Laserfiche WebLink
To: KLUDTPROPANE <br />1126 E. PINE ST. <br />LODI, CA 95240 <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />P.O. BOX 1810-1810 E. HAZELTON AVENUE Permit No: PS -2100621 <br />STOCKTON, CALIFORNIA 95201 Start Date: 02/23/2021 <br />(209) 468-3000 Exp. Date: 02/23/2022 <br />FAX # (209) 468-9324 <br />APN No: 05139018 <br />DRIVEWAY ENCROACHMENT PERMIT <br />Location: 17335 SUNRISE ST.; NW CORNER OF SUNRISE ST. AND HEIL ST. <br />In compliance with your request of 02/23/2021, and subject to all the terms, conditions and restrictions written below or printed as general or <br />special provisions on any part of this form. <br />Permission is hereby granted to construct One driveway w/o pipe shown on <br />Permit Application No. PS -2100621 Quad: NE <br />Jobsite shall be kept in a safe condition at all times by removing daily any excess dirt or debris which might be a hazard to pedestrian and/or <br />vehicular traffic. Adequate lights, signs and barricades shall be placed and maintained by the Permittee for the protection of the public in <br />accordance with the current Caltrans Standard Specifications. <br />A(n) (SEE STAMP) SEE STAMP inside diameter per section 62 of the current Caltrans Standard Specifications, ALTERNATIVE PIPE <br />AND PIPE ARCH CULVERTS, shall be installed in roadside drainage ditch for drainage flow maintenance and shall be of sufficient length to <br />clear toe of approach fill or headwalls. <br />The entire area of driveway approach(es), include flares for turning and /or paved frontage(s), from the edge of roadway pavement to <br />right -of --way (front property) line shall be surfaced with a two inch (2") minimum of asphalt concrete over a (6 inch) S x inch minimum of <br />compacted layer of three-quarter inch (3/4") maximum size aggregate base material (road gravel) conforming to Class 2 Aggregate Base <br />specified in Section 26 of the current Caltrans Standard Specification, or with a four inch (4") minimum ofportland cement concrete. <br />If portland cement concrete pavement is installed, expansion joints shall be provided at the edge of pavement and along property <br />line. Surface <br />grades of approaches) and/or to open ends of pipe. No ponding or puddles on pavement surface shall be allowed. <br />Permittee shall call the Department of Public Works, Field Engineering Division (Permit Inspections) at (209) 953-7421 at least two <br />business days prior to beginning any work within the County right -of --way. After completion of the work permitted herein, all <br />debris, lumber, barricades or any excess material shall be removed and the jobsite left in a neat workmanlike condition. The <br />Permittee shall fill out and mail notice of <br />completion provided by Grantor. <br />Driveway(s) <br />shall be complete prior to occupancy of the residence, <br />but not to exceed expiration date. <br />No pipe is required under and <br />across driveway <br />Nppprohch at thlt tiele. However, if in the future <br />It b llet�rmlaed by the County that pipe will be <br />aired at this location, it shall be the responsi- <br />l?i the property owner to supply needed <br />,,.. n.,..n�n Hxnn+wrnantC. <br />FORMS: R-17, SS/WW <br />KRIS BALAJI, Director <br />Department o Pu lic Works <br />By <br />Per ' section <br />