Laserfiche WebLink
TUXEDO AVE.POLE # 87POLE # 8665' SHIFT TAPER174' BUFFER111'T.A.N.S.A.TT.A.N.S.A.TT.A.N.S.A.T65' SHIFT TAPER100'100'100'W1-3LR4-7aKEEPRIGHTW1-3LR3-4R4-7aKEEPRIGHTW6-4CONEMOUNTEDSIGNW6-4CONEMOUNTEDSIGNW6-4CONEMOUNTEDSIGNW6-4CONEMOUNTEDSIGNW1-3RW1-3RNARROWLANEC12(CA)ROADWORKAHEADW20-1R4-7aKEEPRIGHTW1-3RENDROAD WORKG20-2ROADWORKAHEADW20-1ENDROAD WORKG20-2ROADWORKAHEADW20-1ENDROAD WORKG20-2ROADWORKAHEADW20-1ENDROAD WORKG20-2ROSELAWN AVE.MIDDLEFIELD AVE.16'15'15'16'16'16'16'12'12' MAX12' <br />12' <br />12' <br />12' <br />12'25' MAX25' MAX16'16'16'16'TUXEDO AVE.SPEEDLIMIT25 MISSION RD.SPEEDLIMIT25MISSION RD.SPEEDLIMIT25MISSION RD.CONTACT PROPERTY OWNER(S) 72HOURS PRIOR TO START OF WORK16'16'12' <br />12'ESCORT PEDESTRIANSTUXEDO AVE.65' SHIFT TAPER174' BUFFER111'100'T.A.N.S.A.TNARROWLANEC12(CA)W1-3LROADWORKAHEADW20-1W1-3LENDROAD WORKG20-2R4-7aKEEPRIGHTW1-3LW6-4CONEMOUNTEDSIGNW6-4CONEMOUNTEDSIGNROAD WORKG20-2ROADWORKAHEADW20-1ENDROAD WORKG20-2ROADWORKAHEADW20-1ENDROAD WORKG20-2SPEED <br />LIMIT25 <br />MISSION <br />RD.16'16'15'15'15'15'12' <br />12' <br />12'25' MAXTUXEDO AVE.SPEEDLIMIT25MISSION RD.100'ESCORT PEDESTRIANSTHROUGH WORK AREA.16'16'CONTACT PROPERTY OWNER(S) 72HOURS PRIOR TO START OF WORKR9-9SIDEWALKCLOSEDPLACEON BOTH SIDES OFTHE WORK AREA.DA # 310301DATEISSUEGEO/COEXCH.ENGR. TEL.ENGR ARCTYPE OF CONST.PLANRO/EST. NO.A01Z93WDWG. OF P504COUNTY OF: SAN JOAQUIN02/2021PLANS PREPARED BY:J5 INFRASTRUCTURE PARTNERS1UESKTNCA01MATT OCHS(707)-428-2343VOKDLEE00TRAFFIC CONTROL36SCALE: 1"=60'18 LEGEND:= WORK AREA= TRAFFIC CONE= HIGH LEVEL WARNINGDEVICE= PORTABLE SIGN= EXISTING SIGN= TYPE III BARRICADE= TYPE III BARRICADEWITH SIGN= FLASHING ARROW BOARD= FLAGMAN= TOW AWAY NO STOPPINGANY TIME= EXISTING DRIVEWAY= TYPE II BARRICADER/C= EXISTING RED CURB= DOUBLE YELLOW LANE LINES= EXISTING STRIPINGS= SIGNALIZED INTERSECTION= EXISTING LANE FLOW DIRECTION= DIRECTION TRAFFIC FLOW= PORTABLE FLASHING BEACONCERTIFIEDFLAGGER WORK HOURS MON-FRI 9:00 AM TO 3:00 PMDAY TIMETHIS SQUARE FOR CIVIL STAMP ONLYMATCHLINE <br />MATCHLINE AERIAL FIBER PLACEMENT(WORK AREA 2, PHASE 6 OF 16) TUXEDO AVE. & MIDDLEFIELD AVE.