<br />OF FIVE HUNDRED FEET (500') OR LESS ON LARGE COUNT FIBER OR THREE
<br />HUNDRED (300') OR LESS ON SMALL COUNT FIBER ARE DIFFICULTTO USE
<br />AND SHOULD BE PLACED AS FSL'S, NOT CUTAND RETURNED.
<br />4. FIBER OPTIC IDENTIFICATION TAGS SHALL BE PLACED AT EVERY WORK
<br />POLE, MANHOLE, FIBER, STORAGE LOOPS, SPLICE CASES AND WHERE
<br />INDICATED BY PROJECT MANAGER. TAGS NEED TO BE PLACED SO AS TO BE
<br />READ FROM THE GROUND.
<br />5. CABLE LUBRICATION SHALL BE USED TO REDUCE PULLING TENSION.
<br />LUBRICANTS MUST NOT CONTAIN ANY PETROLEUM PRODUCTS.
<br />6. A 100 FOOT FIBER COIL MUST REMAIN IN ALL VAULTS UNLESS
<br />OTHERWISE NOTED.
<br />7. ALL BURIED INFRASTRUCTURE MUST BE ACCOMPANIED WITH
<br />WARNING TAPE ANDA TRACER WIRE, AT RISER POLES THE LOCATE WIRE
<br />SHALL BE ACCESSIBLE ATTHE BASE OF THE RISER.
<br />S. ALL RISERS WILL BE CAPPED AT ALL TIMES.
<br />9. ALL FIBER SHALL BE MARKED AS TO DIRECTION IN EACH VAULT.
<br />RED -NORTH, GREEN -SOUTH, YELLOW -EAST, AND BLUE -WEST, DO NOT
<br />TAPE FIBER CABLES TOGETHER IN RISER.
<br />DISCLAIMER
<br />13. ALL FOOTAGES ARE BASED ON FIELD GATHERED MEASUREMENTS, AS SUCH SOME VARIANCE
<br />SYMBOLS
<br />GENERAL NOTES:
<br />PROPOSED BORE ROUTE
<br />®
<br />NEW COMCAST POWER SUPPLY
<br />0
<br />TRANSFORMER
<br />ROCK THAT WOULD PREVENT THE ABILITY TO PROVIDE THE MINIMUM COVER. IN CASES WHERE
<br />NEW COMCAST LOW PROFILE
<br />1,
<br />ALL VAULTS/ HAN DHOLES TO BE EQUIPPED WITH SECURITY LIDS WITH LOCKING BOLTS.
<br />PROPOSED
<br />PROPOSED TRENCH/ R/SW ROUTE
<br />POWER SUPPLY W/ METER
<br />^t^
<br />STREET LIGHT
<br />2.
<br />GROU NO RESTORATION/RIGHT-OF-WAY SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION
<br />EXISTING COMCAST ROUTE
<br />TRAFFIC SIGNAL COMBINATION
<br />NEW COMCAST VAULT
<br />3.
<br />ALL 90 DEGREE BENDS IN CONDUIT CONSTRUCTION WILL BE A MINIMUM OF 36" RADIUS UNLESS
<br />m
<br />NEW COMCAST PEDESTAL
<br />SPECIFIED OTHERWISE.
<br />FIRE HYDRANT
<br />®
<br />BORE PIT
<br />EXISTING GAS SYSTEM
<br />MONUMENT
<br />BURIED FIBER OPTIC WARNING SIGNS SHALL BE PLACED AT EACH SIDE OF ALL ROAD CROSSINGS
<br />®
<br />CATCH BASIN
<br />EXISTING TV SYSTEM
<br />NEW RISER ATTACHED TO POLE
<br />EXISTING IRRIGATION SYSTEM
<br />®
<br />EXISTING POLE
<br />SD
<br />STORM DRAIN MANHOLE
<br />OWNER OR CARETAKER APPROVAL PRIOR TO CONSTRUCTION.
