Laserfiche WebLink
xxxxxDistCOUNTYROUTEPOST MILESTOTAL PROJECTSHEETNo.TOTALSHEETSLAST REVISION <br />STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION <br />No.Exp.CIVILR E G IS <br />T <br />ERED <br />P <br />ROFESSIONALENGINEERSTATEOFCALI <br />FOR <br />NIA REGISTERED CIVIL ENGINEERTIME PLOTTED => <br />DATE PLOTTED => <br />12:58 <br />20-JUN-2019 <br />CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISED <br />PLANS APPROVAL DATEDATEFUNCTIONAL SUPERVISORR <br />COPIES OF THIS PLAN SHEET.THE ACCURACY OR COMPLETENESS OF SCANNEDOR AGENTS SHALL NOT BE RESPONSIBLE FORTHE STATE OF CALIFORNIA OR ITS OFFICERSR <br />01-09-19USERNAME =>s113541DGN FILE =>1016000022ga001.dgnRELATIVE BORDER SCALEIS IN INCHES0123UNIT1436PROJECT NUMBER & PHASE10160000221BORDER LAST REVISED 7/2/201010992123412567891301R/WMGS LAYOUT & CONNECTION TO BRIDGE RAILING C-1CONSTRUCTION DETAIL 75.0'L= 75.0'R= 88.7'+57.22Lt 12.6'(TYPE WB-31) MGS TRANSITION RAILING+54.27Rt 15.7'(TYPE SFT)ASSEMBLYEnd ANCHORSta 125+13.70 BB13.45'Sta 126+79.43 EBNo.RCURVE DATATL1 704.51'48°47'05.05" 319.47' 599.86'11.34'137.5'Sta 123+71.63 BC <br />L <br />OL "WW" <br />Sta 129+71.69 E C <br />L O L "W W " 125.0'N41°17'11.63"E 293.80'WILSON WAY138.82'N08°57'13.21"W06-D E S IG N <br />25.0'50.0'SHAHIN MANSOUR RANJEEV GHAIRICHARD DERBY <br />NO SCALEUBLINE IN 2" PVC CONDUIT1-AT&T TELEPHONELINES IN 2-2" PVC CONDUITS2-AT&T TELEPHONE1LOCATIONNo.POSITIVE LOCATION INFORMATIONPOTHOLINGMETHOD113.7' Rt "WILSON WAY" 123+75.52DEPTH FROM OG20"2213.7' Rt "WILSON WAY" 123+75.5236"POTHOLINGDIK <br />EPOTHOLING3OWNER72"351.9'' Lt "WILSON WAY" 123+10.44GAS LINEPG&E 6" STEEL Exist DIKEMATCH A <br />A <br />OGSAW CUT SECTION A-A12.9'1.75'8" Conc REMOVEBB <br />SECTION B-B0-10.4VarOG"WW" Sta 123+87.21 To Sta 125+13.31CL"WW"38.2-13.4Var"WW" Sta 125+10.06 To Sta 125+22.97"WW"CL13.5'REMOVE AC PvmtREMOVE ConcSJAT&T (TELEPHONE)AT&T (TELEPHONE)PG&E (GAS) 21.7(TYPE WB-31) 25.0'MGS TRANSITION RAILINGLEGEND:RANJEEVKUMAR GHAI6133806/30/196-17-19SEE SHEET C-2BARRIER TRANSITIONCONCRETE +02.717Rt 11.1'ROUTE <br />9 <br />9 <br />RO <br />UT <br />E <br />9 <br />9 MGS DELINEATION MGS (WOOD POST 7') AND CIVILREGISTERED CIVIL ENGINEER01-07-19PAVEMENT CLIMATE REGION:INLAND VALLEY0.67' IMPORT BORROW0.67' REMOVE AC Pvmt+13.31Lt 13.5'End PLACE HMA DIKE (TYPE F)MGS DELINEATION MGS (WOOD POST 7') VEGETATION Cntl MAT (RUBBER)TYPE 12A LAYOUTTERMINAL SYSTEMAlt IN-LINE SEE STRUCTURE PLANS FOR STRUCTURE WORKSEE NOTE 21.2.+87.21Lt 32.8'Beg PLACE HMA DIKE (TYPE F)75.0'REMOVE GR62.5'REMOVE GRFOR ACCURATE RIGHT OF WAY DATA, CONTACTRIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE.NOTES:37