LINE -TYPES
<br />THIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIAL
<br />DESIGN: REV DESCRIPTION DATE
<br />DRAWN BY: SEFNCO 7/3/2019
<br />APPROVED,
<br />APPROVED:
<br />APPROVED:
<br />GENERAL NOTES:
<br />I ALL VAULTS HANONCILES TO BE EQUIPPED WITH SECURITY i -IDS NTH LOCKING BOLTS
<br />2 GROUND RESTORATION,RIGHT-Oi -WAY SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION
<br />3 ALL 90 DEGREE BENDS IN CONDUIT CONSTRUCTION WILL BE A MINIMUM OF ars" RADUSUNLESS
<br />SPECIFIED OTHERWISE
<br />4 BURIED FIBER OPTIC WARNING SIGNS SHALL BE PLACED AT EACH SIDE OF ALL ROAD CROSSINGS,
<br />AT CULVERTS PITCHES AND IN A STRAIGHT LINE OF S'GHT SPACING OF APPROXIMATELY 50o FEET
<br />5 DEVIATIONS FROM THE ENGINEERED ROUTE REQUIRES A PROJECT MANAGER AND RIGHT-OF-WAY
<br />OWNER OR CARETAKER APPROVAL PRIOR TO CONSTRUCTION.
<br />6 WHERE PERMITS FROM STATE COUNTY, CITY, RAILROAD OR GOVERNMENT AGENCIES ARE
<br />REQUIRED, ALL WORK PERFORMED WILL COMPLY WITH THESE AGENCIES STANDARD
<br />SPECIFICATIONS
<br />7 THE PROJECT MANAGER WILL NOTIFY BUILDING MANAGEMENT WHEN WORK WILL BEGIN ON
<br />BUILDING CONTRACTOR TO COORDINATE ROOM ACCESS AND WORK START AND STOP TIMES
<br />NTH BUILDING MANAGEMENT.
<br />0 THE PROJECTMANAGER 15 TO BE NOTIFIED 8Y THE CONTRACTOR 24 HOURS PRIOR TO
<br />CONSTRUCTION SEE COMPANY CONTACT LIST FOR CONTACT NAME(s) AND TELEPHONE
<br />NUMBER(s)
<br />9 THE PROJECT MANAGER WILL RESERVE THE RIGHT TO INSPECT AT ANYTIME THE WORK BEING
<br />PERFORMED BY THE CONTRACTOR, IF PROJECT MANAGER DETERMINES THAT THE WORK IS NOT
<br />BEING PERFORMED TO MINIMUM QUALITY STANDARDS THEN THE CONTRACTOR SHALL PROVIDE
<br />REWORK AT HIS OWN COST
<br />10 ANY CHANGE IN PROJECT SCOPE INCLUDING BUT NOT LIMITED TO, CONDUIT LENGTH, CONDUIT
<br />PATH AERIAL PATH ETC . MUST BE APPROVED BY THE PROJECT MANAGER.
<br />11 ALL CORINGICONSTRUCTION THAT WALL CAUSE NOISE ANDIOR VIBRATION SHALL BE DONE WITHIN
<br />ALLOWED (qAM-3PM) BUSINESS HOURS.
<br />12 ANY AND ALL UNDERGROUND UTILITIES ENCOUNTERED ARE THE RESPONSIBILITY OF THE
<br />CONTRACTOR TO LOCATE, PROTECT AND REPAIR IF DAMAGED.
<br />13 ALL FOOTAGES ARE BASED ON FIELD GATHERED MEASUREMENTS, AS SUCH SOME VARIANCE
<br />SHOULD BE ANTICIPATED ADJUSTAS NEEDED.
<br />14 ALL BURIED CONDUITICABLE WILL BE PLACED AT 36 MINIMUMCOVER. SITE HAS POTENTIAL FOR
<br />ROCK THAT WOULD PREVENT THE ABILITY TO PROVIDE THE MINIMUM COVER, IN CASES WHERE
<br />THE
<br />MINIMUM COVER CANNOT BE ACHIEVED, THE CONDUIT SHALL BE PLACED INA SCH 40 EMT SLEEVE
<br />OR APPROVED EQUIVALENT
<br />15 WATER, SEWER, STORM SEWER AND EASEMENT LOCATIONS ARE BASED OFF OF CITY MAPS
<br />NOT FIELD VERIFIED
<br />15 BORING OF AC PAVING IS REQUIRED ATALL LOCATIONS AS INDICATED ON PLANS
<br />17 AT NO TIME SHALL CURBS, GUTTERS OR HANDICAP BE DISTURBED
<br />1B DOOR HANGERS ARE TO BE PLACED A MINIMUM OF 72 HOURS PRIOR TO START OF CONSTRUCTION
<br />14 PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL PLACE MESSAGE BOARDS STATING
<br />LANE!
