My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits-2021_PS-2100000 thru PS-2100500_-PS-2100020
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2021
>
PS-2100000 thru PS-2100500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits-2021_PS-2100000 thru PS-2100500_-PS-2100020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2023 10:10:23 AM
Creation date
1/17/2023 10:09:02 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2100020
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2021
Notes2
Telegraph Ave. Between Wallace Ave. & Kirk Ave.
Address
PO Box 3031, Modesto,CA 95353
Application
Pacific Gas & Electric-Modesto
Type
Temp. Road Closure
Supplemental fields
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PS-2100020 January 6, 2021 <br /> <br />SPECIAL CONDITIONS FOR <br />PG&E – TELEGRAPH AVE. – PM# 35204009 <br />ENCROACHMENT PERMIT <br /> <br />1. Maintain traffic controls for all roads. Traffic control delays shall not exceed 10 minutes. <br />Two-way traffic shall be maintained during non-working hours with excavated areas backfilled or <br />plated. During working hours, two-way traffic control shall be maintained with one lane open and <br />appropriate flaggers. <br /> <br />2. Full road closure allowed for 1-day on January 22, 2021 from 8:00 AM to 4:00 PM on Telegraph <br />Avenue. <br /> <br />3. Access for local traffic, pedestrian traffic and emergency services shall be maintained at all times. <br /> <br />4. Applicant shall notify and coordinate with all emergency services (fire, police, etc.), local schools <br />and the local postmaster a minimum of seven days prior to the road closure. <br /> <br />5. School Buses shall be passed through the work zone with minimal delays. Children walking to <br />school shall be escorted through the work zone. <br /> <br />6. Access to all properties shall be maintained at all times except when work is occurring at the <br />access point. Minimal delays will be allowed to provide access within the work zone area. <br />Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br />contractor shall be replaced with in-kind or better materials. <br /> <br />7. Residents and businesses shall be notified in writing, as approved by the County, 48 hours in <br />advance of any impacts to their access. <br /> <br />8. Any areas where parking is to be restricted shall have signs noting the restrictions in place at <br />least 48 hours in advance. <br /> <br />9. The Permittee is responsible for the preservation of survey monuments located within the area of <br />work herein permitted. Prior to the start of construction, survey monuments that potentially may <br />be disturbed shall be located and referenced by a Licensed Land Surveyor, and a Corner Record <br />filed with the County Surveyor. Any Survey Monuments disturbed during the course of <br />construction shall be reestablished by a Licensed Land Surveyor and another Corner Record filed <br />with the County Surveyor. (Land Surveyors’ Act Section 8771) <br /> <br />10. All future maintenance of the power pole and related facilities within the County right-of-way will <br />require a San Joaquin County Encroachment Permit. <br /> <br />11. County roads shall be kept clean from mud and debris at all times along the access points and <br />work zone areas during entire project. All standard roadway striping and signage shall be clearly <br />visible, maintained and restored throughout the construction zone during and after the project. <br /> <br />12. The contractor shall not conduct construction operations in rain or heavy fog conditions.
The URL can be used to link to this page
Your browser does not support the video tag.