Laserfiche WebLink
POLE 87 <br />CABLE <br />EXISTING <br />ATTACH AT <br />rmr <br />2r -l" <br />CALL <br />22'-1" <br />1. INSTALL NEW DEAD -ENDS BOTH <br />DIRECTIONS (2) <br />CABLE <br />EXISTING <br />ATTACH AT <br />rleBr <br />sr -f r <br />CATV <br />20'-11 <br />1. INSTALL NEW DEAD -ENDS BOTH <br />DIRECTIONS (2) <br />2. INSTALL NEW 10M SPANHEAD <br />POLE 89 <br />CABLE <br />EXISTNG <br />ATTACH AT <br />rair <br />sr -f - <br />CATV <br />24'-1" <br />1. INSTALL NEW DEAD -ENDS BOTH <br />DIRECTIONS (2) <br />2. INSTALL NEW 10M SPANHEAD <br />0—(2,7 <br />2400* LF) <br />j7( �S,S l 67 z�gL �oLE 6 x <br />w I S. mv ST. <br />N I <br />W <br />2 <br />J <br />U <br />F— <br />I <br />POLE 90 <br />CABLE <br />EXISTNG <br />ATTACH AT <br />rair <br />sr -f r <br />CATV <br />21'-11" <br />1. INSTALL NEW DEAD -ENDS BOTH <br />DIRECTIONS (2) <br />2. INSTALL NEW 10M SPANHEAD <br />MATCHUNE <br />Know whafs below. <br />Call before you dig. <br />POLE 91 <br />CABLE <br />EXISTING <br />ATTACH AT <br />N�lr <br />21' -7 - <br />CATV <br />20'-7" <br />1. INSTALL NEW DEAD -ENDS BOTH <br />DIRECTIONS (2) <br />2. INSTALL NEW 10M SPANHEAD <br />CUY TO EX. POLE (W) (L=192') <br />3. INSTALL NEW 10M DOWN GUY <br />TO EX. ANCHOR (W) (L=22') <br />4. INSTALL NEW 10M SPANHEAD <br />CUY TO EX. POLE (S) (L=154') <br />5. INSTALL NEW 10M DOWN GUY <br />TO EX. ANCHOR (S) (L=35') <br />SEE DWG A-15 <br />� OLE 91 <br />INSTALL NEW 1oM <br />SPANNEAD GW TO <br />EX. POLE (L-154') <br />INSTALL NEW foN <br />MULATEO DOWN <br />x GUY TO EX. <br />ANCHOR (L -M ) <br />F-1 <br />S. 1'BI' ST. <br />WSTALL NEW IGM <br />SPAMIM GUY TO <br />= EX. POLE (L-192') <br />r x <br />m <br />�i <br />INSTALL NEW 1GM <br />INSULATED GOWN <br />CAN TG EX. <br />ANCHOR (L-22') <br />� \Q <br />40 0 40 e0 <br />1•-eO' <br />No. C 46732 <br />