Laserfiche WebLink
LINE -TYPES <br />THIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIAL <br />DESIGN: REV DESCRIPTION DATE <br />DRAWN BY: SEFNCO 7/3/2019 <br />APPROVED, <br />APPROVED: <br />APPROVED: <br />GENERAL NOTES: <br />I ALL VAULTS HANONCILES TO BE EQUIPPED WITH SECURITY i -IDS NTH LOCKING BOLTS <br />2 GROUND RESTORATION,RIGHT-Oi -WAY SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION <br />3 ALL 90 DEGREE BENDS IN CONDUIT CONSTRUCTION WILL BE A MINIMUM OF ars" RADUSUNLESS <br />SPECIFIED OTHERWISE <br />4 BURIED FIBER OPTIC WARNING SIGNS SHALL BE PLACED AT EACH SIDE OF ALL ROAD CROSSINGS, <br />AT CULVERTS PITCHES AND IN A STRAIGHT LINE OF S'GHT SPACING OF APPROXIMATELY 50o FEET <br />5 DEVIATIONS FROM THE ENGINEERED ROUTE REQUIRES A PROJECT MANAGER AND RIGHT-OF-WAY <br />OWNER OR CARETAKER APPROVAL PRIOR TO CONSTRUCTION. <br />6 WHERE PERMITS FROM STATE COUNTY, CITY, RAILROAD OR GOVERNMENT AGENCIES ARE <br />REQUIRED, ALL WORK PERFORMED WILL COMPLY WITH THESE AGENCIES STANDARD <br />SPECIFICATIONS <br />7 THE PROJECT MANAGER WILL NOTIFY BUILDING MANAGEMENT WHEN WORK WILL BEGIN ON <br />BUILDING CONTRACTOR TO COORDINATE ROOM ACCESS AND WORK START AND STOP TIMES <br />NTH BUILDING MANAGEMENT. <br />0 THE PROJECTMANAGER 15 TO BE NOTIFIED 8Y THE CONTRACTOR 24 HOURS PRIOR TO <br />CONSTRUCTION SEE COMPANY CONTACT LIST FOR CONTACT NAME(s) AND TELEPHONE <br />NUMBER(s) <br />9 THE PROJECT MANAGER WILL RESERVE THE RIGHT TO INSPECT AT ANYTIME THE WORK BEING <br />PERFORMED BY THE CONTRACTOR, IF PROJECT MANAGER DETERMINES THAT THE WORK IS NOT <br />BEING PERFORMED TO MINIMUM QUALITY STANDARDS THEN THE CONTRACTOR SHALL PROVIDE <br />REWORK AT HIS OWN COST <br />10 ANY CHANGE IN PROJECT SCOPE INCLUDING BUT NOT LIMITED TO, CONDUIT LENGTH, CONDUIT <br />PATH AERIAL PATH ETC . MUST BE APPROVED BY THE PROJECT MANAGER. <br />11 ALL CORINGICONSTRUCTION THAT WALL CAUSE NOISE ANDIOR VIBRATION SHALL BE DONE WITHIN <br />ALLOWED (qAM-3PM) BUSINESS HOURS. <br />12 ANY AND ALL UNDERGROUND UTILITIES ENCOUNTERED ARE THE RESPONSIBILITY OF THE <br />CONTRACTOR TO LOCATE, PROTECT AND REPAIR IF DAMAGED. <br />13 ALL FOOTAGES ARE BASED ON FIELD GATHERED MEASUREMENTS, AS SUCH SOME VARIANCE <br />SHOULD BE ANTICIPATED ADJUSTAS NEEDED. <br />14 ALL BURIED CONDUITICABLE WILL BE PLACED AT 36 MINIMUMCOVER. SITE HAS POTENTIAL FOR <br />ROCK THAT WOULD PREVENT THE ABILITY TO PROVIDE THE MINIMUM COVER, IN CASES WHERE <br />THE <br />MINIMUM COVER CANNOT BE ACHIEVED, THE CONDUIT SHALL BE PLACED INA SCH 40 EMT SLEEVE <br />OR APPROVED EQUIVALENT <br />15 WATER, SEWER, STORM SEWER AND EASEMENT LOCATIONS ARE BASED OFF OF CITY MAPS <br />NOT FIELD VERIFIED <br />15 BORING OF AC PAVING IS REQUIRED ATALL LOCATIONS AS INDICATED ON PLANS <br />17 AT NO