<br />EXISTING COMCASTVAULT
<br />WATER MANHOLE
<br />®
<br />EXISTING COMCAST PEDESTAL
<br />SS
<br />SANITARVSEWER MANHOLE
<br />EXISTING IRRIGATION VAULT
<br />®
<br />SEWER CLEAN OUT
<br />�®
<br />EXISTING UTILITY VAULT/PEDESTAL
<br />EXISTING FENCELINE
<br />7.
<br />THE PROJECT MANAGER WILL NOTIFY BUILDING MANAGEMENT WHEN WORK WILL BEGIN ON
<br />ELECTRIC MANHOLE
<br />©®
<br />GAS/WATERVALVE
<br />WITH BUILDING MANAGEMENT.
<br />TREE/BUSHES
<br />UNIDENTIFIED MANHOLE
<br />ROW LINE
<br />B.
<br />❑W
<br />WATER METER
<br />PH
<br />POTHOLE
<br />h
<br />STREET SIGN
<br />©
<br />GAS METER
<br />FIBER PLACEMENT NOTES
<br />1. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES 46 HOURS
<br />PRIOR TO CONSTRUCTION ACTIVITY SEE LOCAL DIRECTORY FOR CONTACT
<br />TELEPHONE NUMBER OF LOCAL CALL BEFORE YOU DIG AGENCY.
<br />2. CONTRACTOR SHALL RECORD SEQUENCE # OF FIBER CABLE AT EVERY
<br />WORK POLE, MANHOLE, FIBRE STORAGE LOOP AND TAIL LOCATION.
<br />CONTRACTOR TO PROVIDE PROJECT MANAGER WITH SEQUENCE
<br />NUMBERS AT PROJECT COMPLETION.
<br />3. SLACK LOOP AND SNOWSHOE STORAGE LOCATIONS SHALL BE
<br />DETERMINED ON CONSTRUCTION DRAWINGS, HOWEVER, REEL LENGTHS
<br />OF FIVE HUNDRED FEET (500') OR LESS ON LARGE COUNT FIBER OR THREE
<br />HUNDRED (300') OR LESS ON SMALL COUNT FIBER ARE DIFFICULTTO USE
<br />AND SHOULD BE PLACED AS FSL'S, NOT CUTAND RETURNED.
<br />4. FIBER OPTIC IDENTIFICATION TAGS SHALL BE PLACED AT EVERY WORK
<br />POLE, MANHOLE, FIBER, STORAGE LOOPS, SPLICE CASES AND WHERE
<br />INDICATED BY PROJECT MANAGER. TAGS NEED TO BE PLACED SO AS TO BE
<br />READ FROM THE GROUND.
<br />5. CABLE LUBRICATION SHALL BE USED TO REDUCE PULLING TENSION.
<br />LUBRICANTS MUST NOT CONTAIN ANY PETROLEUM PRODUCTS.
<br />6. A 100 FOOT FIBER COIL MUST REMAIN IN ALL VAULTS UNLESS
<br />OTHERWISE NOTED.
<br />7. ALL BURIED INFRASTRUCTURE MUST BE ACCOMPANIED WITH
<br />WARNING TAPE ANDA TRACER WIRE, AT RISER POLES THE LOCATE WIRE
<br />SHALL BE ACCESSIBLE ATTHE BASE OF THE RISER.
<br />S. ALL RISERS WILL BE CAPPED AT ALL TIMES.
<br />9. ALL FIBER SHALL BE MARKED AS TO DIRECTION IN EACH VAULT.
<br />RED -NORTH, GREEN -SOUTH, YELLOW -EAST, AND BLUE -WEST, DO NOT
<br />TAPE FIBER CABLES TOGETHER IN RISER.
