Laserfiche WebLink
page 1117 <br />California MU T CD 2014 Edition <br />(BHWA's MUTCD 2009 Edition, including Revisions 1 & 2, as amended for use in Ca ifornia) <br />Table 6F-101(CA). Maximum S acin of Channeltzln uevn.ca <br />Maximum Channeiizing Devices Spacing <br />Speed Taper' Tangent Conflict`" <br />(mph) rfootl (feet) (feet) <br />20 40 10 <br />20 12 <br />25 25 50 <br />30 <br />30 60 15 35 35 70 17 <br />40 <br />40 80 20 45 45 90 22 <br />50 <br />50 100 25 55 50 100 25 <br />60 <br />50 100 25 65 50 100 25 <br />50 100 25 <br />70 <br />75 50 100 25 <br />Maximum channelizing device spacing for all speeds on one-lane(tWn-way tapers is <br />20 feet. <br />Maximum channelizing device spacing for all speeds on downstream tapers is 20 <br />feet. <br />All other tapers are as shown. <br />"" Use on intermediate and short-term projects for taper and tangent recto where <br />there are no pavement markings or where there is a conflict between existing <br />pavement markings and channelizing devices. <br />Cbapter 6F -Temporary Traffic Control Zone Devices November 7, 2014 <br />Put 6 - Temporuy Traffic Control <br />