GENERAL NOTES <br />1. ALL WORK SHALL BE IN ACCORDANCE WITH THE STANDARD <br />SPECIFICATIONS OF THE GOVERNING JURISDICTION PUBLIC <br />WORKS AND LATEST EDITION OF THE STATE OF CALIFORNIA <br />STANDARD SPECIFICATIONS AND STANDARD PLANS. <br />2. ALL WORK SHALL COMPLY WITH APPLICABLE LOCAL AND <br />REGULATORY AGENCIES INCLUDING, BUT NOT LIMITED TO OSHA, <br />ETC. GENERAL NOTES SHALL APPLY TO ALL DRAWINGS. <br />3. EXISTING UTILITIES ARE SHOWN IN APPROXIMATE LOCATIONS. <br />SOME EXISTING UTILITIES MAY NOT BE DEPICTED ON THIS PLAN. <br />4. IT WILL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR TO <br />MAINTAIN CONSTRUCTION AS-BUILT DRAWINGS AND PRESENT A <br />COMPLETE SET OF DRAWINGS TO ZAYO GROUP WITHIN 7 DAYS OF <br />WORK COMPLETION. <br />5. APPROXIMATE LOCATION OF MANHOLES, SPLICE BOXES, <br />HANDHOLES, AND VAULTS ARE SHOWN ON THE PLANS. EXACT <br />FINAL LOCATION OF MANHOLES, SPLICE BOXES, HANDHOLES, AND <br />VAULTS SHALL BE DETERMINED IN THE FIELD AFTER ALL EXISTING <br />UTILITIES IN THE AREA OF WORK HAVE BEEN LOCATED. <br />COORDINATE FINAL MANHOLE, SPLICE BOX, HANDHOLE, OR VAULT <br />LOCATIONS WITH ZAYO GROUP. <br />6. ALL CONTRACTOR AND SUBCONTRACTORS SHALL BE LICENSED IN <br />ACCORDANCE WITH THE LAWS OF THE STATE OF CALIFORNIA AND <br />SHALL HAVE AND MAINTAIN A VALID CITY BUSINESS LICENSE PER <br />THE GOVERNING JURISDICTION. <br />7. THE CONTRACTOR SHALL COMPLY WITH THE PROVISIONS OF ALL <br />PERMITS, LICENSES, OR OTHER AUTHORIZATIONS APPLICABLE TO <br />THE WORK WITH RESPECT TO THE ENVIRONMENTAL QUALITY ACT. <br />8. ZAYO GROUP AND SUBCONTRACTORS SHALL ADHERE TO ALL <br />CODES, RULES, AND REGULATIONS GOVERNING CONSTRUCTION, <br />AS SET BY FEDERAL, STATE, AND LOCAL CODES, BUILDING <br />DEPARTMENT AGENCIES. <br />9. UNDERGROUND UTILITIES HAVE BEEN PROPOSED AND DRAFTED <br />FROM AVAILABLE RECORDS BUT THERE IS NO IMPLIED GUARANTEE <br />TO THEIR LOCATION. IT IS THE CONTRACTORS RESPONSIBILITY TO <br />FIELD LOCATE UNDERGROUND OBSTRUCTIONS, UTILITIES, AND <br />DUCT PATH PRIOR TO CONSTRUCTION. <br />10.CONDUIT TO BE INSTALLED WITH FIBER AND TRACER WIRE. <br />VACANT CONDUITS TO BE ROPED FOR FUTURE USE AND FIBER TO <br />BE TAGGED. LIDS OF ZAYO VAULTS & MANHOLES TO BE <br />EMBOSSED WITH "ZAYO" <br />SAFETY <br />1. THE CONTRACTOR IS RESPONSIBLE FOR JOB-SITE SAFETY <br />AND SHALL BE RESPONSIBLE FOR ALL LIABILITY IMPOSED BY <br />LAW FOR PERSONAL INJURY OR PROPERTY DAMAGE WHICH <br />MAY ARISE OUT OF THE WORK PERFORMED UNDER THE <br />ENCROACHMENT PERMIT, OR WHICH MAY ARISE OUT OF THE <br />SAFETY FAILURE ON THE PART OF THE PERMITTEE TO <br />PERFORM HIS OBLIGATIONS UNDER THIS PERMIT IN RESPECT <br />TO MAINTENANCE OF THE ENCROACHMENT. <br />2. ALL TRAFFIC CONTROL SHALL CONFORM TO THE CURRENT <br />CALIFORNIA DEPARTMENT OF TRANSPORTATION MANUAL ON <br />UNIFORM TRAFFIC CONTROL DEVICES. <br />3. ALL EXCAVATIONS SHALL CONFORM TO THE REQUIREMENTS <br />OF THE STATE OF CALIFORNIA DIVISION OF OCCUPATIONAL <br />SAFETY AND HEALTH. THE PERMITTEE MAY BE REQUIRED TO <br />OBTAIN A "PERMIT TO EXCAVATE" FROM THE DIVISION OF <br />INDUSTRIAL