Laserfiche WebLink
PROJECT DETAILS <br />INSTALL CONDUCTOR AND SET METERING FOR 200A 1Ø 120/240V UG SERVICE <br />APPLICANT INSTRUCTIONS <br />LOC 3: TRENCH AND INSTALL 3" CONDUIT PER DWG 062288 AND 200A PANEL <br />PG&E ELECTRIC CREW INSTRUCTIONS <br />LOC 1: UPGRADE SS ROUND TX TO 100kVA <br />LOC 2: REPLACE SPLICING WITH MULTI-TAP BUS <br />TRENCH AND INSTALL 3" CONDUIT <br />INSTALL 4/0A TPX SVC <br />ABANDON 1/0 CIC <br />LOC 3: INSTALL CABLE THROUGH #1 PULL BOX, INSTALL STRAIGHT SPLICES IF NEEDED <br />INSTALL 4/0A TPX SVC AND SET METERING