<br />DISCLAIMER
<br />13. ALL FOOTAGES ARE BASED ON FIELD GATHERED MEASUREMENTS, AS SUCH SOME VARIANCE
<br />GENERAL NOTES:
<br />PROPOSED BORE ROUTE
<br />THIS IS AN COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIAL
<br />VERIFY ALL RIGHT OF WAY BEFORE CONSTRUCTION IS TO BEGIN. NO
<br />NEW AERIAL STRAND
<br />UNDERGROUND INSTALLATION REPRESENTED WITHIN THESE PLAN
<br />ROCK THAT WOULD PREVENT THE ABILITY TO PROVIDE THE MINIMUM COVER. IN CASES WHERE
<br />SHEETS IS PROPOSED OUTSIDE OF THE RIGHT OF WAY.
<br />1,
<br />ALL VAULTS/ HAN DHOLES TO BE EQUIPPED WITH SECURITY LIDS WITH LOCKING BOLTS.
<br />PROPOSED
<br />PROPOSED TRENCH/ R/SW ROUTE
<br />2. THE UNDERGROUND ROUTE DEPICTED IS PRELIMINARY AND WILL/MAY
<br />NEW AERIAL ROUTE
<br />2.
<br />GROU NO RESTORATION/RIGHT-OF-WAY SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION
<br />EXISTING COMCAST ROUTE
<br />APPROVED:
<br />3.
<br />ALL 90 DEGREE BENDS IN CONDUIT CONSTRUCTION WILL BE A MINIMUM OF 36" RADIUS UNLESS
<br />EXISTING TELEPHONE SYSTEM
<br />SPECIFIED OTHERWISE.
<br />EXISTING ELECTRICAL SYSTEM
<br />EXISTING GAS SYSTEM
<br />4.
<br />BURIED FIBER OPTIC WARNING SIGNS SHALL BE PLACED AT EACH SIDE OF ALL ROAD CROSSINGS
<br />AT CULVERTS, DITCHES AND IN A STRAIGHT LINE OF SIGHT SPACING OF APPROXIMATELY 500 FEET
<br />EXISTING TV SYSTEM
<br />EXISTING IRRIGATION SYSTEM
<br />5.
<br />DEVIATIONS FROM THE ENGINEERED ROUTE REQUIRES A PROJECT MANAGER AND RIGHT-OF-WAY
<br />OWNER OR CARETAKER APPROVAL PRIOR TO CONSTRUCTION.
<br />EXISTING JOINTTRENCH
<br />EXISTING SANITARY SEWER
<br />6.
<br />WHERE PERMITS FROM STATE, COUNTY, CITY, RAILROAD OR GOVERNMENT AGENCIES ARE
<br />EXISTING STORM DRAIN
<br />REQUIRED, ALL WORK PERFORMED WILL COMPLY WITH THESE AGENCIES STANDARD
<br />SPECIFICATIONS.
<br />EXISTING WATER LINE
<br />EXISTING FENCELINE
<br />7.
<br />THE PROJECT MANAGER WILL NOTIFY BUILDING MANAGEMENT WHEN WORK WILL BEGIN ON
<br />ROADWAVCENTER LINE
<br />BUILDING. CONTRACTOR TO COORDINATE ROOM ACCESSAND WORK STARTAND STOP TIMES
<br />WITH BUILDING MANAGEMENT.
<br />PROPERTY LINE
<br />ROW LINE
<br />B.
<br />THE PROJECT MANAGER IS TO BE NOTIFIED BY THE CONTRACTOR 24 HOURS PRIOR TO
<br />EASEMENT LINE
<br />CONSTRUCTION. SEE COMPANY CONTACT LIST FOR CONTACT NAME(s) AND TELEPHONE
<br />NUMBER(s).
<br />EOP/FOC/S/W
<br />9.
<br />THE PROJECT MANAGER WILL RESERVE THE RIGHT TO INSPECT AT ANY TIME THE WORK BEING
<br />PERFORMED BY THE CONTRACTOR. IF PROJECT MANAGER DETERMINES THAT THE WORK IS NOT
<br />BEING PERFORMED TO MINIMUM QUALITY STANDARDS, THEN THE CONTRACTOR SHALL PROVIDE
<br />REWORK AT HIS OWN COST.
<br />10.
