My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2021_PS-2100501 thru PS-2101000_ - PS-2100884
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2021
>
PS-2100501 thru PS-2101000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2021_PS-2100501 thru PS-2101000_ - PS-2100884
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2023 11:50:40 AM
Creation date
1/10/2023 11:49:06 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2100884
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2021
Notes2
Schulte Rd. Between Macarthur Dr. and Chrisman Rd.
Address
265 Val Dervin Pkwy., Stockton,CA 95206
Application
Teichert Construction
Type
(2)-CMS Boards
Supplemental fields
Cross Ref
PWP7110005
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PS-2100884 March 16, 2021 <br /> <br />SPECIAL CONDITIONS FOR <br />TEICHERT CONSTRUCTION – SCHULTE RD. <br />ENCROACHMENT PERMIT <br /> <br />1. Maintain traffic controls for all roads. Traffic control delays shall not exceed 15 minutes. <br />Two-way traffic shall be maintained during non-working hours with excavated areas backfilled or <br />plated. During working hours, two-way traffic control shall be maintained with one lane open and <br />appropriate flaggers. <br /> <br />2. Access to all properties shall be maintained at all times except when work is occurring at the <br />access point. Minimal delays will be allowed to provide access within the work zone area. <br />Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br />contractor shall be replaced with in-kind or better materials. <br /> <br />3. County roads shall be kept clean from mud and debris at all times along the access points and <br />work zone areas during entire project. All standard roadway striping and signage shall be clearly <br />visible, maintained and restored throughout the construction zone during and after the project. <br /> <br />4. The contractor shall not conduct construction operations in rain or heavy fog conditions.
The URL can be used to link to this page
Your browser does not support the video tag.