My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2021_PS-2103001 thru PS-2103500_ - PS-2103140
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2021
>
PS-2103001 thru PS-2103500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2021_PS-2103001 thru PS-2103500_ - PS-2103140
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2022 4:50:33 PM
Creation date
11/28/2022 4:47:41 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2103140
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2021
Notes2
E/S of "B" St. 200' N/O 4th St.
Address
6121 Bollinger Canyon Road,San Ramon,CA
Application
Pacific Gas & Electric-San Ramon
Type
Aerial Work
Supplemental fields
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Attachment 1a: Street Names PG&E will Encroachment in San Joaquin County ROW <br />1. A-12: PG&E will do overhead work to install fiber cable and pole maintenance work. PG&E will <br />encroach on East side of S. B St. <br />2. A-13: PG&E will do overhead work to install fiber cable and pole maintenance work. PG&E will <br />encroach on East side of S. B St. <br />3. A-14: PG&E will do overhead work to install fiber cable and pole maintenance work. PG&E will <br />encroach on South side of E 8"' Stand then at intersection with S. B St, proceeding in north <br />direction, PG&E will encroach on East side of S. B St. <br />4. A-15: PG&E will do overhead work to install fiber cable and pole maintenance work. PG&E will <br />encroach on South side of E 8"' St. <br />6. A-18: PG&E will do overhead work to install fiber cable and pole maintenance work. PG&E will <br />encroach on West side of Pock Ln. <br />7. A-19: PG&E will do overhead work to install fiber cable and pole maintenance work. PG&E will <br />encroach on West side of Pock Ln. <br />8. A-20: PG&E will do overhead work to install fiber cable and pole maintenance work. PG&E will <br />encroach on West side of Pock Ln. <br />9. A-21: PG&E will do overhead work to install fiber cable and pole maintenance work. PG&E will <br />encroach on West side of Pock Ln and then at intersection of Carpenter Rd & Pock Ln work is on <br />East side of Pock Ln. <br />
The URL can be used to link to this page
Your browser does not support the video tag.