<br />ANY CHANGE IN PROJECT SCOPE, INCLUDING BUT NOT LIMITED TO, CONDUIT LENGTH, CONDUIT
<br />PATH, AERIAL PATH ETC., MUST BE APPROVED BY THE PROJECT MANAGER.
<br />11.
<br />ALL CORING/CONSTRUCTION THAT WILL CAUSE NOISE AND/OR VIBRATION SHALL BE DONE WITHIN
<br />ALLOWED (9AM-3PM) BUSINESS H0URS.
<br />12.
<br />ANY AND ALL UNDERGROUND UTILITIES ENCOUNTERED ARE THE RESPONSIBILITY OF THE
<br />CONTRACTOR TO LOCATE, PROTECT, AND REPAIR, IF DAMAGED.
<br />FIBER PLACEMENT NOTES
<br />1. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES 46 HOURS
<br />PRIOR TO CONSTRUCTION ACTIVITY SEE LOCAL DIRECTORY FOR CONTACT
<br />TELEPHONE NUMBER OF LOCAL CALL BEFORE YOU DIG AGENCY.
<br />2. CONTRACTOR SHALL RECORD SEQUENCE # OF FIBER CABLE AT EVERY
<br />WORK POLE, MANHOLE, FIBRE STORAGE LOOP AND TAIL LOCATION.
<br />CONTRACTOR TO PROVIDE PROJECT MANAGER WITH SEQUENCE
<br />NUMBERS AT PROJECT COMPLETION.
<br />3. SLACK LOOP AND SNOWSHOE STORAGE LOCATIONS SHALL BE
<br />DETERMINED ON CONSTRUCTION DRAWINGS, HOWEVER, REEL LENGTHS
<br />OF FIVE HUNDRED FEET (500') OR LESS ON LARGE COUNT FIBER OR THREE
<br />HUNDRED (300') OR LESS ON SMALL COUNT FIBER ARE DIFFICULTTO USE
<br />AND SHOULD BE PLACED AS FSL'S, NOT CUTAND RETURNED.
<br />4. FIBER OPTIC IDENTIFICATION TAGS SHALL BE PLACED AT EVERY WORK
<br />POLE, MANHOLE, FIBER, STORAGE LOOPS, SPLICE CASES AND WHERE
<br />INDICATED BY PROJECT MANAGER. TAGS NEED TO BE PLACED SO AS TO BE
<br />READ FROM THE GROUND.
<br />5. CABLE LUBRICATION SHALL BE USED TO REDUCE PULLING TENSION.
<br />LUBRICANTS MUST NOT CONTAIN ANY PETROLEUM PRODUCTS.
<br />6. A 100 FOOT FIBER COIL MUST REMAIN IN ALL VAULTS UNLESS
<br />OTHERWISE NOTED.
<br />7. ALL BURIED INFRASTRUCTURE MUST BE ACCOMPANIED WITH
<br />WARNING TAPE ANDA TRACER WIRE, AT RISER POLES THE LOCATE WIRE
<br />SHALL BE ACCESSIBLE ATTHE BASE OF THE RISER.
<br />S. ALL RISERS WILL BE CAPPED AT ALL TIMES.
<br />9. ALL FIBER SHALL BE MARKED AS TO DIRECTION IN EACH VAULT.
<br />RED -NORTH, GREEN -SOUTH, YELLOW -EAST, AND BLUE -WEST, DO NOT
<br />TAPE FIBER CABLES TOGETHER IN RISER.
<br />DISCLAIMER
<br />13. ALL FOOTAGES ARE BASED ON FIELD GATHERED MEASUREMENTS, AS SUCH SOME VARIANCE
<br />SHOULD BE ANTICIPATED. ADJUSTAS NEEDED.