TIME SHALL CURBS, GUTTERS OR HANDICAP BE DISTURBED <br />1B DOOR HANGERS ARE TO BE PLACED A MINIMUM OF 72 HOURS PRIOR TO START OF CONSTRUCTION <br />14 PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL PLACE MESSAGE BOARDS STATING <br />LANE! <br />CLOSURES, AND DELAYS A WEEK IN ADVANCE LOCATION OF THE MASSAGE BOARD SHALL BE <br />COORDINATED WITH THE CITY INSPECTOR AT THE PRE -CONSTRUCTION MEETING <br />20 LANE CLOSURES CANNOT EXCEED MORE THAN 30D FT, ATA TIME FOR SAFETY PURPOSES THERE <br />SHALL BE ONLY ONE CLOSURE ATA TIME ALONG INTERNATIONAL BLVD MORE FLAGGERS WILL BE <br />NECESSARY TO HELP VEHICLES AND PEDESTRIANS IN THE WORK ZONES DURING THE LANE <br />CLOSURES <br />IMPORTANT NOTICi <br />Section # 4216/4217 of the Government Code requires o <br />Dig Alert Identification Number to be issued before a <br />"Permit to Excavate" will be valid For your Dig Alert I.D. <br />CALL TOLL FREE <br />48 HOURS BEFORE YOU DIG <br />UNDERGROUND SERVICE ALERT <br />1-800--227-2600 <br />FIBER PLACEMENT NOTES: <br />1 CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES 40 <br />HOURS PRIOR TO CONSTRUCTION ACTIVITY <br />SEE LOCAL DIRECTORY FOR CONTACT TELEPHONE NUMBER OF <br />LOCAL CALL BEFORE YOU DIG AGENCY <br />2 CONTRACTOR SHALL RECORD SEQUENCE N OF FIBER CABLE AT <br />EVERY WORK POLE, MANHOLE FIBER STORAGE LOOP <br />AND TAIL LOCATION CONTRACTOR TO PROVIDE PROJECT <br />MANAGER WITH SEQUENCE NUMBERS AT PROJECT <br />COMPLETION <br />3 SLACK LOOP AND SNOWSHOE STORAGE LOCATIONS SHALL BE <br />DETERMINED ON CONSTRUCTION DRAWINGS, HOWEVER <br />REEL LENGTHS OF FIVE HUNDRED FEET (500) OR LESS ON LARGE <br />COUNT FIBER OR THREE HUNDRED FEET (3007 OR LESS <br />ON SMALL COUNT FIBER ARE DIFFICULT TO USE AND SHOULD BE <br />PLACED AS FSL'S, NOT CUT AND RETURNED - <br />4 FIBER OPTIC IDENTIFICATION TAGS SHALL BE PLACED AT EVERY <br />NARK POLE, MANHOLE FIBER STORAGE LOOPS SPLICE <br />CASES AND WHERE INDICATED BY PROJECT MANAGER TAGS <br />NEED TO BE PLACED SO AS TO BE READ FROM THE GROUND <br />S CABLE LUBRICATION SHALL BE USED TO REDUCE FLILLING <br />TENSION LUBRICANTS MUST NOT CONTAIN ANY PETROLEUM <br />PRODUCTS <br />6 A 100 FOOT FIBER COIL MUST REMAIN IN ALL VAULTS UNLESS <br />OTHERWISE NOTED <br />7 ALL BURIED INFRASTRUCTURE MUST BE ACCOMPANIED WITH <br />WARNING TAPE AND A TRACER WIRE, AT RISER POLES THE <br />LOCATE WIRE SHALL BE ACCESSIBLE AT THE BASE OF THE RISER <br />e ALL RISERS WILL BE CAPPED AT ALL TIMES <br />9 ALL FIBER SHALL BE MARKED AS TO DIRECTION IN EACH VAULT <br />RED -NORTH GREEN-SOUTH,YELLOW-EAST, AND <br />BLUE -WEST DO NOT TAPE FIBER CABLES TOGETHER IN RISER <br />DISCLAIMER: <br />1 IT IS THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR <br />TO VERIFY ALL RIGHT OF WAY BEFORE CONSTRUCTION IS