Laserfiche WebLink
California MUTCD 2014 Edition Page 1117 <br />(FRWA's MUTCD 2009 Edition, including Revisions 1 & 2, as amended for use in California) <br />Tahie 6F-101 (CAI. Maximum SDacina of Channeiizina Devices <br />Speed <br />(mph) <br />Maximum Channefizing Devices Spacing <br />Taper` <br />(feet) <br />Tangent <br />(feet) <br />Conflict' <br />(feet) <br />20 <br />20 <br />40 <br />10 <br />25 <br />25 <br />50 <br />12 <br />30 <br />30 <br />60 <br />15 <br />35 <br />35 <br />70 <br />17 <br />40 <br />40 <br />80 <br />20 <br />45 <br />45 <br />90 <br />22 <br />50 <br />50 <br />100 <br />25 <br />55 <br />50 <br />100 <br />25 <br />60 <br />50 <br />100 <br />65 <br />50 <br />100 <br />q25 <br />70 <br />50 <br />100 <br />75 <br />50 <br />100 <br />25 <br />Maximum channelizing device spacing for all speeds on one-laneftwo-way tapers is <br />20 feet. <br />Maximum channeiizing device spacing for all speeds on downstream tapers is 20 <br />feet. <br />All other tapers are as shown. <br />"Use on intermediate and short-term projects for taper and tangent sections where - <br />there are no pavement markings or where there is a conflict between existing <br />pavement markings and channellAng devices. <br />Chapter 6F - Temporary Traffic Control Zone Devices November 7, 2014 <br />Put 6 - Temporary Traffic Control <br />