<br />CLOSURES, AND DELAYS A WEEK IN ADVANCE LOCATION OF THE MASSAGE BOARD SHALL BE
<br />COORDINATED WITH THE CITY INSPECTOR AT THE PRE -CONSTRUCTION MEETING
<br />20 LANE CLOSURES CANNOT EXCEED MORE THAN 30D FT, ATA TIME FOR SAFETY PURPOSES THERE
<br />SHALL BE ONLY ONE CLOSURE ATA TIME ALONG INTERNATIONAL BLVD MORE FLAGGERS WILL BE
<br />NECESSARY TO HELP VEHICLES AND PEDESTRIANS IN THE WORK ZONES DURING THE LANE
<br />CLOSURES
<br />IMPORTANT NOTICi
<br />Section # 4216/4217 of the Government Code requires o
<br />Dig Alert Identification Number to be issued before a
<br />"Permit to Excavate" will be valid For your Dig Alert I.D.
<br />CALL TOLL FREE
<br />48 HOURS BEFORE YOU DIG
<br />UNDERGROUND SERVICE ALERT
<br />1-800--227-2600
<br />FIBER PLACEMENT NOTES:
<br />1 CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES 40
<br />HOURS PRIOR TO CONSTRUCTION ACTIVITY
<br />SEE LOCAL DIRECTORY FOR CONTACT TELEPHONE NUMBER OF
<br />LOCAL CALL BEFORE YOU DIG AGENCY
<br />2 CONTRACTOR SHALL RECORD SEQUENCE N OF FIBER CABLE AT
<br />EVERY WORK POLE, MANHOLE FIBER STORAGE LOOP
<br />AND TAIL LOCATION CONTRACTOR TO PROVIDE PROJECT
<br />MANAGER WITH SEQUENCE NUMBERS AT PROJECT
<br />COMPLETION
<br />3 SLACK LOOP AND SNOWSHOE STORAGE LOCATIONS SHALL BE
<br />DETERMINED ON CONSTRUCTION DRAWINGS, HOWEVER
<br />REEL LENGTHS OF FIVE HUNDRED FEET (500) OR LESS ON LARGE
<br />COUNT FIBER OR THREE HUNDRED FEET (3007 OR LESS
<br />ON SMALL COUNT FIBER ARE DIFFICULT TO USE AND SHOULD BE
<br />PLACED AS FSL'S, NOT CUT AND RETURNED -
<br />4 FIBER OPTIC IDENTIFICATION TAGS SHALL BE PLACED AT EVERY
<br />NARK POLE, MANHOLE FIBER STORAGE LOOPS SPLICE
<br />CASES AND WHERE INDICATED BY PROJECT MANAGER TAGS
<br />NEED TO BE PLACED SO AS TO BE READ FROM THE GROUND
<br />S CABLE LUBRICATION SHALL BE USED TO REDUCE FLILLING
<br />TENSION LUBRICANTS MUST NOT CONTAIN ANY PETROLEUM
<br />PRODUCTS
<br />6 A 100 FOOT FIBER COIL MUST REMAIN IN ALL VAULTS UNLESS
<br />OTHERWISE NOTED
<br />7 ALL BURIED INFRASTRUCTURE MUST BE ACCOMPANIED WITH
<br />WARNING TAPE AND A TRACER WIRE, AT RISER POLES THE
<br />LOCATE WIRE SHALL BE ACCESSIBLE AT THE BASE OF THE RISER
<br />e ALL RISERS WILL BE CAPPED AT ALL TIMES
<br />9 ALL FIBER SHALL BE MARKED AS TO DIRECTION IN EACH VAULT
<br />RED -NORTH GREEN-SOUTH,YELLOW-EAST, AND
<br />BLUE -WEST DO NOT TAPE FIBER CABLES TOGETHER IN RISER
<br />DISCLAIMER:
<br />1 IT IS THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR
<br />TO VERIFY ALL RIGHT OF WAY BEFORE CONSTRUCTION IS TO
<br />BEGIN NO UNDERGROUND INSTALLATION REPRESENTED WITHIN
<br />THESE PLAN SHEETS IS PROPOSED OUTSIDE OF THE RIGHT OF
<br />WAY
<br />2 THE UNDERGROUND ROUTE DEPICTED 15 PRELIMINARY AND
<br />NILLIMAY VARY ONCE UTILITIES HAVE
<br />BEEN FIELD LOCATED