SAFETY, DEPARTMENT OF INDUSTRIAL <br />RELATIONS, STATE OF CALIFORNIA. <br />4. CONTRACTOR SHALL FURNISH AND MAINTAIN ALL DEVICES <br />FOR PEDESTRIAN AND VEHICULAR TRAFFIC SAFETY PER CA <br />MUTCD. ANY CONDITIONS THAT ARE DEEMED AS "UNSAFE" AS <br />IDENTIFIED BY THE INSPECTOR WILL BE CORRECTED <br />IMMEDIATELY BY THE CONTRACTOR. <br />CONTRACTOR NOTES <br />1. THE CONTRACTOR SHALL KEEP AND MAKE AVAILABLE A COPY OF <br />THE APPROVED PLANS AND CITY STANDARD PROVISIONS AT THE <br />JOB SITE AT ALL TIMES WHILE WORK IS IN PROGRESS. <br />2. ALL TRAFFIC CONTROL DEVICES SHALL BE IN PLACE BEFORE <br />WORK IS STARTED. DEVICES NO LONGER REQUIRED SHALL BE <br />REMOVED AS SOON AS POSSIBLE. <br />3. PEDESTRIAN TRAFFIC MUST BE RELOCATED ONTO PRIVATE <br />PROPERTY WITH OWNERS PERMISSION ONLY. <br />4. NO EQUIPMENT OR MATERIALS SHALL BE STORED OR PERMITTED <br />TO STAND UNPROTECTED WHERE TRAFFIC IS MAINTAINED <br />UNLESS IT IS ALLOWED BY LOCAL JURISDICTION IN WRITING. <br />5. NO EQUIPMENT OR MATERIALS SHALL BE STORED ON ROAD <br />SURFACE DURING NON-WORKING PERIODS UNLESS IT IS <br />ALLOWED BY LOCAL JURISDICTION IN WRITING. <br />6. NO EQUIPMENT OR MATERIALS SHALL BE STORED ON SIDEWALK <br />UNLESS IT IS ALLOWED BY LOCAL JURISDICTION. <br />7. EXISTING SIGNS, DELINEATIONS, GUARDRAILS, MARKERS, TREES, <br />SHRUBS, FENCES, WALKS, STEPS, ETC. THAT ARE DISTURBED BY <br />THIS CONSTRUCTION SHALL BE REPLACED OR RESTORED TO <br />THEIR ORIGINAL CONDITION. <br />8. THE REMOVAL, STORAGE, AND REPLACEMENT OF ALL <br />SHRUBBERY WILL BE THE RESPONSIBILITY OF THE CONTRACTOR <br />OR SUBCONTRACTOR. <br />9. CONTRACTOR IS RESPONSIBLE TO ARRANGE A <br />PRE-CONSTRUCTION MEETING WITH THE INSPECTOR AT LEAST 72 <br />HOURS BEFORE STARTING WORK. <br />10. CONTRACTOR SHALL BE RESPONSIBLE FOR AND SHALL PROVIDE <br />POLLUTION AND DUST ABATEMENT AND CONTROL MEASURES <br />SATISFACTORILY DURING THE COURSE OF THE WORK. <br />11. CONTRACTOR SHALL DISPOSE OF ALL SURPLUS MATERIAL OR <br />MATERIAL UNSUITABLE FOR FILLING OR GRADING OF THE SITE IN <br />A LEGAL MANNER. <br />12. THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR ALL <br />DAMAGES AND COSTS OF REPAIRS TO EXISTING UTILITIES AS A <br />RESULT OF IMPROPER PRECAUTIONS AND EXECUTION OF WORK <br />AS DEEMED BY THE GOVERNING JURISDICTION. ALL COSTS <br />ASSOCIATED SHALL BE BORNE BY THE CONTRACTOR. <br />13. EXCAVATION MATERIAL SHALL BE STORED AWAY FROM THE <br />PAVED ROADWAY WHENEVER POSSIBLE. ALL SPILLED MATERIAL <br />IS TO BE REMOVED TO AVOID SLIPPERY CONDITIONS. <br />14. THE CONTRACTOR SHALL CALL UNDERGROUND SERVICE ALERT <br />(CALIFORNIA 1-800-227-2600) PRIOR TO DIGGING IN ORDER TO <br />LOCATE UTILITIES. IN ADDITION, THE CONTRACTOR SHALL NOTE <br />THAT NOT ALL UTILITY OPERATORS ARE REPRESENTED BY <br />UNDERGROUND SERVICE ALERT AND SHOULD CONTACT ALL <br />UTILITY COMPANIES THAT MAY HAVE STRUCTURES IN THE AREA. <br />15. TRAFFIC SIGNAL DETECTOR LOOP CIRCUITS ARE NOT SHOWN. <br />CONTRACTOR SHALL LOCATED ALL TRAFFIC SIGNAL DETECTOR <br />LOOP CIRCUITS PRIOR TO ANY TRENCHING OR BORING. ALL <br />TRAFFIC LOOP