TO <br />BEGIN NO UNDERGROUND INSTALLATION REPRESENTED WITHIN <br />THESE PLAN SHEETS IS PROPOSED OUTSIDE OF THE RIGHT OF <br />WAY <br />2 THE UNDERGROUND ROUTE DEPICTED 15 PRELIMINARY AND <br />NILLIMAY VARY ONCE UTILITIES HAVE <br />BEEN FIELD LOCATED <br />3 ANCHORING FOR THE AERIAL CONSTRUCTION tS TYPICALLY <br />DETERMINED DURING CONSTRUCTION <br />AND IS COLLECTED INTHEAS•BUILT PHASE <br />LEGEND & GENERAL NOTES <br />PROD ff : 00087 <br />CONSTRUCTION <br />PROPOSED TRENCH/BORE ROUTE <br />SYSTEM: <br />- - <br />- <br />EXISTING COMCAST ROUTE <br />- <br />EXISTING TELEPHONE SYSTEM <br />- - <br />- - <br />EXISTING ELECTRICAL SYSTEM <br />EXISTING GAS SYSTEM <br />`" --- * -- - <br />EXISTING TV SYSTEM <br />- - -'- <br />EXISTING IRRIGATION SYSTEM <br />- <br />EXISTING)O1NTTRENCH <br />- <br />EXISTING SANITARY SEWER <br />EXISTING STORM DRAIN <br />- - - - <br />- <br />EXISTING WATER LINE <br />— ---C• <br />— <br />EXISTING FENCELINE <br />ROADWAY CENTER LINE <br />PROPERTY LINE <br />ABBREVIATIONS <br />COMCAST COMCA5T <br />PL <br />PROPERTY LINE <br />CL CENTER LINE <br />PUE <br />PUBLIC UTILITY EASEMENT <br />(E) EXISTING <br />R/W <br />RIGHT OF WAY <br />FOC FACE OF CURB <br />SO <br />EXISTING STORM DRAIN <br />MIN MINIMUM <br />SS <br />EXISTING SANITARY SEWER <br />MAX MAXIMUM <br />T <br />EXISTING TELEPHONE <br />COT CONDUIT <br />W <br />EXISTING WATER <br />SYMBOLS <br />NEW COMCAST POWER SUPPLY <br />NEW COMCAST LOW PROFILE <br />Q <br />TRANSFORMER <br />m 8 <br />POWER SUPPLY W! METER <br />y <br />STREET LIGHT <br />O <br />NEW COMCAST VAULT <br />Ell <br />TRAFFIC SIGNAL COMBINATION <br />m <br />NEW COMCAST FEE) E5TAL <br />FIRE HYDRANT <br />BORE FIT <br />MONUMENT <br />NEW RISER ATTACHED TO POLE <br />® <br />CATCH BASIN <br />EXISTING POLE <br />® <br />STORM DRA'N MANHOLE <br />6I <br />EXISTING COMCAST VAULT <br />WATER MANHOLE <br />® <br />EX15TING COMCAST PEDESTAL <br />SANITARY 5EWER MANHOLE <br />o <br />EXISTING IRRIGATION VAULT <br />��aa <br />SEWER CLEAN OUT <br />C3 <br />EXISTING UTILITY VAULT/PEDESTAL <br />ELECTRIC MANHOLE <br />D4— <br />GAS/WATER VALVE <br />® <br />UN DENTIFIEDMANHOLE <br />TREE/BU5H£S <br />® <br />WATER METER <br />D <br />GAS METER <br />THIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIAL <br />DESIGN: REV DESCRIPTION DATE <br />DRAWN BY: SEFNCO 7/3/2019 <br />APPROVED, <br />APPROVED: <br />APPROVED: <br />GENERAL NOTES: <br />I ALL VAULTS HANONCILES TO BE EQUIPPED WITH SECURITY i -IDS NTH LOCKING BOLTS <br />2 GROUND RESTORATION,RIGHT-Oi -WAY SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION <br />3 ALL 90 DEGREE BENDS IN CONDUIT CONSTRUCTION WILL BE A MINIMUM OF ars" RADUSUNLESS <br />SPECIFIED OTHERWISE <br />4 BURIED FIBER OPTIC WARNING