<br />3 ANCHORING FOR THE AERIAL CONSTRUCTION tS TYPICALLY
<br />DETERMINED DURING CONSTRUCTION
<br />AND IS COLLECTED INTHEAS•BUILT PHASE
<br />LEGEND & GENERAL NOTES
<br />PROD ff : 00087
<br />CONSTRUCTION
<br />PROPOSED TRENCH/BORE ROUTE
<br />SYSTEM:
<br />- -
<br />-
<br />EXISTING COMCAST ROUTE
<br />-
<br />EXISTING TELEPHONE SYSTEM
<br />- -
<br />- -
<br />EXISTING ELECTRICAL SYSTEM
<br />EXISTING GAS SYSTEM
<br />`" --- * -- -
<br />EXISTING TV SYSTEM
<br />- - -'-
<br />EXISTING IRRIGATION SYSTEM
<br />-
<br />EXISTING)O1NTTRENCH
<br />-
<br />EXISTING SANITARY SEWER
<br />EXISTING STORM DRAIN
<br />- - - -
<br />-
<br />EXISTING WATER LINE
<br />— ---C•
<br />—
<br />EXISTING FENCELINE
<br />ROADWAY CENTER LINE
<br />PROPERTY LINE
<br />ABBREVIATIONS
<br />COMCAST COMCA5T
<br />PL
<br />PROPERTY LINE
<br />CL CENTER LINE
<br />PUE
<br />PUBLIC UTILITY EASEMENT
<br />(E) EXISTING
<br />R/W
<br />RIGHT OF WAY
<br />FOC FACE OF CURB
<br />SO
<br />EXISTING STORM DRAIN
<br />MIN MINIMUM
<br />SS
<br />EXISTING SANITARY SEWER
<br />MAX MAXIMUM
<br />T
<br />EXISTING TELEPHONE
<br />COT CONDUIT
<br />W
<br />EXISTING WATER
<br />SYMBOLS
<br />NEW COMCAST POWER SUPPLY
<br />NEW COMCAST LOW PROFILE
<br />Q
<br />TRANSFORMER
<br />m 8
<br />POWER SUPPLY W! METER
<br />y
<br />STREET LIGHT
<br />O
<br />NEW COMCAST VAULT
<br />Ell
<br />TRAFFIC SIGNAL COMBINATION
<br />m
<br />NEW COMCAST FEE) E5TAL
<br />FIRE HYDRANT
<br />BORE FIT
<br />MONUMENT
<br />NEW RISER ATTACHED TO POLE
<br />®
<br />CATCH BASIN
<br />EXISTING POLE
<br />®
<br />STORM DRA'N MANHOLE
<br />6I
<br />EXISTING COMCAST VAULT
<br />WATER MANHOLE
<br />®
<br />EX15TING COMCAST PEDESTAL
<br />SANITARY 5EWER MANHOLE
<br />o
<br />EXISTING IRRIGATION VAULT
<br />��aa
<br />SEWER CLEAN OUT
<br />C3
<br />EXISTING UTILITY VAULT/PEDESTAL
<br />ELECTRIC MANHOLE
<br />D4—
<br />GAS/WATER VALVE
<br />®
<br />UN DENTIFIEDMANHOLE
<br />TREE/BU5H£S
<br />®
<br />WATER METER
<br />D
<br />GAS METER
<br />THIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIAL
<br />DESIGN: REV DESCRIPTION DATE
<br />DRAWN BY: SEFNCO 7/3/2019
<br />APPROVED,
<br />APPROVED:
<br />APPROVED:
<br />GENERAL NOTES:
<br />I ALL VAULTS HANONCILES TO BE EQUIPPED WITH SECURITY i -IDS NTH LOCKING BOLTS
<br />2 GROUND RESTORATION,RIGHT-Oi -WAY SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION
<br />3 ALL 90 DEGREE BENDS IN CONDUIT CONSTRUCTION WILL BE A MINIMUM OF ars" RADUSUNLESS
<br />SPECIFIED OTHERWISE
<br />4 BURIED FIBER OPTIC WARNING SIGNS SHALL BE PLACED AT EACH SIDE OF ALL ROAD CROSSINGS,
<br />AT CULVERTS PITCHES AND IN A STRAIGHT LINE OF S'GHT SPACING OF APPROXIMATELY 50o FEET
<br />5 DEVIATIONS FROM THE ENGINEERED ROUTE REQUIRES A PROJECT MANAGER AND RIGHT-OF-WAY
<br />OWNER OR CARETAKER APPROVAL PRIOR TO CONSTRUCTION.
