Laserfiche WebLink
JOB#/PM# <br />45121256 <br />PRIME CONTRACTOR <br />PGE <br />PREPARED BY <br />CITY RISE, LLC <br />DATE PREPARED <br />09/12/2022 <br />SHEET# <br />TC-1 <br />INITIALS <br />ZL <br />AGENCY <br />Stockton <br />SCALE <br />NOT TO SCALE <br />TCP QUESTIONS CALL: <br />209-400-7075 <br />PROJECT LOCATION <br />Plymouth Rd & Oxford Way <br />TAPER TANGENT <br />WORK AREA CONE SPACINGŸTRAFFIC CONTROL PER LATEST CA <br />MUTCD. <br />Ÿ ALL FLAGGERS TO COMMUNICATE <br />THROUGH HAND SIGNALS AND <br />RADIO DEVICES. <br />Ÿ PEDSTRIAN, BICYCLE, AND <br />DRIVEWAYS TO REMAIN OPEN <br />UNLESS NOTED ON TRAFFIC PLAN.HOURS OF WORK TO BE DETERMINED BY AGENCY.Taper 245 <br />’ <br />35’70’ <br />TOW-AWAY <br />ZONE <br />P <br />DATE: <br />TIME: <br />TOW-AWAY <br />ZONE <br />P <br />DATE: <br />TIME: <br />NO PARKING SIGNS <br />Barricade mounted, placed <br />on the street 20ft apart. <br />At least 48hrs prior to the <br />start of work. <br />100’ <br />Country <br /> <br />C <br />l <br />u <br />b <br /> <br />B <br />l <br />v <br />d <br /> <br />35 <br />Plymouth Rd 35Oxford <br />W <br />a <br />y <br /> <br />25 <br />Plymouth Rd 2511’Plymouth Rd 35Caltrans Offramp250’ 250’ 100’ 250’ <br />Matchline <br />Matchline 250’ ROADWORKAHEADW20-1ROADWORKAHEADW20-1ROADWORKAHEADW <br />2 <br />0 <br />- <br />1ROADWORKAHEADW20-1ROAD <br />WORK <br />AHEAD <br />W20-1 <br />W4-2 R <br /> LANE <br />CLOSED <br />C30 (CA <br />) <br />W11-1 <br />W16-1P <br />SHARE <br />THE RO <br />A <br />D <br />ARROW <br />B <br />O <br />A <br />R <br />D