Laserfiche WebLink
BUILD <br />·Bore Footage(s): <br />·Trench Footage(s): <br />·Rock Saw Footage(s): <br />·Emt Footage(s): <br />·Bore Pit(s): <br />·Dig Pit(s): <br />·Potholes (2X2): <br />·New Catv Vault(s): <br />·Existing Catv Vault(s): <br />·Existing Pole(s): <br />·New Pole(s): <br />·Riser Footage: <br />·Existing Pedestal(s): <br />·Overpull Existing Conduit: 1258 <br />·(N)Overlash Footage: 200 <br />·Concrete R&R(Sq. FT.) <br />·Asphalt R&R(Sq. FT.) <br />·Total Footage: 1458 <br />VICINITY MAP <br />LEGEND <br />·Sheet 1: Cover-Title <br />·Sheet 2: Legends <br />·Sheet 3-4: Scope of Work <br />·Sheet 5: TCP General Notes and Tables <br />·Sheet 6-7: Traffic Control Plan <br />Scope of work 1: <br />JOB NO# JB1177172 <br />WORK LOCATION:1918 Industrial Dr, Stockton, CA 95206 <br />Work Duration: 3 Days <br />Tie into existing splice case and overlash 200' West. Riser down, and <br />overpull 1258' to target building.COMCASTScope of work 2: <br />Tie into existing splice case to perform splice.