<br />6 WHERE PERMITS FROM STATE COUNTY, CITY, RAILROAD OR GOVERNMENT AGENCIES ARE
<br />REQUIRED, ALL WORK PERFORMED WILL COMPLY WITH THESE AGENCIES STANDARD
<br />SPECIFICATIONS
<br />7 THE PROJECT MANAGER WILL NOTIFY BUILDING MANAGEMENT WHEN WORK WILL BEGIN ON
<br />BUILDING CONTRACTOR TO COORDINATE ROOM ACCESS AND WORK START AND STOP TIMES
<br />NTH BUILDING MANAGEMENT.
<br />0 THE PROJECTMANAGER 15 TO BE NOTIFIED 8Y THE CONTRACTOR 24 HOURS PRIOR TO
<br />CONSTRUCTION SEE COMPANY CONTACT LIST FOR CONTACT NAME(s) AND TELEPHONE
<br />NUMBER(s)
<br />9 THE PROJECT MANAGER WILL RESERVE THE RIGHT TO INSPECT AT ANYTIME THE WORK BEING
<br />PERFORMED BY THE CONTRACTOR, IF PROJECT MANAGER DETERMINES THAT THE WORK IS NOT
<br />BEING PERFORMED TO MINIMUM QUALITY STANDARDS THEN THE CONTRACTOR SHALL PROVIDE
<br />REWORK AT HIS OWN COST
<br />10 ANY CHANGE IN PROJECT SCOPE INCLUDING BUT NOT LIMITED TO, CONDUIT LENGTH, CONDUIT
<br />PATH AERIAL PATH ETC . MUST BE APPROVED BY THE PROJECT MANAGER.
<br />11 ALL CORINGICONSTRUCTION THAT WALL CAUSE NOISE ANDIOR VIBRATION SHALL BE DONE WITHIN
<br />ALLOWED (qAM-3PM) BUSINESS HOURS.
<br />12 ANY AND ALL UNDERGROUND UTILITIES ENCOUNTERED ARE THE RESPONSIBILITY OF THE
<br />CONTRACTOR TO LOCATE, PROTECT AND REPAIR IF DAMAGED.
<br />13 ALL FOOTAGES ARE BASED ON FIELD GATHERED MEASUREMENTS, AS SUCH SOME VARIANCE
<br />SHOULD BE ANTICIPATED ADJUSTAS NEEDED.
<br />14 ALL BURIED CONDUITICABLE WILL BE PLACED AT 36 MINIMUMCOVER. SITE HAS POTENTIAL FOR
<br />ROCK THAT WOULD PREVENT THE ABILITY TO PROVIDE THE MINIMUM COVER, IN CASES WHERE
<br />THE
<br />MINIMUM COVER CANNOT BE ACHIEVED, THE CONDUIT SHALL BE PLACED INA SCH 40 EMT SLEEVE
<br />OR APPROVED EQUIVALENT
<br />15 WATER, SEWER, STORM SEWER AND EASEMENT LOCATIONS ARE BASED OFF OF CITY MAPS
<br />NOT FIELD VERIFIED
<br />15 BORING OF AC PAVING IS REQUIRED ATALL LOCATIONS AS INDICATED ON PLANS
<br />17 AT NO TIME SHALL CURBS, GUTTERS OR HANDICAP BE DISTURBED
<br />1B DOOR HANGERS ARE TO BE PLACED A MINIMUM OF 72 HOURS PRIOR TO START OF CONSTRUCTION
<br />14 PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL PLACE MESSAGE BOARDS STATING
<br />LANE!
<br />CLOSURES, AND DELAYS A WEEK IN ADVANCE LOCATION OF THE MASSAGE BOARD SHALL BE
<br />COORDINATED WITH THE CITY INSPECTOR AT THE PRE -CONSTRUCTION MEETING
<br />20 LANE CLOSURES CANNOT EXCEED MORE THAN 30D FT, ATA TIME FOR SAFETY PURPOSES THERE
<br />SHALL BE ONLY ONE CLOSURE ATA TIME ALONG INTERNATIONAL BLVD MORE FLAGGERS WILL BE
<br />NECESSARY TO HELP VEHICLES AND PEDESTRIANS IN THE WORK ZONES DURING THE LANE
<br />CLOSURES
<br />IMPORTANT NOTICi
<br />Section # 4216/4217 of the Government Code requires o
<br />Dig Alert Identification Number to be issued before a
<br />"Permit to Excavate" will be valid For your Dig Alert I.D.
