Laserfiche WebLink
IT IS THE RESPONSIBILITY OF THE CONTRACTOR PERFORMING WORK TO INSTALL AND MAINTAIN THE TRAFFIC CONTROL DEVICES AS SHOW HEREIN AS WELL AS ANY SUCH <br />ADDITIONAL TRAFFIC CONTROL DEVICES MAY BE REQUIRED TO INSURE THE SAFE MOVEMENT OF VEHICULAR AND PEDESTRIAN TRAFFIC THROUGH OR AROUND THE WORK <br />AREA AND PROVIDE MAXIMUM PROTECTION AND SAFETY TO CONSTRUCTION WORKERS <br />ALL TRAFFIC CONTROL DEVICES SHALL BE KEPT IN THEIR PROPER POSITIONS AT ALL TIMES AND SHALL BE REPAIRED, REPLACED, OR CLEANED AS NECESSARY TO PRESERVE <br />THEIR APPEARANCE AND CONTINUITY. <br />THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, MEHTODS, DETAILS, DIMENSIONS, AND PROCEDURES DESCRIBED AND IN TEH 2014 MUTCD. <br />ALL FLASHING ARROW SIGNS SHALL BE SOLAR POWERED. <br />CONTRACTOR SHALL PROVIDE FLAGMEN AS NECESSARY TO GIVE ADEQUATE WARNING TO TRAFFIC OR TO THE PUBLIC OF ANY DANGEROUS CONDITIONS TO BE ENCOUNTERED <br />CONTRACTOR SHALL REMOVE TEMPORARY TRAFFIC DELINEATION, SIGNAGE, AND OTHER DEVICES WHEN NO LONGER REQUIRED, AND SHALL RESTORE AREAS TO ORIGINAL <br />CONDITIONS. <br />ALL PERSONS IN TRAFFIC CONTROL ARE SHALL WEAR APPROPIATE REFLECTIVE VESTS. <br />CONTRACTOR SHALL COVER EXISTING SIGNS WHERE THEY CONFLICT WITH CONSTRUCTION DETOURS & SIGNING. <br />ALL OPEN OR EXCAVATION OR CONSTRUCTION WORK SHALL BE A MINIMUM OF 5' FROM ANY OPERATING TRAFFIC LANES. <br />CONTRACTOR SHALL CORDINATE WITH CITY AGENCY FOR ANY TEMPORARY TRAFFIC CONTROL SIGNAL TIMING MODIFICATIONS. <br />THE CONTRACTOR SHALL PROVIDE FOR ACCESS TO ALL ADJACENT PROPERTIES DURING WORK HOURS. CONSTRUCTION OPERATIONS SHALL BE CONDUCTED IN SUCH A MANNER <br />AS TO CAUSE AS LITTLE INCONVENIENCE AS POSSIBLE TO ABUTTING PROPERTY OWNERS/OPERATORS. <br />ALL SIGNS SHALL BE STANDARD SIZE AND REFLECTORIZED AT NIGHT. <br />TRAFFIC CONTROL NOTES: <br />Date:3/28/2021 Author:J.M Project:SAN JOAQUIN COUNTY OF EDU. <br />Comments: <br />SYSTEM: SAN JOAQUIN COUNTY <br />PROJECT #: 39973 <br />PROJECT ADDRESS: 2922 Transworld Dr <br />PRIME CONTRACTOR: WAVE <br />G-1 <br />SHEET 3 OF 9 <br />NOTIFICATION AND <br />OUT REACH WILL BE PROVIDED TO AFFECTED <br />PROPERTIES 48 HOURS IN ADVANCE . <br />TEMPORARY NO PARKING SIGNS, WHEN <br />REQUIRED, SHALL BE SET UP AT LEAST 48 <br />HOURS PRIOR TO THE START OF WORK. SAID <br />SIGNS SHALL INCLUDE DATES AND HOURS OF <br />WORK AND CONTRACTORS CONTACT NUMBER. <br />CONST HOURS: <br />ARTERIALS/COLLECTORS ALL OTHER ROADS <br />MON-FRI: 9:00AM-3:00PM MON-FRI: 8:30AM-4:30PM <br />SAT-SUN: PER REQUEST <br />NIGHTS <br />SUN-THURS: PER REQUEST <br />www.invarion.com