Laserfiche WebLink
PFP 432 CONCRETE PAD AND MOUNTING BRACKET <br />2" <br />PFP 432 CAB <br />40.5"H 25"W 19.91) <br />CONCRETE PAD APPROX W5WELDEO WIRE WS WELDED WIRE <br />T ABOVE LANDSCAPED GRADE <br />.e" SAND QRGRAVELBER ' <br />. ........................... <br />PROFILE OF CONCRETE PAD <br />WITHIN LANDSCAPED AREA <br />CONCRETE PAD DIMENS <br />VERY PER LOCA <br />MOUNTING BRi <br />r.SW. OR GRAVEL BED. <br />............................ <br />PROFILE OF CONCRETE PAD <br />FLUSH WITH EXISTING GRADE <br />PFP CABINET <br />MOUNTING BRACKET <br />46L CONSTRUCTION NOTES. <br />- EXCAVATE THE PAD AREA DEEP ENOUGH TO PLACE <br />6 INCHES OF 90% COMPACTED SAND OR GRAVEL <br />BED. <br />- CONCRETE SHOULD BE A MINIMUM OF 4INCHES. <br />- PLACE WS WELDED WIRE FABRIC APPROX. 2 <br />INCHES BELOW THE CONCRETE SURFACE FOR THE <br />CONCRETE PAD. <br />- DO NOT SECURE MOUNTING BRACKET UNTILTHE <br />REINFORCEMENT WIRE IS IN PLACE. WHEN PLACED <br />MAKE SURE THE BRACKET IS LEVEL. <br />- ENSURE THAT THE TOP OF CONCRETE PAD IS <br />APPROX. 2 INCHES ABOVE LANDSCAPED AREA. <br />- WHEN PLACING THE PAD IN OR ABUTTING THE <br />CONCRETE AND OR ASPHALT AREA, ENSURE THE <br />TOP OF CONCRETE PAD IS FLUSH WITH THE <br />SURROUNDING GRADE. <br />- THE TOP SURFACE OF THE MOUNTING BRACKET <br />SHOULD BE VISIBLE AND FREE OF CONCRETE <br />WHEN THE PAD IS COMPLETE. <br />0 <br />0 <br />LANDSCAPED <br />EARTH <br />CONCRETE PAD <br />SAND OR <br />EXISTING CONCRETE OR <br />AREA <br />GRAVELBED <br />ASPHALTAREA <br />CONCRETE PAD APPROX W5WELDEO WIRE WS WELDED WIRE <br />T ABOVE LANDSCAPED GRADE <br />.e" SAND QRGRAVELBER ' <br />. ........................... <br />PROFILE OF CONCRETE PAD <br />WITHIN LANDSCAPED AREA <br />CONCRETE PAD DIMENS <br />VERY PER LOCA <br />MOUNTING BRi <br />r.SW. OR GRAVEL BED. <br />............................ <br />PROFILE OF CONCRETE PAD <br />FLUSH WITH EXISTING GRADE <br />PFP CABINET <br />MOUNTING BRACKET <br />46L CONSTRUCTION NOTES. <br />- EXCAVATE THE PAD AREA DEEP ENOUGH TO PLACE <br />6 INCHES OF 90% COMPACTED SAND OR GRAVEL <br />BED. <br />- CONCRETE SHOULD BE A MINIMUM OF 4INCHES. <br />- PLACE WS WELDED WIRE FABRIC APPROX. 2 <br />INCHES BELOW THE CONCRETE SURFACE FOR THE <br />CONCRETE PAD. <br />- DO NOT SECURE MOUNTING BRACKET UNTILTHE <br />REINFORCEMENT WIRE IS IN PLACE. WHEN PLACED <br />MAKE SURE THE BRACKET IS LEVEL. <br />- ENSURE THAT THE TOP OF CONCRETE PAD IS <br />APPROX. 2 INCHES ABOVE LANDSCAPED AREA. <br />- WHEN PLACING THE PAD IN OR ABUTTING THE <br />CONCRETE AND OR ASPHALT AREA, ENSURE THE <br />TOP OF CONCRETE PAD IS FLUSH WITH THE <br />SURROUNDING GRADE. <br />- THE TOP SURFACE OF THE MOUNTING BRACKET <br />SHOULD BE VISIBLE AND FREE OF CONCRETE <br />WHEN THE PAD IS COMPLETE. <br />