Laserfiche WebLink
SPECIAL PROVISIONS <br />Winter Weather Utility Worlc <br />I. SUPERVISION: The utility company (permittee) shall furnish full-time supervision of all work to insure <br />compliance with the permit provision. <br />2. START OF WORK: No work within the County right-of-way shall be started until the utility company <br />representative has made an evaluation of weather conditions and has determined the work can be <br />accomplished under the provisions of the permit. <br />3. CLEAN <br />PAVEMENT: <br />Dirt and <br />mud <br />shall not be <br />deposited on the <br />pavement outside the area of work, <br />and if inadvertently tracked <br />onto the <br />road <br />travel way <br />shall be removed <br />immediately. <br />4. DAILY RESTORATION: Private driveways and road intersections shall be restored daily. <br />5. WEATHER -TIGHT CONDITIONS: All trenches shall be filled and compacted, ditches and other <br />drainage facilities regarded and opened, and the entire work area restored to weather -tight condition prior to <br />any rain. <br />x:\ENCRGACfIh1ENT5\General Provisions ([ncmx<liment Pemiils)\\Vin\er \Ventl�er Yrarisions Mcn <br />