Laserfiche WebLink
N <br />0 50 100 150 <br />SIGN PANEL SIZE <br />LEGEND <br />A <br />= TEMPORARY SIGN STAND <br />= TRAFFIC FLOW DIRECTION 48" X 48" <br />= CHANNELIZER (SPACING PER TABLE 1 ON CALTRANS STD PLAN T9) <br />L <br />N <br />DTE <br />A <br />S <br />T <br />OF C AGRESTEREFPROESSO <br />F NIARO ERE <br />GENN <br />AL <br />II <br />I <br />I12/21/20 <br />= PORTABLE FLASHING BEACON <br />K-RAIL INSTALLATION/REMOVAL <br />Exp. 9/30/21 <br />No. 81219 <br />ERNESTO CASILLAS <br />CIVIL <br />CONTRACTOR NOTES: <br />1. ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE LATEST EDITION OF CALIFORNIA MANUAL OF UNIFORM TRAFFIC CONTROL <br />DEVICES (MUTCD) AND CALTRANS STANDARD PLANS AND SPECIFICATIONS. <br />2.CALTRANS, THE LOCAL FIRE DEPARTMENT, SHERIFF/POLICE DEPARTMENT, CALIFORNIA HIGHWAY PATROL, LOCAL SCHOOL <br />DISTRICT, TRANSIT SERVICE PROVIDERS AND UNITED STATES POSTAL SERVICE SHALL BE NOTIFIED 72 HOURS IN ADVANCE OF <br />CONSTRUCTION WORK. <br />3. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE REPAIR OF ANY DAMAGE TO EXISTING IMPROVEMENTS RESULTING FROM THE <br />CONTRACTOR'S OPERATION. THIS REPAIR SHALL INCLUDE ALL CONSTRUCTION AND MATERIALS TO RESTORE THE SITE TO EXISTING <br />CONDITIONS. <br />4. EACH ADVANCED WARNING SIGN ON EACH SIDE OF THE ROADWAY SHALL BE EQUIPPED WITH AT LEAST TWO FLAGS. FLASHING <br />BEACONS SHALL BE PLACED AT THE LOCATION INDICATED FOR LANE CLOSURE DURING HOURS OF DARKNESS. <br />5. ALL WORKERS SHALL BE EQUIPPED WITH A REFLECTIVE VEST AND HARD HAT. ALL FLAGGERS SHALL ALSO BE EQUIPPED WITH A <br />C28 "STOP/SLOW" PADDLE AND SHALL BE TRAINED IN THE PROPER FUNDAMENTALS OF FLAGGING TRAFFIC. <br />6. NO PARKING SIGNS SHALL BE PLACED 72 HOURS PRIOR TO SET UP. SIGNS SHALL BE POSTED EVERY 20 LINEAR FEET OF OCCUPIED <br />SPACE WITH AT LEAST ONE SIGN AT EACH END OF OCCUPIED SPACE. <br />7. ANY CONFLICTING SIGNS WILL BE COVERED FOR THE LENGTH OF THE JOB. <br />8. CONTRACTOR SHALL MAINTAIN EMERGENCY VEHICLE AND DRIVEWAY ACCESS AT ALL TIMES. <br />9. PACIFIC GAS & ELECTRIC COMPANY ASSUMES NO LIABILITY WHEN CONTRACTOR DOES OWN SET UP OR MAKES CHANGES TO THE <br />ORIGINAL TRAFFIC CONTROL PLAN. <br />10.STATE/COUNTY ENGINEER OR HIS REPRESENTATIVE HAS THE AUTHORITY TO INITIATE FIELD CHANGES TO ASSURE PUBLIC SAFETY. <br />11.CONTRACTOR SHALL PLATE EXCAVATED AREA DURING NON-WORKING HOURS. <br />FOR THIS SHEET <br />TRAFFIC CONTROL <br />ONE SHIFT SETUP <br />K-RAIL INSTALL/REMOVAL ONLY <br />= TEMPORARY 20' CONCRETE RAIL (TYPE K) <br />= CRASH CUSHION (ABSORB NCHRP 350 10-ELEMENT SYSTEM) <br />48" X 24"D <br />COUNTY POST MILE SHEET <br />NO <br />TOTAL <br />SHEET <br />14.912SJ10 1 2 <br />ROUTEDIST. <br />TYPICAL CROSS SECTION OF HWY-12 <br />(LOOKING EAST) <br />NOT TO SCALE <br />WORK ZONE <br />11' +/- SHOULDER <br />12' +/- LANE 12' +/- LANE <br />K-RAIL <br />EP ETW ETW <br />10' +/- SHOULDER <br />2'+/- <br />= RUMBLE STRIP (SEE SHEET T13 ON CALTRANS STD PLAN) <br />CONE <br />360' BUFFER <br />100' TAPER175' <br />175'175'175'175'350' <br />550' <br />175'50' <br />TAPER <br />175'175'350'175'175' <br />BE <br />PREPARED <br />TO STOP <br />W3-4 <br />A <br />C9A (CA) <br />A <br /> AHEAD <br />ONE LANE <br /> ROAD <br />W20-4 <br />A <br />C45 (CA) <br />A <br />RUMBLE <br />STRIPS <br />W20-1 <br />WORK <br />ROAD <br />AHEAD <br />A <br />ROAD WORK <br />END <br />D <br />G20-2 <br />APPROX <br />CALTRANS <br />ROW <br />C45 (CA) <br />A <br />BE <br />PREPARED <br />TO STOP <br />W3-4 <br />AC9A (CA) <br />A <br /> AHEAD <br />ONE LANE <br /> ROAD <br />W20-4 <br />A <br />W20-1 <br />WORK <br />ROAD <br />AHEAD <br />A <br />RUMBLE <br />STRIPS <br />W20-1 <br />WORK <br />ROAD <br />AHEAD <br />A <br />ROAD WORK <br />END D <br />G20-2 <br />APPROX <br />CALTRANS <br />ROW <br />E MIRA VISTA LN <br />VIEW LNHWY-12 (45 MPH) <br />K-RAIL TO BE <br />INSTALLED <br />PROJECT NOTES <br />1 PROVIDE ADDITIONAL FLAGGER AS NECESSARY. <br />CONTRACTOR SHALL ALLOW INGRESS/EGRESS ACCESS <br />AT ALL TIMES DURING CONSTRUCTION.2 <br />1 <br />1 <br />22