My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2021_PS-2101001 thru PS-2101500_ - PS-2101477
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2021
>
PS-2101001 thru PS-2101500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2021_PS-2101001 thru PS-2101500_ - PS-2101477
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2022 1:36:18 PM
Creation date
11/23/2022 1:34:50 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2101477
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2021
Notes2
E/S Alpine Rd. 305' S/O New Water Rd.
Address
PO Box 930, Stockton,CA 95201
Application
Pacific Gas & Electric-Stockton
Type
TCP
Supplemental fields
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
X:\ENCROACHMENTS\General Provisions (Encroachment Permits)\Winter Weather Provisions.docx <br /> <br /> <br /> <br /> <br /> SPECIAL PROVISIONS <br /> <br /> Winter Weather Utility Work <br />__________________________________________________________________________________________ <br />__________________________________________________________________________________________ <br /> <br /> <br />1. SUPERVISION: The utility company (permittee) shall furnish full-time supervision of all work to insure <br />compliance with the permit provision. <br /> <br />2. START OF WORK: No work within the County right-of-way shall be started until the utility company <br />representative has made an evaluation of weather conditions and has determined the work can be <br />accomplished under the provisions of the permit. <br /> <br />3. CLEAN PAVEMENT: Dirt and mud shall not be deposited on the pavement outside the area of work, <br />and if inadvertently tracked onto the road travel way shall be removed immediately. <br /> <br />4. DAILY RESTORATION: Private driveways and road intersections shall be restored daily. <br /> <br />5. WEATHER-TIGHT CONDITIONS: All trenches shall be filled and compacted, ditches and other <br />drainage facilities regarded and opened, and the entire work area restored to weather-tight condition prior to <br />any rain.
The URL can be used to link to this page
Your browser does not support the video tag.