Laserfiche WebLink
LEGENDSSheet 1:· Sheet 2:· Sheet 3-5:Sheet 6-7:· Sheet 8· Sheet 9-15A CONGRUEX COMPANYRPLANS PREPARED BY:VICINITY MAPWORK LOCATIONSCover-TitleSymbology & AbbreviationsConstruction Plans (S Harlan Rd.)Typical Details SheetTCP General notes and TablesTraffic Control PlanE EQUIPMENT CTWEST S <br />I <br />D <br />E <br /> <br />F <br />W <br />Y <br />MANTH <br />E <br />Y <br /> <br />R <br />D <br />MANTHEY RD <br />S HAR <br />L <br />A <br />N <br /> <br />R <br />D· · BUILD·Bore Footage(s):·Trench footage(s):·Rock Saw Footage(s):·Bore Pit(s):·Pothole(s) (2X2):·New CATV Vault(s):·Existing CATV Vault(s):·Anchor(s):·Existing Pole(s):·New Pedestal(s):·Existing Pedestal(s):·(N) Overlash:·(N) Strand & lash:·Concrete R&R(Sq. FT.)·Total Footage(s):404'23'022202700222'257'0906'WORK LOCATION ADDRESS# S HARLAN RD & E EQUIPMENT CT, SAN JOAQUIN, CAJOB NO# JB1212129·Scope of Work to Target Address 9966 S HARLAN RD·This project proposes to tie in at existing pole #1 & overlash approx. 222' to existing pole #2 and riser down. Hand trench andbore approx. 13' and 342' to place 2-2" conduit from existing pole #2 to existing pole #4 and riser up. Place (N) Strand & lashfiber cable of approx. 257' from existing pole #4 to eixsiting pole #6 via 1 existing poles and riser down. Hand trench and boreapprox. 10' and 62' to place 2-2" conduit from existing pole #6 to county ROW via 2 new Comcast vaults on S Harlan Rd.·Place new anchor on Pole #4 & Pole #6 on S Harlan Rd.·Place riser on Pole #2, #4 & #6 on S Harlan Rd.·Access Pole #7 for splicing on S MCKINLEY AVE.·Place traffic control signage in COUNTY OF SAN JOAQUIN R.O.W. for the work being performed in the LATHROP CITY·We will not disturb any monuments we pass. Our path of travel will remain 10' from monument.·Estimate construction days : 5 Days