DETECTOR CIRCUITS SHALL BE MAINTAINED AND <br />PROTECTED. NOTIFY TRAFFIC DEPARTMENT 48 HOURS PRIOR TO <br />ANY WORK IN THESE AREAS. <br />16. DEPTHS OF EXISTING UTILITIES NOT REQUIRED OR AVAILABLE. <br />LIGHT VERTICAL LINES SHOWN IN PROFILES INDICATE <br />APPROXIMATE UTILITY LOCATION ALONG THE DUCT, THE <br />CONTRACTOR SHALL POTHOLE TO CONFIRM EACH DEPTH. <br />17. NO TRENCH OR HOLES SHALL BE LEFT OPEN OVERNIGHT. STEEL <br />PLATES SHALL BE USED TO PROTECT TRENCHES OVERNIGHT. <br />18.CONDUIT TO BE INSTALLED WITH FIBER AND TRACER WIRE. <br />VACANT CONDUITS TO BE ROPED FOR FUTURE USE AND FIBER <br />TO BE TAGGED. LIDS OF ZAYO VAULTS & MANHOLES TO BE <br />EMBOSSED WITH "ZAYO" <br />ACRONYMS AND ABBREVIATIONS: <br />ABV <br />CNDT <br />CT <br />(E) <br />MPOE <br />(N) <br />TEMP <br />ABOVENET <br />CONDUIT <br />COUNT <br />EXISTING <br />MINIMUM POINT OF ENTRY <br />NEW <br />TEMPORARY <br />LEGEND: <br />NEW CNDT (DIRECTIONAL BORE) <br />FIBER PLACEMENT ISP <br />NEW CNDT (OPEN TRENCH) <br />FIBER PLACEMENT WITHIN (E) CNDT <br />TEMP BORE PIT <br />CONCRETE GUTTER <br />EXISTING PADMOUNT STRUCTURE <br />EXISTING FIRE HYDRANT <br />EXISTING MANHOLE / VALVE BOX <br />EXISTING VAULT / HANDHOLE <br />EXISTING SINGLE MAST ARM SL <br />PAD <br />EXISTING DOUBLE MAST ARM SL <br />EXISTING BACKFLOW PREVENTERBFP <br />EXISTING ELECTRIC <br />EXISTING GAS <br />EXISTING SANITARY SEWER <br />EXISTING STORM DRAIN <br />EXISTING WATER <br />PROPERTY LINE <br />CENTER LINE <br />FACE OF CURB <br />SIDEWALK <br />RIGHT OF WAY <br />PL <br />EXISTING FENCE LINE <br />W <br />SD <br />SS <br />GAS <br />E <br />S/W <br />ROW <br />POTHOLE MARKER <br />2 <br />NOTES <br />Rapid Systems Engineering <br />164 Robles Way #271 <br />Vallejo, CA 94591 <br />Contact: Brian Portugais <br />17550 Patterson <br />Pass Rd - New <br />Build <br />PROJECT TEAM <br />ENGINEER <br />Company Name: Rapid Systems Engineering <br />Address: 164 Robles Way #271 <br />City, State, Zip: Vallejo, CA 94591 <br />Contact: Brian Portugais <br />Phone: (208) 407-7338 <br />Email: brian@rapidsystemsengineering.com <br />Site Identifier: <br />17550 Patterson Pass Rd <br />NOTES: <br />Product Type: <br />Fiberline <br />Site Address: <br />17550 Patterson Pass Rd, Tracy, CA 95391 <br />City: <br />Tracy <br />County: <br />San Joaquin <br />PROPRIETARY STATEMENT: <br />THE INFORMATION CONTAINED IN THIS SET OF <br />CONSTRUCTION DOCUMENTS IS PROPRIETARY <br />BY NATURE. ANY USE OR DISCLOSURE OTHER <br />THAN THAT WHICH RELATES TO CARRIER <br />SERVICES IS STRICTLY PROHIBITED <br />SHEET NAME: <br />DRAWN BY: <br />APPROVED BY: <br />DE <br />BP <br />SHEET: <br />REVISIONS <br />0 Submittal DE <br />DATE ISSUED: <br />9/21/2022 <br />PROJECT INFORMATION: <br />REV:DATE:DESCRIPTION:BY: <br />brian@rapidsystemsengineering.com <br />OF 12 SHEETS <br />PROJECT MANAGER <br />Company Name: Starz Telecom Inc <br />Address: 309 Sango Ct <br />City, State, Zip: Milpitas, CA 95035 <br />Contact: Sam Isaacson <br />Phone: (916) 634 3675 <br />Email: sam.isaacson@starztelecom.com <br />9/21/2022 <br />N-1