My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2021_PS-2101001 thru PS-2101500_ - PS-2101142
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2021
>
PS-2101001 thru PS-2101500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2021_PS-2101001 thru PS-2101500_ - PS-2101142
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2023 3:38:26 PM
Creation date
1/6/2023 3:36:18 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2101142
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2021
Notes2
E/S of Clements Rd. 2471' N/O Frazier Rd.
Address
PO Box 3031, Fresno,CA 93720
Application
Pacific Gas & Electric-Fresno
Type
(N) Pole Install
Supplemental fields
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CONSTRUCTION NOTE <br />·BUCKET TRUCK ACCESSIBLE <br />·TCP/FLAGGING REQUIRED <br />·ENCROACHMENT PERMIT REQUIRED <br />·LAND SERVICES REQUIRED <br />VICINITY SKETCH <br />3183351-5764010 <br />45' <br />45'40' <br />CCTL 11745' <br />888309 <br />30T <br />2-2AR 12KV <br />3-2AR 12KV572'3-2AR 12KV <br />615' <br />3-2AR 12KV <br />500'3-2AR 12KV500' <br />3-2AR 12KV <br />15'3-2AR 12KV457'3-2AR (SLACK) 12KV25'INTERSET NEW POLE <br />50' - CL 2 <br />SET 8' DEEP <br />SET 15' S/O SAP ID: <br />102073042 <br />INSTALL 3-PT44H W/ <br />6T FUSES <br />SET NEW POLE <br />50' - CL 2 <br />SET 8' DEEP <br />SET 25' NW/O LOC 1 <br />INSTALL PGE ANCHOR <br />PISA 15M - 11' LEAD <br />2 - 3/8" PRI DG's <br />SET NEW POLE <br />50' - CL 3 <br />SET 8' DEEP <br />SET 615' W/O LOC 2 <br />SET NEW POLE <br />50' - CL 2 <br />SET 8' DEEP <br />SET 500' W/O LOC 4 <br />INSTALL 15/15 OPEN <br />DELTA TRANSFORMERS <br />INSTALL PGE ANCHOR <br />PISA 15M - 11' LEAD <br />2 - 3/8" PRI DG <br />SET NEW POLE50' - CL 3 <br />SET 8' DEEP <br />SET 500' W/O LOC 3 N. CLEMENTS RD0.85 MI TO SSD:RECLOSER 641445' <br />PG97-1280 <br />40' <br />819993 <br />6T <br />CLEMENTS RD <br />2.5MI <br />JOB SITE <br />COMSTOCK RD <br />1.6 MI <br />N. FINE RD0.9 MIE COMSTOCK RD <br />CA ROUTE <br />2 <br />6 <br />15 <br />1/0A QPX30' <br />:PUMP:100000057678 15 3Ø120/240 <br />15HP 120/240V <br />4W 3PH PUMP <br />100A PANEL <br />SCI: 10,000A <br />VD = 2.68V <br />NEW 3-2AR 12kV <br />LEGEND <br />EXISTING 3-2AR 12kV <br />EXISTING 2-2AR 12kV <br />Know what's below. <br />Call before you dig.
The URL can be used to link to this page
Your browser does not support the video tag.