My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits-2021_Driveway Permits_PS-2103501 thru PS-2104000_-PS-2103754
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2021
>
DRIVEWAY PERMITS
>
PS-2103501 thru PS-2104000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits-2021_Driveway Permits_PS-2103501 thru PS-2104000_-PS-2103754
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2023 8:56:43 AM
Creation date
1/18/2023 8:54:05 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2103754
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2021
Notes2
4117 W. Oakridge Wy., Stockton; West of Fairway Approximately 134.76 Ft. South of Cliff St.
Address
3121 Fairway Dr., Stockton,CA 95219-7129
Application
Fowler, Harold & Vickie
Type
Driveway Encroachment
Supplemental fields
APN
10904014
Cross Ref
PWP110005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SPECIAL PROVISIONS <br />Winter Weather Utility Work <br />1. SUPERVISION: The utility company (permittee) shall furnish full-time supervision of all work to insure <br />compliance with the permit provision. <br />2. START OF WORK: No work within the County right-of-way shall be started until the utility company <br />representative has made an evaluation of weather conditions and has determined the work can be <br />accomplished under the provisions of the permit. <br />3. CLEAN PAVEMENT: Dirt and mud shall not be deposited on the pavement outside the area of work, <br />and if inadvertently tracked onto the road travel way shall be removed immediately. <br />4. DAILY RESTORATION: Private driveways and road intersections shall be restored daily. <br />5. WEATHER -TIGHT CONDITIONS: All trenches shall be filled and compacted, ditches and other <br />drainage facilities regarded and opened, and the entire work area restored to weathertight condition prior to <br />any rain. <br />\:\ENCRGACHn1EN'fS\Genernl Pmvisians (Encroachment Pcmri�s)\\Vinter \Vea\her Provisions docs <br />
The URL can be used to link to this page
Your browser does not support the video tag.