Laserfiche WebLink
BLEWETT ROAD20 002100 <br />22 00 <br />23 00 <br />24 00BLEWETT ROAD25 002600 <br />27 00 <br />28 00 <br />29 00 EDGE OFGRIND AND OVERLAYEDGE OF GRINDAND OVERLAYSTA: 27+82.60END DETAIL 6STA: 28+47.57BEGIN DETAIL 6STA: 27+82.56END DETAIL 27BSTA: 27+82.63END DETAIL 27BSTA: 28+47.53BEGIN DETAIL 27BSTA: 28+47.61BEGIN DETAIL 27BNOTES1.REFER TO APPLICABLE NOTES AND DETAILS ON SHEET C1.2.2.CONTRACTOR SHALL INSTALL STRIPING PER MUTCD AND SAN JOAQUIN COUNTY STANDARDS ANDSPECIFICATIONS. SEE PLANS FOR SPECIFIC MUTCD DETAIL REFERENCES.LEGENDEXISTING CONCRETEEXISTING DIRT ROADPROPOSED PAVEMENT3" GRIND AND OVERLAYEXISTING PAVEMENTAPPROVED <br />SHEETNUMBERDATEDESCRIPTIONS <br />REVISIONS <br />NO. <br />CALIFORNIAJOB #:DATE:SCALE:DRAWN:DESIGN:CHK'D:PLOTTED: 11/18/2022 15:15 PLOTTED BY: NmachadoDWGNAME: F:\22-3035 Blewett Road 2022 Overlay\Civil\Imp Plans\C3.3 STR.dwg <br />C3.3COPYRIGHT © 2022 NORTHSTAR ENGINEERING GROUP, INC22-3035NBBNBBDSL/NJM11/18/2022SAN JOAQUIN COUNTY, <br />BLEWETT ROAD RE-SURFACING <br />IMPROVEMENT PLANS FOROVERLAY AND STRIPING PLAN - BLEWETT ROAD (STA 19+50 TO 24+50)OVERLAY AND STRIPING PLAN - BLEWETT ROAD (STA 24+50 TO 29+50)SEE SECTION BELOW <br />SEE SECTION ABOVE <br />SEE SHEET C3.4 <br />SEE SHEET C3.2 <br />OVERLAY AND STRIPING PLAN <br />AS SHOWN11/18/22