SIGNS SHALL BE PLACED AT EACH SIDE OF ALL ROAD CROSSINGS, <br />AT CULVERTS PITCHES AND IN A STRAIGHT LINE OF S'GHT SPACING OF APPROXIMATELY 50o FEET <br />5 DEVIATIONS FROM THE ENGINEERED ROUTE REQUIRES A PROJECT MANAGER AND RIGHT-OF-WAY <br />OWNER OR CARETAKER APPROVAL PRIOR TO CONSTRUCTION. <br />6 WHERE PERMITS FROM STATE COUNTY, CITY, RAILROAD OR GOVERNMENT AGENCIES ARE <br />REQUIRED, ALL WORK PERFORMED WILL COMPLY WITH THESE AGENCIES STANDARD <br />SPECIFICATIONS <br />7 THE PROJECT MANAGER WILL NOTIFY BUILDING MANAGEMENT WHEN WORK WILL BEGIN ON <br />BUILDING CONTRACTOR TO COORDINATE ROOM ACCESS AND WORK START AND STOP TIMES <br />NTH BUILDING MANAGEMENT. <br />0 THE PROJECTMANAGER 15 TO BE NOTIFIED 8Y THE CONTRACTOR 24 HOURS PRIOR TO <br />CONSTRUCTION SEE COMPANY CONTACT LIST FOR CONTACT NAME(s) AND TELEPHONE <br />NUMBER(s) <br />9 THE PROJECT MANAGER WILL RESERVE THE RIGHT TO INSPECT AT ANYTIME THE WORK BEING <br />PERFORMED BY THE CONTRACTOR, IF PROJECT MANAGER DETERMINES THAT THE WORK IS NOT <br />BEING PERFORMED TO MINIMUM QUALITY STANDARDS THEN THE CONTRACTOR SHALL PROVIDE <br />REWORK AT HIS OWN COST <br />10 ANY CHANGE IN PROJECT SCOPE INCLUDING BUT NOT LIMITED TO, CONDUIT LENGTH, CONDUIT <br />PATH AERIAL PATH ETC . MUST BE APPROVED BY THE PROJECT MANAGER. <br />11 ALL CORINGICONSTRUCTION THAT WALL CAUSE NOISE ANDIOR VIBRATION SHALL BE DONE WITHIN <br />ALLOWED (qAM-3PM) BUSINESS HOURS. <br />12 ANY AND ALL UNDERGROUND UTILITIES ENCOUNTERED ARE THE RESPONSIBILITY OF THE <br />CONTRACTOR TO LOCATE, PROTECT AND REPAIR IF DAMAGED. <br />13 ALL FOOTAGES ARE BASED ON FIELD GATHERED MEASUREMENTS, AS SUCH SOME VARIANCE <br />SHOULD BE ANTICIPATED ADJUSTAS NEEDED. <br />14 ALL BURIED CONDUITICABLE WILL BE PLACED AT 36 MINIMUMCOVER. SITE HAS POTENTIAL FOR <br />ROCK THAT WOULD PREVENT THE ABILITY TO PROVIDE THE MINIMUM COVER, IN CASES WHERE <br />THE <br />MINIMUM COVER CANNOT BE ACHIEVED, THE CONDUIT SHALL BE PLACED INA SCH 40 EMT SLEEVE <br />OR APPROVED EQUIVALENT <br />15 WATER, SEWER, STORM SEWER AND EASEMENT LOCATIONS ARE BASED OFF OF CITY MAPS <br />NOT FIELD VERIFIED <br />15 BORING OF AC PAVING IS REQUIRED ATALL LOCATIONS AS INDICATED ON PLANS <br />17 AT NO TIME SHALL CURBS, GUTTERS OR HANDICAP BE DISTURBED <br />1B DOOR HANGERS ARE TO BE PLACED A MINIMUM OF 72 HOURS PRIOR TO START OF CONSTRUCTION <br />14 PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL PLACE MESSAGE BOARDS STATING <br />LANE! <br />CLOSURES, AND DELAYS A WEEK IN ADVANCE LOCATION OF THE MASSAGE BOARD SHALL BE <br />COORDINATED WITH THE CITY INSPECTOR AT THE PRE -CONSTRUCTION MEETING <br />20 LANE CLOSURES CANNOT EXCEED MORE THAN 30D FT, ATA TIME FOR SAFETY PURPOSES THERE <br />SHALL BE ONLY ONE CLOSURE ATA TIME ALONG INTERNATIONAL BLVD MORE