<br />1. IT IS THE RESPONSIBILITY OF THE CONSTRUCTION CONSTRUCTOR TO
<br />THIS IS AN COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIAL
<br />VERIFY ALL RIGHT OF WAY BEFORE CONSTRUCTION IS TO BEGIN. NO
<br />14. ALL BURIED CONDUIT/CABLE WILL BE PLACED AT 36" MINIMUM COVER. SITE HAS POTENTIAL FOR
<br />UNDERGROUND INSTALLATION REPRESENTED WITHIN THESE PLAN
<br />ROCK THAT WOULD PREVENT THE ABILITY TO PROVIDE THE MINIMUM COVER. IN CASES WHERE
<br />SHEETS IS PROPOSED OUTSIDE OF THE RIGHT OF WAY.
<br />THE MINIMUM COVER CANNOT BE ACHIEVED, THE CONDUIT SHALL BE PLACED INA SCH 40 EMT SLEEVE
<br />YYY
<br />1945 W A 92BBB Ave., Suite 300,
<br />ora qe, CA 92868
<br />(949) 250-0004 / FAX (949) 250-0006
<br />OR APPROVED EQUIVALENT.
<br />2. THE UNDERGROUND ROUTE DEPICTED IS PRELIMINARY AND WILL/MAY
<br />VARY ONCE UTILITIES HAVE BEEN FIELD LOCATED.
<br />15. WATER,SEWER, STORM SEWER AND EASEMENT LOCATIONS ARE BASED OFF OF CITY MAPS,
<br />NOT FIELD VERIFIED.
<br />16. BORING OF AC PAVING IS REQUIRED ATALL LOCATIONS AS INDICATED ON PLANS.
<br />17. AT NO TIME SHALL CURBS, GUTTERS OR HANDICAP BE DISTURBED.
<br />16. D00R HANGERS ARE TO BE PLACED A MINIMUM OF 72 H0URS PRI0R TO START OF CONSTRUCTION
<br />19. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL PLACE MESSAGE BOARDS STATING LANE
<br />CLOSURES, AND DELAYS A WEEK IN ADVANCE. LOCATION OF THE MASSAGE BOARD SHALL BE
<br />COORDINATED WITH THE CITY INSPECTOR ATTHE PRE -CONSTRUCTION MEETING.
<br />20. LANE CLOSURES CANNOT EXCEED M0RE THAN 300 FT. ATA TIME. FOR SAFETY PURPOSES THERE
<br />SHALL BE ONLY ONE CLOSURE ATA TIME ALONG INTERNATIONAL BLVD. MORE FLAGGERS WILL BE
<br />NECESSARY TO HELP VEHICLES AND PEDESTRIANS IN THE WORK ZONES DURING THE LANE
<br />CLOSURES.
<br />1 �I
<br />IMPORTANT NOTICE
<br />Section ver
<br />4218/421] of the Government Code requires a
<br />Dig Nero Identification Number to be issued before I.
<br />PLANS PREPARED BY
<br />CHC Consulting
<br />THIS IS AN COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIAL
<br />DESIGN:
<br />DRAWN BY:
<br />REV DESCRIPTION DATE
<br />COMCAST
<br />'Permit to Excawoe' will be valid For your Dig Alert I.D.
<br />CALL TOLL FREE
<br />49 HOURS BEFORE YOU DIC
<br />UNDERGROUND SERMOE ALERT
<br />YYY
<br />1945 W A 92BBB Ave., Suite 300,
<br />ora qe, CA 92868
<br />(949) 250-0004 / FAX (949) 250-0006
<br />APPROVED:
<br />APPROVED:
<br />1-800-227-2900
<br />APPROVED:
<br />3. ANCHORING FOR THE AERIAL CONSTRUCTION IS TYPICALLY
<br />DETERMINED DURING CONSTRUCTION AND IS COLLECTED IN THE
<br />AS -BUILT PHASE.
<br />1190101041016*1
<br />CONSTRUCTION TYPE: OVERLASH, POLE ACCESS, PED ACCESS, TRENCH AND BORE
<br />COUNTY: SAN JOAQUIN
<br />COMCAST CONTACT: DARREN WATSON TEL NO: (925)-596-1449
<br />DATE: 05/10/2021 SHEET: 2 OF 35