Laserfiche WebLink
BLEWETT ROAD70 007100 <br />72 00 <br />73 00 <br />74 00STA: 73+17.83END DETAIL 22BEGIN DETAIL 19BLEWETT ROAD75 007600 <br />77 00 <br />78 00 <br />79 00 <br />NOTES1.REFER TO APPLICABLE NOTES AND DETAILS ON SHEET C1.2.2.CONTRACTOR SHALL INSTALL STRIPING PER MUTCD AND SAN JOAQUIN COUNTY STANDARDS ANDSPECIFICATIONS. SEE PLANS FOR SPECIFIC MUTCD DETAIL REFERENCES.LEGENDEXISTING CONCRETEEXISTING DIRT ROADPROPOSED PAVEMENT3" GRIND AND OVERLAYEXISTING PAVEMENTAPPROVED <br />SHEETNUMBERDATEDESCRIPTIONS <br />REVISIONS <br />NO. <br />CALIFORNIAJOB #:DATE:SCALE:DRAWN:DESIGN:CHK'D:PLOTTED: 11/18/2022 15:17 PLOTTED BY: NmachadoDWGNAME: F:\22-3035 Blewett Road 2022 Overlay\Civil\Imp Plans\C3.8 STR.dwg <br />C3.8COPYRIGHT © 2022 NORTHSTAR ENGINEERING GROUP, INC22-3035NBBNBBDSL/NJM11/18/2022SAN JOAQUIN COUNTY, <br />BLEWETT ROAD RE-SURFACING <br />IMPROVEMENT PLANS FOROVERLAY AND STRIPING PLAN - BLEWETT ROAD (STA 69+50 TO 74+50)OVERLAY AND STRIPING PLAN - BLEWETT ROAD (STA 74+50 TO 79+50)SEE SECTION BELOW <br />SEE SECTION ABOVE <br />SEE SHEET C3.9 <br />SEE SHEET C3.7 <br />OVERLAY AND STRIPING PLAN <br />AS SHOWN11/18/22