Laserfiche WebLink
FRENCH CAMP RDS AIRPORT <br />W <br />A <br />Y0+31 EOP0+40 R/W0+00CL0+31 EOP0+40 R/W0+00CL <br />0 <br />+ <br />0 <br />0 <br />C <br />L <br />E <br />X <br />I <br />S <br />T <br />. <br /> <br />P <br />O <br />L <br />E <br /> <br /># <br />1 <br />E <br />X <br />I <br />S <br />T <br />. <br /> <br />A <br />N <br />C <br />H <br />O <br />R <br />R <br />O <br />A <br />D <br /> <br />S <br />I <br />G <br />N <br />U <br />N <br />K <br />N <br />OW <br />N <br /> <br />S <br />B <br />P/ <br />L <br />1350 FRENCH CAMP RD9542 S AIRPORT WAYDRIVEWAY <br />197'9' DIRT110'3 <br />7 <br />'N POLEFOCFACE OF CURBPROPOSED CONDUITR/WRIGHT OF WAYCLCENTERLINELEGENDBOSBACK OF SIDEWALKSSTOP SIGNCSWCONCRETE SIDEWALKCONSTRUCTION NOTESAFETY NOTE WORK AREA WILL INCLUDE LANECLOSURE ON ROAD WITH VERY HIGHTRAFFIC VOLUME. PLEASE PROVIDECOMPLETE WORK AREA PROTECTION.GENERAL NOTES:1. CONTRACTOR SHALL REQUEST LOCATION OFUNDERGROUND FACILITIES BY USA2. CONTRACTOR WILL COMPLY WITH ALLSAN JOAQUIN COUNTY REGULATIONS FOR SPLICEPIT & SURFACE COMPACTION3. CONTRACTOR WILL RETURN WORK AREA BACKTO ORIGINAL OR BETTER CONDITION PRIOR TOSTART OF WORK4. MAINTAIN 48" MINIMUM COVEREXCAVATION DATAEOPEDGE OF PAVEMENTFOLLOW PROCEDURES AS DETAILED INNORTHERN SECTOR PLAN FOR PROTECTIONOF UNDERGROUND AND BURIED CABLEM.O.P. DATEDM.O.P REQUIREDCATEGORY - 3Call USA @ 81148hrs prior to start of work1/2"0'1"FENCECONGRUEXR A SI A P A CIFIC-11/03/20220'20'10'1PL. NEW 10' GROUND BED. NOTE: FOR GROUND BED DETAILS SEE SHEET #2NOTE: FOR TYPICAL TRENCH DETAIL SEE SHEET #3