Fremont Bridge replacement (Rte 26/99 Separation, Br No. 29-0142 <br />Work Description (Rte 26 PM 1.1) <br /> <br />Replace Route 26/99 Separation Bridge in 2 main stages. Westbound half of the bridge will <br />be demolished first. This will take approximately 2-4 days. Route 99 will be closed <br />between midnight and 5:00 a.m., and SB 99 traffic will be detoured onto Fremont St. for <br />2-4 days between the bridge and Filbert St. Then at Filbert St., traffic will make a left turn <br />and go south to Route 4 and use Route 4 to get back onto SB 99. The falsework will be <br />constructed, and new girders will be erected, and Route 99 will be closed again between <br />midnight and 5:00 a.m., and SB 99 traffic will be detoured onto Fremont St. for 2-4 days <br />between the bridge and Filbert St. Then at Filbert St., traffic will make a left turn and go <br />south to Route 4 and use Route 4 to get back onto SB 99. Eastbound half of the bridge will <br />be demolished approximately 4 months later This work will take approximately 2-4 days. <br />Route 99 will be closed between midnight and 5:00 a.m., and SB 99 traffic will be detoured <br />onto Fremont St. for 2-4 days between the bridge and Filbert St. Then at Filbert St., traffic <br />will make a left turn and go south to Route 4 and use Route 4 to get back onto SB 99. The <br />falsework will be constructed, and new girders will be erected, and Route 99 will be closed <br />again between midnight and 5:00 a.m., and SB 99 traffic will be detoured onto Fremont St. <br />for 2-4 days between the bridge and Filbert St. Then at Filbert St., traffic will make a left <br />turn and go south to Route 4 and use Route 4 to get back onto SB 99. <br />