My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2021_PS-2101001 thru PS-2101500_ - PS-2101078
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2021
>
PS-2101001 thru PS-2101500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2021_PS-2101001 thru PS-2101500_ - PS-2101078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2023 10:23:27 AM
Creation date
1/9/2023 10:19:41 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2101078
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2021
Notes2
837 S. Hinkley Ave.; W/S of Hinkley Ave. 523' N/O Main St.
Address
1602 E. Lafayette St., Stockton,CA 95205
Application
California Water Service
Type
Bell Hole
Supplemental fields
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1117 <br />California MUTCD 2014 Pdi'don as amended for use in California) <br />(FSWA's MUTCD 2009 Edition, including Revisions 1 & 2, <br />Table 6F-101(CA). Maximum S acin of Channeiizm uevwc� <br />Maximum Channelizing Devices Spacing <br />Speed Taper* Tangent Conflict" <br />(mph) (feet) (feet) (feet) <br />20 <br />20 40 10 25 25 50 12 <br />30 <br />30 60 15 35 35 70 17 <br />40 <br />40 80 20 <br />45 <br />45 90 22 50 50 100 25 <br />55 <br />50 100 25 60 50 100 25 <br />65 <br />50 100 25 <br />70 50 100 25 <br />75 <br />50 100 25 <br />" Maximum channelizing device spacing for all speeds on one-laneltwo-way tapers is <br />20 feet. <br />Maximum channelizing device spacing for all speeds on downstream tapers is 20 <br />feet. <br />All other tapers are as shown. <br />"" Use on intermediate and short-term projects for taper and tangent secf)15 where <br />there are no pavement markings or where there is a conflict between existing <br />pavement markings and channelizing devices. <br />November 7, 2014 <br />Chapter 6F — Temporary Traffic Control Zone Devices <br />Put 6 —Temporary Traffic Control <br />
The URL can be used to link to this page
Your browser does not support the video tag.