Laserfiche WebLink
PS-2100146 January 15, 2021 <br /> <br />SPECIAL CONDITIONS FOR <br />CALTRANS – LOCKE ROAD CLOSURE <br />ENCROACHMENT PERMIT <br /> <br />1. Maintain traffic controls for all roads. Traffic control delays shall not exceed 15 minutes. <br />Two-way traffic shall be maintained during non-working hours with excavated areas backfilled or <br />plated. <br /> <br />2. Access to all properties shall be maintained at all times except when work is occurring at the <br />access point. Minimal delays will be allowed to provide access within the work zone area. <br />Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br />contractor shall be replaced with in-kind or better materials. <br /> <br />3. Residents and businesses shall be notified in advance of any impacts to their access. <br /> <br />4. Existing fences shall not be removed without written consent of the property owner. Such consent <br />shall be submitted to the County prior to the removal. Fences removed shall be restored with in- <br />kind or better materials. Restored fences shall not encroach into County right-of -way. <br /> <br />5. All destroyed or obliterated pavement markings on County roads must be replaced in kind by the <br />permittee. Typical pavement markings include but not limited to lane lines, centerlines, stop and <br />stop ahead legends, limit lines, raised pavement markers and miscellaneous delineators. <br /> <br />6. The Permittee is responsible for the preservation of survey monuments located within the area of <br />work herein permitted. Prior to the start of construction, survey monuments that potentially may <br />be disturbed shall be located and referenced by a Licensed Land Surveyor, and a Corner Record <br />filed with the County Surveyor. Any Survey Monuments disturbed during the course of <br />construction shall be reestablished by a Licensed Land Surveyor and another Corner Record filed <br />with the County Surveyor. (Land Surveyors’ Act Section 8771) <br /> <br />7. County roads shall be kept clean from mud and debris at all times along the access points and <br />work zone areas during entire project. All standard roadway striping and signage shall be clearly <br />visible, maintained and restored throughout the construction zone during and after the project. <br /> <br />8. In addition to standard dust control measures, streets shall be maintained in a clean condition, <br />free of dirt, mud and debris during construction activities. The contractor shall provide daily, or as <br />needed, street sweeping using a modern mechanical or vacuum-assisted street sweeper. <br /> <br />9. The contractor shall not conduct construction operations in rain or heavy fog conditions. <br />