Laserfiche WebLink
NOTES: <br />1. If the distance between cross—cuts are less then 150' the entire area between <br />corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br />2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br />R-29. <br />3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br />the shoulder or lane, only that area shall be resufaced as shown. <br />4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br />Coat for that half of the roadway containing the trench can be used in lieu of <br />resurfacing. Section 2-5.03 (8-2). <br />Paved Shoulder <br />rAj <br />OU <br />E 2 <br />JU <br />�• TRENCH CUTTING POLICY """" " <br />V" CROSS CUTTING OF ALI'j <br />'v � COUNTY ROADWAYS xo. e.N.ioo.an ooaa <br />A r COUNTY OF SAN JOAQUlN <br />oaPns�xa+wmacwosss <br />Working for YOU Date: Dec 2014 Std. Dwg. No. R-36 <br />Sol <br />or <br />Fez <br />7%0 <br />Poil <br />irolilo 17011111111, <br />101 <br />1110 <br />OU <br />E 2 <br />JU <br />�• TRENCH CUTTING POLICY """" " <br />V" CROSS CUTTING OF ALI'j <br />'v � COUNTY ROADWAYS xo. e.N.ioo.an ooaa <br />A r COUNTY OF SAN JOAQUlN <br />oaPns�xa+wmacwosss <br />Working for YOU Date: Dec 2014 Std. Dwg. No. R-36 <br />