FLAGGERS WILL BE <br />NECESSARY TO HELP VEHICLES AND PEDESTRIANS IN THE WORK ZONES DURING THE LANE <br />CLOSURES <br />IMPORTANT NOTICi <br />Section # 4216/4217 of the Government Code requires o <br />Dig Alert Identification Number to be issued before a <br />"Permit to Excavate" will be valid For your Dig Alert I.D. <br />CALL TOLL FREE <br />48 HOURS BEFORE YOU DIG <br />UNDERGROUND SERVICE ALERT <br />1-800--227-2600 <br />FIBER PLACEMENT NOTES: <br />1 CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES 40 <br />HOURS PRIOR TO CONSTRUCTION ACTIVITY <br />SEE LOCAL DIRECTORY FOR CONTACT TELEPHONE NUMBER OF <br />LOCAL CALL BEFORE YOU DIG AGENCY <br />2 CONTRACTOR SHALL RECORD SEQUENCE N OF FIBER CABLE AT <br />EVERY WORK POLE, MANHOLE FIBER STORAGE LOOP <br />AND TAIL LOCATION CONTRACTOR TO PROVIDE PROJECT <br />MANAGER WITH SEQUENCE NUMBERS AT PROJECT <br />COMPLETION <br />3 SLACK LOOP AND SNOWSHOE STORAGE LOCATIONS SHALL BE <br />DETERMINED ON CONSTRUCTION DRAWINGS, HOWEVER <br />REEL LENGTHS OF FIVE HUNDRED FEET (500) OR LESS ON LARGE <br />COUNT FIBER OR THREE HUNDRED FEET (3007 OR LESS <br />ON SMALL COUNT FIBER ARE DIFFICULT TO USE AND SHOULD BE <br />PLACED AS FSL'S, NOT CUT AND RETURNED - <br />4 FIBER OPTIC IDENTIFICATION TAGS SHALL BE PLACED AT EVERY <br />NARK POLE, MANHOLE FIBER STORAGE LOOPS SPLICE <br />CASES AND WHERE INDICATED BY PROJECT MANAGER TAGS <br />NEED TO BE PLACED SO AS TO BE READ FROM THE GROUND <br />S CABLE LUBRICATION SHALL BE USED TO REDUCE FLILLING <br />TENSION LUBRICANTS MUST NOT CONTAIN ANY PETROLEUM <br />PRODUCTS <br />6 A 100 FOOT FIBER COIL MUST REMAIN IN ALL VAULTS UNLESS <br />OTHERWISE NOTED <br />7 ALL BURIED INFRASTRUCTURE MUST BE ACCOMPANIED WITH <br />WARNING TAPE AND A TRACER WIRE, AT RISER POLES THE <br />LOCATE WIRE SHALL BE ACCESSIBLE AT THE BASE OF THE RISER <br />e ALL RISERS WILL BE CAPPED AT ALL TIMES <br />9 ALL FIBER SHALL BE MARKED AS TO DIRECTION IN EACH VAULT <br />RED -NORTH GREEN-SOUTH,YELLOW-EAST, AND <br />BLUE -WEST DO NOT TAPE FIBER CABLES TOGETHER IN RISER <br />DISCLAIMER: <br />1 IT IS THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR <br />TO VERIFY ALL RIGHT OF WAY BEFORE CONSTRUCTION IS TO <br />BEGIN NO UNDERGROUND INSTALLATION REPRESENTED WITHIN <br />THESE PLAN SHEETS IS PROPOSED OUTSIDE OF THE RIGHT OF <br />WAY <br />2 THE UNDERGROUND ROUTE DEPICTED 15 PRELIMINARY AND <br />NILLIMAY VARY ONCE UTILITIES HAVE <br />BEEN FIELD LOCATED <br />3 ANCHORING FOR THE AERIAL CONSTRUCTION tS TYPICALLY <br />DETERMINED DURING CONSTRUCTION <br />AND IS COLLECTED INTHEAS•BUILT PHASE <br />LEGEND & GENERAL NOTES <br />TYPE: OVERI,ASH <br />SHEET: 2 OF 11 <br />PROD ff : 00087 <br />CONSTRUCTION <br />SYSTEM: <br />TYPE: OVERI,ASH <br />SHEET: 2 OF 11 <br />