<br />CALL TOLL FREE
<br />48 HOURS BEFORE YOU DIG
<br />UNDERGROUND SERVICE ALERT
<br />1-800--227-2600
<br />FIBER PLACEMENT NOTES:
<br />1 CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES 40
<br />HOURS PRIOR TO CONSTRUCTION ACTIVITY
<br />SEE LOCAL DIRECTORY FOR CONTACT TELEPHONE NUMBER OF
<br />LOCAL CALL BEFORE YOU DIG AGENCY
<br />2 CONTRACTOR SHALL RECORD SEQUENCE N OF FIBER CABLE AT
<br />EVERY WORK POLE, MANHOLE FIBER STORAGE LOOP
<br />AND TAIL LOCATION CONTRACTOR TO PROVIDE PROJECT
<br />MANAGER WITH SEQUENCE NUMBERS AT PROJECT
<br />COMPLETION
<br />3 SLACK LOOP AND SNOWSHOE STORAGE LOCATIONS SHALL BE
<br />DETERMINED ON CONSTRUCTION DRAWINGS, HOWEVER
<br />REEL LENGTHS OF FIVE HUNDRED FEET (500) OR LESS ON LARGE
<br />COUNT FIBER OR THREE HUNDRED FEET (3007 OR LESS
<br />ON SMALL COUNT FIBER ARE DIFFICULT TO USE AND SHOULD BE
<br />PLACED AS FSL'S, NOT CUT AND RETURNED -
<br />4 FIBER OPTIC IDENTIFICATION TAGS SHALL BE PLACED AT EVERY
<br />NARK POLE, MANHOLE FIBER STORAGE LOOPS SPLICE
<br />CASES AND WHERE INDICATED BY PROJECT MANAGER TAGS
<br />NEED TO BE PLACED SO AS TO BE READ FROM THE GROUND
<br />S CABLE LUBRICATION SHALL BE USED TO REDUCE FLILLING
<br />TENSION LUBRICANTS MUST NOT CONTAIN ANY PETROLEUM
<br />PRODUCTS
<br />6 A 100 FOOT FIBER COIL MUST REMAIN IN ALL VAULTS UNLESS
<br />OTHERWISE NOTED
<br />7 ALL BURIED INFRASTRUCTURE MUST BE ACCOMPANIED WITH
<br />WARNING TAPE AND A TRACER WIRE, AT RISER POLES THE
<br />LOCATE WIRE SHALL BE ACCESSIBLE AT THE BASE OF THE RISER
<br />e ALL RISERS WILL BE CAPPED AT ALL TIMES
<br />9 ALL FIBER SHALL BE MARKED AS TO DIRECTION IN EACH VAULT
<br />RED -NORTH GREEN-SOUTH,YELLOW-EAST, AND
<br />BLUE -WEST DO NOT TAPE FIBER CABLES TOGETHER IN RISER
<br />DISCLAIMER:
<br />1 IT IS THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR
<br />TO VERIFY ALL RIGHT OF WAY BEFORE CONSTRUCTION IS TO
<br />BEGIN NO UNDERGROUND INSTALLATION REPRESENTED WITHIN
<br />THESE PLAN SHEETS IS PROPOSED OUTSIDE OF THE RIGHT OF
<br />WAY
<br />2 THE UNDERGROUND ROUTE DEPICTED 15 PRELIMINARY AND
<br />NILLIMAY VARY ONCE UTILITIES HAVE
<br />BEEN FIELD LOCATED
<br />3 ANCHORING FOR THE AERIAL CONSTRUCTION tS TYPICALLY
<br />DETERMINED DURING CONSTRUCTION
<br />AND IS COLLECTED INTHEAS•BUILT PHASE
<br />LEGEND & GENERAL NOTES
<br />TYPE: OVERI,ASH
<br />SHEET: 2 OF 11
<br />PROD ff : 00087
<br />CONSTRUCTION
<br />SYSTEM:
<br />TYPE: OVERI,ASH
<br />SHEET: 2 OF 11
<br />
|